Building record · BIN 1036446

800 Third Avenue

800 Third Avenue, Manhattan, NY 10022

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1036446

800 Third Avenue

East Midtown-Turtle Bay, Manhattan

A consolidated public-record view · updated Sep 10, 2026

DOB filings
5
Active-status
2
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records2
First included filingSep 11, 2025
Latest recorded changeSep 10, 2026

The lot

What is already here?

The lot holds a 41-story office building built in 1970, on a 24,100 sq ft lot.

Built
1970
Floors
41
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-6
Lot area
24,100 sq ft
Building area
526,124 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 191 notices on file; the most recent was issued Sep 3, 2019.

  • Sprinkler

    Issued Sep 3, 2019 — FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019

  • Elevator

    Issued Aug 15, 2012

  • Elevator

    Issued Aug 12, 2008

  • 3 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036446. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 alteration filing. Its latest status categories are 3 recorded as completed, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 11, 2025
Latest recorded change
Sep 10, 2026
Highest proposed story count
41 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 800 Third Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to existing plumbing system on 12th and 13th floor as per plans. No change to use, egress or occupancy. Filing M01263292-I1.

    01
  2. Alteration approved

    Filing M01263292-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01263292-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. Filing M01342572-I1.

    04
  5. Alteration approved

    Filing M01342572-I1 reached an approved status.

    05
  6. Alteration filed

    Mechanical changes as indicated on plans. Filing M01342667-I1.

    06
  7. Alteration approved

    Filing M01342667-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01342572-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01342667-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Mechanical changes as indicated on plans. Filing M01417505-I1.

    010
  11. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01417505-S1.

    011
  12. Alteration approved

    Filing M01417505-I1 reached an approved status.

    012
  13. Alteration approved

    Filing M01417505-S1 reached an approved status.

    013
  14. Alteration now approved

    The latest status recorded for M01417505-S1 is “Approved.”

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01417505-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration now approved

    The latest status recorded for M01417505-I1 is “Permit Entire.”

    016
  17. Alteration signed off

    DOB recorded a sign-off for M01342667-I1.

    017
  18. Alteration now completed

    The latest status recorded for M01342667-I1 is “LOC Issued.”

    018
  19. Alteration signed off

    DOB recorded a sign-off for M01342572-I1.

    019
  20. Alteration now completed

    The latest status recorded for M01342572-I1 is “LOC Issued.”

    020
  21. Alteration signed off

    DOB recorded a sign-off for M01263292-I1.

    021
  22. Alteration now completed

    The latest status recorded for M01263292-I1 is “LOC Issued.”

    022