DOB filing M01420378-I1
Alteration filing at 600 Lexington Avenue
Building record · BIN 1036466
600 Lexington Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1036466
600 Lexington Avenue
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Sep 25, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 35-story office building built in 1983, on a 11,050 sq ft lot.
The apartments
186 condominium apartments are assessed on this block, and the typical one is 1,638 sq ft (152 m²). They run from 96 to 628 m².
The city values the typical one at $860,731. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
7 apartments on this tax block changed hands in the year the city last published, at a median of $5,300,000, from 2,375,000 to 8,950,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
375 PARK FEE LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 4 open notices on record for this building, out of 54 notices on file; the most recent was issued Nov 1, 2023.
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
Issued Feb 20, 2023 — CYCLE 9B UNSAFE REPORT FILED
Issued May 31, 2000 — 1P32797
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1036466. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 1 under review, 2 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 600 Lexington Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Herewith Filing Modification to Existing Mechanical System, work scope includes the installation of new water cooled heat pumps and piping as per plans. No Change in Use, Egress or Occupancy is proposed under this application. Filing M01287111-I1.
Filing M01287111-I1 reached an approved status.
DOB lists a first permit date for M01287111-I1. That is not by itself confirmation of activity on site.
Filing herewith drawings indicating modification of the Plumbing on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application. Filing M01331169-I1.
Filing M01331169-I1 reached an approved status.
DOB lists a first permit date for M01331169-I1. That is not by itself confirmation of activity on site.
Filing herewith drawings indicating modification of the Sprinkler System on the 32nd floor (marketed as the 33rd floor). No change in use, egress, or occupancy under this application. Filing M01372972-I1.
Filing M01372972-I1 reached an approved status.
DOB lists a first permit date for M01372972-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01372972-I1 is “Permit Entire.”
DOB recorded a sign-off for M01287111-I1.
The latest status recorded for M01287111-I1 is “LOC Issued.”
DOB recorded a sign-off for M01331169-I1.
The latest status recorded for M01331169-I1 is “LOC Issued.”
Replacement. no change to egress, use, or occupancy. Filing M01420378-I1.
The latest status recorded for M01420378-I1 is “Prof Cert QA Review.”