Building record · BIN 1038000

777 3 Avenue

777 3 Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1038000

777 3 Avenue

East Midtown-Turtle Bay, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
17
Active-status
15
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings17
Open or active-status records15
First included filingSep 3, 2024
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 39-story office building built in 1964, on a 26,900 sq ft lot.

  1. Floors 2–39Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 47 — the tallest thing within 60 m to the south is 139.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 142.3 m over 39 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1964
Last altered
2010
Floors
39
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-6
Lot area
26,900 sq ft
Building area
563,420 sq ft

The apartments

253 condominium apartments are assessed on this block, and the typical one is 782 sq ft (73 m²). They run from 40 to 465 m².

The city values the typical one at $266,874. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

15 apartments on this tax block changed hands in the year the city last published, at a median of $1,715,000, from 725,000 to 2,650,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

CMCSSG 221E48, LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 111 notices on file; the most recent was issued Jan 3, 2017.

  • (other bldgs types) - elevator affirmation of

    Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST

  • Construction

    Issued May 15, 1995

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1038000. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 17 alteration filing. Its latest status categories are 14 approved, 2 recorded as completed, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 3, 2024
Latest recorded change
Nov 10, 2026
Highest proposed story count
39 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 777 3 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Remove 64 sprinkler heads, relocate 11 sprinkler heads & install new 128 sprinkler heads and piping. Filing M01092433-S3.

    01
  2. Alteration approved

    Filing M01092433-S3 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01092433-S3. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Remove and construct interior partitions, ceilings & doors. Filing M01285552-I1.

    04
  5. Alteration approved

    Filing M01285552-I1 reached an approved status.

    05
  6. Alteration filed

    Modify ductwork. Filing M01285552-S1.

    06
  7. Alteration approved

    Filing M01285552-S1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01285552-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01285552-S1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Removal & construction of interior partitions, ceilings & doors. Filing M01299128-I1.

    010
  11. Alteration approved

    Filing M01299128-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01299128-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration signed off

    DOB recorded a sign-off for M01299128-I1.

    013
  14. Alteration now completed

    The latest status recorded for M01299128-I1 is “LOC Issued.”

    014
  15. Alteration filed

    Removal and construction of interior partitions, ceilings,doors, and floors as shown on drawings filed herewith. no change touse, egress, or occupancy. Filing M01445684-I1.

    015
  16. Alteration filed

    Remove 22 sprinkler heads and piping. install 306 new permanentheads and piping. Filing M01445684-S3.

    016
  17. Alteration approved

    Filing M01445684-S3 reached an approved status.

    017
  18. Alteration filed

    New 2 sinks, 2 dishwashers, 2 hwhnongas, 2 funnel drains, 1 water filter, 1 water closet, 1 lav, 1 urinal, 1 sanitary piping & 1 water piping. Filing M01445684-S2.

    018
  19. Alteration approved

    Filing M01445684-S2 reached an approved status.

    019
  20. Alteration approved

    Filing M01445684-I1 reached an approved status.

    020
  21. Alteration filed

    Modify ductwork and install new ac units. Filing M01445684-S1.

    021
  22. Alteration approved

    Filing M01445684-S1 reached an approved status.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for M01445684-S1. That is not by itself confirmation of activity on site.

    023
  24. Alteration now approved

    The latest status recorded for M01445684-S1 is “Permit Entire.”

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01445684-I1. That is not by itself confirmation of activity on site.

    025
  26. Alteration now approved

    The latest status recorded for M01445684-I1 is “Permit Entire.”

    026
  27. Alteration filed

    Remove and construct interior partitions, ceilings & doors as shown on plans filed herewith. no change in use, egress or occupancy. Filing M01469088-I1.

    027
  28. Alteration filed

    Propose to remove 21 sprinkler heads and piping & install 290 new permanent sprinkler heads and piping as shown on plans filed herewith. no change in use, egress or occupancy. Filing M01469088-S4.

    028
  29. Alteration approved

    Filing M01469088-S4 reached an approved status.

    029
  30. Alteration approved

    Filing M01469088-I1 reached an approved status.

