DOB filing M01439081-S4
Alteration filing at 345 Park Avenue
Building record · BIN 1036460
345 Park Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 18 independently sourced records, including 17 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036460
345 Park Avenue
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 44-story office building built in 1969, on a 81,337 sq ft lot.
Owner of record
345 PARK AVENUE, L.P.
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 7 open notices on record for this building, out of 366 notices on file; the most recent was issued Sep 6, 2012.
Issued Sep 6, 2012
Issued Sep 6, 2012
Issued Jul 19, 2011
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036460. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 18 alteration filing. Its latest status categories are 17 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 345 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 18 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00969267-I1.
Filing M00969267-I1 reached an approved status.
DOB lists a first permit date for M00969267-I1. That is not by itself confirmation of activity on site.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy. Filing M01408488-I1.
DOB lists a first permit date for M01408488-I1. That is not by itself confirmation of activity on site.
Plumbing work on sc2, sc1, cel and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01383157-S2.
Filing M01383157-S2 reached an approved status.
Mechanical work as shown on plans. Filing M01383157-S1.
Filing M01383157-S1 reached an approved status.
Standpipe work on the 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01383157-S5.
DOB lists a first permit date for M01383157-S1. That is not by itself confirmation of activity on site.
Mechanical work on the cellar and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01406115-S1.
DOB lists a first permit date for M01383157-S2. That is not by itself confirmation of activity on site.
Filing M01406115-S1 reached an approved status.
Filing M01383157-S5 reached an approved status.
Structural work on the 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01420539-S4.
Filing M01420539-S4 reached an approved status.
Sprinkler work on the cellar and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01420539-S3.
Plumbing work on the cellar and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01420539-S2.
Filing M01420539-S2 reached an approved status.
Filing M01420539-S3 reached an approved status.
Mechanical work as shown on plans. Filing M01383157-P2.
DOB recorded a sign-off for M00969267-I1.
The latest status recorded for M00969267-I1 is “LOC Issued.”
DOB lists a first permit date for M01383157-S5. That is not by itself confirmation of activity on site.
The latest status recorded for M01383157-S5 is “Permit Entire.”
DOB lists a first permit date for M01420539-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01420539-S3 is “Permit Entire.”
DOB lists a first permit date for M01420539-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01420539-S2 is “Permit Entire.”
Mechanical work as shown on plans filed herewith. No change in use egress or occupancy. Filing M01439081-S1.
Plumbing work as shown on plans filed herewith for office fitout. No change in use egress or occupancy. Filing M01439081-S2.
General Construction work as shown on plans filed herewith. No change in use, egress or occupancy. Filing M01439081-I1.
Plumbing work on sc2, sc1, cel and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01383157-P3.
Standpipe systems modification as shown on plans filed herewith. Filing M01439081-S5.
Filing M01383157-P2 reached an approved status.
The latest status recorded for M01383157-P2 is “Approved.”
The latest status recorded for M01383157-S1 is “Permit Entire.”
Filing M01439081-S1 reached an approved status.
Filing M01439081-S2 reached an approved status.
Filing M01439081-I1 reached an approved status.
Filing M01439081-S5 reached an approved status.
The latest status recorded for M01439081-S5 is “Approved.”
Sprinkler system work as shown on plans filed herewith. No change in use, egress, or occupancy. Filing M01439081-S6.
Mechanical work on the subcellar2, subcellar1, cellar and 1st floor, as shown on drawings. no change in use, occupancy or egress. Filing M01420539-S1.
DOB lists a first permit date for M01439081-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439081-I1 is “Permit Entire.”
Filing M01383157-P3 reached an approved status.
The latest status recorded for M01383157-P3 is “Approved.”
DOB lists a first permit date for M01406115-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01406115-S1 is “Permit Entire.”
DOB lists a first permit date for M01420539-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01420539-S4 is “Permit Entire.”
The latest status recorded for M01383157-S2 is “Permit Entire.”
Interior structural work as shown on plans filed herewith. Filing M01439081-S4.
Filing M01439081-S4 reached an approved status.
Filing M01420539-S1 reached an approved status.
The latest status recorded for M01420539-S1 is “Approved.”
The latest status recorded for M01408488-I1 is “Permit Entire.”
DOB lists a first permit date for M01439081-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01439081-S1 is “Permit Entire.”
DOB lists a first permit date for M01439081-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01439081-S2 is “Permit Entire.”
Filing M01439081-S6 reached an approved status.
The latest status recorded for M01439081-S6 is “Approved.”
DOB lists a first permit date for M01439081-S4. That is not by itself confirmation of activity on site.
The latest status recorded for M01439081-S4 is “Permit Entire.”