DOB filing M01100668-I1
Alteration filing at 110 East 59 Street
Building record · BIN 1037165
110 East 59 Street, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1037165
110 East 59 Street
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 36-story office building built in 1969, on a 26,750 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 117 notices on file; the most recent was issued May 10, 2023.
Issued May 10, 2023 — CYCLE 9C UNSAFE REPORT FILED
Issued Dec 29, 2021
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1037165. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 10 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 110 East 59 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Garage Repair for 109 East 58th Street aka 110 East 59th Street. Filing M01100668-I1.
Filing M01100668-I1 reached an approved status.
DOB lists a first permit date for M01100668-I1. That is not by itself confirmation of activity on site.
Interior renovation on 32nd floor as per plans filed herewith - no change in use, egress, or occupancy. Filing M01424565-I1.
Sprinkler modifications filed herewith. Filing M01425311-I1.
Modifications to the existing Mechanical system on the 32nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egressnd. Filing M01424602-I1.
Filing M01424565-I1 reached an approved status.
Filing M01425311-I1 reached an approved status.
Filing M01424602-I1 reached an approved status.
Modifications to the existing plumbing fixtures on the 29th Floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. Filing M01431344-I1.
Installation of new sprinkler system on 29th floor as per plans submitted herewith. No Change to Use, Occupancy group, or egress. Filing M01431334-I1.
Modifications to the existing Mechanical systems on the 29 th floor as per plans submitted herewith. No Change to Use, Occupancy or Egress. Filing M01431327-I1.
Filing M01431344-I1 reached an approved status.
Filing M01431334-I1 reached an approved status.
Interior Alterations to the 29th floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress. Filing M01431318-I1.
Filing M01431318-I1 reached an approved status.
Filing M01431327-I1 reached an approved status.
Filing herewith structural modifications including stair infill as per plans. no change in use, egress, or occupancy. Filing M01431364-I1.
Filing M01431364-I1 reached an approved status.
Installation of new sprinkler system on 29th floor as per plans submitted herewith. No Change to Use, Occupancy group, or egress. Filing M01431334-P1.
DOB lists a first permit date for M01424602-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01424602-I1 is “Permit Entire.”
DOB lists a first permit date for M01424565-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01424565-I1 is “Permit Entire.”
DOB lists a first permit date for M01431364-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01431364-I1 is “Permit Entire.”
DOB lists a first permit date for M01431318-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01431318-I1 is “Permit Entire.”
DOB lists a first permit date for M01431327-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01431327-I1 is “Permit Entire.”
Filing M01431334-P1 reached an approved status.
The latest status recorded for M01431334-P1 is “Approved.”
DOB lists a first permit date for M01431344-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01431344-I1 is “Permit Entire.”
DOB lists a first permit date for M01431334-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01431334-I1 is “Permit Entire.”
DOB lists a first permit date for M01425311-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425311-I1 is “Permit Entire.”
The latest status recorded for M01100668-I1 is “Permit Entire.”