    030
  31. Alteration filed

    Install new ductwork and units as shown on plans filed herewith. no change in use, egress or occupancy. Filing M01469088-S2.

    031
  32. Alteration filed

    Propose to install 3 sinks, 1 dishwasher, 2 hotwaterheaters(nongas), 2 water filters, 1 drinking fountain, 3 funnel drains, 1 water piping & 1 sanitary piping as shown on plans filed herewith. no change in use, egress or occupancy. Filing M01469088-S3.

    032
  33. Alteration filed

    Structural work inclusive of framing and installation of new modern fold partitions support, support of print equipment and ballistic rated partitions as shown on plans filed herewith. no change in use, egress or occupancy. Filing M01469088-S1.

    033
  34. Alteration approved

    Filing M01469088-S2 reached an approved status.

    034
  35. Alteration approved

    Filing M01469088-S3 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for M01469088-S3 is “Approved.”

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01445684-S2. That is not by itself confirmation of activity on site.

    037
  38. Alteration now approved

    The latest status recorded for M01445684-S2 is “Permit Entire.”

    038
  39. Alteration approved

    Filing M01469088-S1 reached an approved status.

    039
  40. Permit recorded for alteration

    DOB lists a first permit date for M01445684-S3. That is not by itself confirmation of activity on site.

    040
  41. Alteration now approved

    The latest status recorded for M01445684-S3 is “Permit Entire.”

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01469088-S1. That is not by itself confirmation of activity on site.

    042
  43. Alteration now approved

    The latest status recorded for M01469088-S1 is “Permit Entire.”

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for M01469088-I1. That is not by itself confirmation of activity on site.

    044
  45. Alteration now approved

    The latest status recorded for M01469088-I1 is “Permit Entire.”

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M01469088-S2. That is not by itself confirmation of activity on site.

    046
  47. Alteration now approved

    The latest status recorded for M01469088-S2 is “Permit Entire.”

    047
  48. Alteration filed

    Removal and construction of interior partitions, ceilings and doors. Filing M01458244-I1.

    048
  49. Alteration filed

    New: 1 hwhnongas, 1 sink,1 dishwasher, 1 water filter, 1 funnel drain, 1 sanitary piping & 1 water piping. Filing M01458244-S2.

    049
  50. Alteration filed

    Modify ductwork. Filing M01458244-S1.

    050
  51. Alteration approved

    Filing M01458244-I1 reached an approved status.

    051
  52. Alteration filed

    Remove 22 sprinkler heads. install - new 1 temp sprinkler loop head and piping. install - new 23 permanent sprinkler heads and piping. Filing M01458244-S3.

    052
  53. Alteration now under review

    The latest status recorded for M01458244-S3 is “Prof Cert QA Review.”

    053
  54. Alteration signed off

    DOB recorded a sign-off for M01092433-S3.

    054
  55. Alteration now completed

    The latest status recorded for M01092433-S3 is “LOC Issued.”

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for M01458244-I1. That is not by itself confirmation of activity on site.

    056
  57. Alteration now approved

    The latest status recorded for M01458244-I1 is “Permit Entire.”

    057
  58. Alteration approved

    Filing M01458244-S2 reached an approved status.

    058
  59. Alteration approved

    Filing M01458244-S1 reached an approved status.

    059
  60. Permit recorded for alteration

    DOB lists a first permit date for M01469088-S4. That is not by itself confirmation of activity on site.

    060
  61. Alteration now approved

    The latest status recorded for M01469088-S4 is “Permit Entire.”

    061
  62. Permit recorded for alteration

    DOB lists a first permit date for M01458244-S1. That is not by itself confirmation of activity on site.

    062
  63. Alteration now approved

    The latest status recorded for M01458244-S1 is “Permit Entire.”

    063
  64. Alteration now approved

    The latest status recorded for M01285552-I1 is “Permit Entire.”

    064
  65. Alteration now approved

    The latest status recorded for M01285552-S1 is “Permit Entire.”

    065
  66. Alteration now approved

    The latest status recorded for M01458244-S2 is “Approved.”

    066