DOB filing M01427046-I1
Alteration filing at 125 Park Avenue
Building record · BIN 1036151
125 Park Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 16 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036151
125 Park Avenue
Murray Hill-Kips Bay, Manhattan
A consolidated public-record view · updated Oct 7, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 24-story office building built in 1923, on a 24,786 sq ft lot.
Owner of record
NYC TRANSIT
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 164 notices on file; the most recent was issued Aug 8, 2002.
Issued Aug 8, 2002
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036151. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 16 alteration filing. Its latest status categories are 14 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 125 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 16 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th and 19th floors (TD Securities- Marketing Floors 19 & 20) as per plans. No change to use, egress or occupancy. Filing M01174075-I1.
Modifications to the existing HVAC system on the 18th and 19th floors (TD Securities- Marketing Floors 19 & 20) as per plans. No change to use, egress or occupancy. Filing M01174100-I1.
Filing M01174100-I1 reached an approved status.
Filing M01174075-I1 reached an approved status.
DOB lists a first permit date for M01174100-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01174075-I1. That is not by itself confirmation of activity on site.
Mechanical modifications taking place on the 1st floor (lobby) as per plans filed herewith. Scope of work is limited to the removal & installation of ductwork, diffusers, electric heaters, and associated controls. No change in use, egress or occupancy. Filing M01317418-I1.
Architectural modifications taking place on the 1st floor (lobby) as per plans filed herewith. No change in use, egress or occupancy. Filing M01317405-I1.
Filing M01317405-I1 reached an approved status.
DOB lists a first permit date for M01317405-I1. That is not by itself confirmation of activity on site.
Filing M01317418-I1 reached an approved status.
DOB lists a first permit date for M01317418-I1. That is not by itself confirmation of activity on site.
Minor interior office demolition, including removal of partitions, doors, suspended ceilings and finishes on the 17th Floor (TD Securities) as per plans. No change to use, egress or occupancy. Filing M01413871-I1.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. Filing M01427046-I1.
DOB lists a first permit date for M01427046-I1. That is not by itself confirmation of activity on site.
Filing M01413871-I1 reached an approved status.
DOB lists a first permit date for M01413871-I1. That is not by itself confirmation of activity on site.
Architectural/Structural modifications taking place on the 1st floor (lobby exterior) as per plans filed herewith. No change in use, egress or occupancy. Filing M01449458-I1.
Filing M01449458-I1 reached an approved status.
Modifications to the existing plumbing system on the 17th Floor (TD Securities 16th Floor CO Floor) as per plans. No change to use, egress or occupancy. Filing M01453790-I1.
DOB lists a first permit date for M01449458-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01449458-I1 is “Permit Entire.”
Filing M01453790-I1 reached an approved status.
Minor interior office demolition, including removal of partitions, doors, suspended ceilings and finishes on the 20th and 21st Floors (TD Securities- Marketing Floors 21, 22) as per plans. No change to use, egress or occupancy. Filing M01455463-I1.
Modifications to the existing sprinkler system on the 20th & 21st Floors (TD Securities - 21st -22nd Floors Marketing) as per plans. No change to use, egress or occupancy. Filing M01455547-I1.
Minor interior demolition and modifications to the existing mechanical system, including removals and modifications to the ducts and piping on the 20th & 21st Floors (21st -22 Marketing TD Securities), as per plans. No change to use, egress, or occupancy. Filing M01455520-I1.
Modifications to the existing plumbing system on the 20th & 21st Floors (TD Securities) as per plans. No change to use, egress or occupancy. Filing M01455534-I1.
DOB lists a first permit date for M01455534-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01455534-I1 is “Permit Entire.”
Filing M01455547-I1 reached an approved status.
Filing M01455463-I1 reached an approved status.
Filing M01455520-I1 reached an approved status.
DOB lists a first permit date for M01455463-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01455463-I1 is “Permit Entire.”
DOB lists a first permit date for M01455520-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01455520-I1 is “Permit Entire.”
Installation of new partitions, doors, ceilings and finishes on the 20th and 21st floors (TD Securities- 21st and 22nd Marketing Floors) as per plans. No change to use, egress or occupancy. Filing M01450036-I1.
DOB lists a first permit date for M01455547-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01455547-I1 is “Permit Entire.”
The latest status recorded for M01413871-I1 is “Permit Entire.”
The latest status recorded for M01317418-I1 is “Permit Entire.”
The latest status recorded for M01317405-I1 is “Permit Entire.”
Modifications to the existing plumbing system on the 20th and 21st floors (TD Securities- Marketing Floors 21 + 22) as per plans. No change to use, egress or occupancy. Filing M01450095-I1.
Filing M01450036-I1 reached an approved status.
Modifications to the existing sprinkler system on the 20th and 21st floors (TD Securities- Marketing floors 21 + 22) as per plans. No change to use, egress or occupancy. Filing M01450096-I1.
Filing M01450096-I1 reached an approved status.
Modifications to the existing HVAC system on the 20th and 21st floors (TD Securities- Marketing Floors 21 + 22) as per plans. No change to use, egress or occupancy. Filing M01450094-I1.
DOB lists a first permit date for M01450096-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450096-I1 is “Permit Entire.”
DOB lists a first permit date for M01453790-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01453790-I1 is “Permit Entire.”
DOB recorded a sign-off for M01174100-I1.
The latest status recorded for M01174100-I1 is “LOC Issued.”
DOB lists a first permit date for M01450036-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450036-I1 is “Permit Entire.”
Filing M01450094-I1 reached an approved status.
Filing M01450095-I1 reached an approved status.
DOB lists a first permit date for M01450095-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01174075-I1.
The latest status recorded for M01174075-I1 is “LOC Issued.”
The latest status recorded for M01450095-I1 is “Permit Entire.”
DOB lists a first permit date for M01450094-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450094-I1 is “Permit Entire.”
The latest status recorded for M01427046-I1 is “Permit Entire.”