DOB filing M01284654-P1
Alteration filing at 885 Third Avenue
Building record · BIN 1038549
885 Third Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1038549
885 Third Avenue
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Oct 19, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 34-story condominium built in 1986, on a 26,108 sq ft lot.
The apartments
358 condominium apartments are assessed on this block, and the typical one is 878 sq ft (82 m²). They run from 35 to 212 m².
The city values the typical one at $347,704. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
20 apartments on this tax block changed hands in the year the city last published, at a median of $1,129,800, from 225,000 to 4,550,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
231-235 EAST 53RD STREET LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 193 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1038549. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 11 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 885 Third Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modifications to the existing sprinkler system as per plans (MAMO). No change to use, egress, or occupancy. Filing M01284654-I1.
Filing M01284654-I1 reached an approved status.
Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy. Filing M01284648-I1.
Filing M01284648-I1 reached an approved status.
DOB lists a first permit date for M01284648-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01284654-I1. That is not by itself confirmation of activity on site.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola. Filing M01299220-I1.
Filing M01299220-I1 reached an approved status.
DOB lists a first permit date for M01299220-I1. That is not by itself confirmation of activity on site.
Msk lipstick infra: modifications to HVAC ductwork, piping and equipment to accommodate the infrastructure project in the existing building. no change to use, egress or occupancy. Filing M01307606-S1.
Msk lipstick infra: modifications interior partitions and finishes to accommodate the infrastructure project in the existing building. no change to use, egress or occupancy. Filing M01307606-S2.
Filing M01307606-S1 reached an approved status.
Filing M01307606-S2 reached an approved status.
Modifications to the existing sprinkler system on the 32nd Floor (Dr. Wiser Office), as per plans. No change to use, egress, or occupancy. Filing M01426928-I1.
Installation, removal, and modifications to plumbing fixtures and piping on the 32nd Floor (Dr Wiser Office), as per plans. No change to use, egress, or occupancy. Filing M01426927-I1.
Sprinkler head changes as indicated on plans. Filing M01423753-S2.
Filing M01423753-S2 reached an approved status.
DOB lists a first permit date for M01423753-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01423753-S2 is “Permit Entire.”
Msk lipstick infra: modifications interior partitions and finishes to accommodate the infrastructure project in the existing building. no change to use, egress or occupancy. Filing M01307606-P1.
Msk lipstick: installation of a ups, lithium-ion battery energy storage system as per plans filed hwerewith. Filing M01442971-I1.
Filing M01307606-P1 reached an approved status.
The latest status recorded for M01307606-P1 is “Approved.”
The latest status recorded for M01307606-S2 is “Approved.”
Filing M01426927-I1 reached an approved status.
The latest status recorded for M01442971-I1 is “Objections.”
Filing M01426928-I1 reached an approved status.
DOB lists a first permit date for M01426928-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01426928-I1 is “Permit Entire.”
DOB lists a first permit date for M01426927-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01426927-I1 is “Permit Entire.”
DOB lists a first permit date for M01307606-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01307606-S1 is “Permit Entire.”
The latest status recorded for M01299220-I1 is “Permit Entire.”
Modifications to the existing sprinkler system as per plans (MAMO). No change to use, egress, or occupancy. Filing M01284654-P1.
The latest status recorded for M01284648-I1 is “Permit Entire.”
Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy. Filing M01284648-P2.
Filing M01284648-P2 reached an approved status.
The latest status recorded for M01284648-P2 is “Approved.”
Filing M01284654-P1 reached an approved status.
The latest status recorded for M01284654-P1 is “Approved.”
The latest status recorded for M01284654-I1 is “Permit Entire.”