Building record · BIN 1041523

927 5 Avenue

927 5 Avenue, Manhattan, NY 10021

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1041523

927 5 Avenue

Upper East Side-Carnegie Hill, Manhattan

A consolidated public-record view · updated Sep 30, 2026

DOB filings
12
Active-status
12
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records12
First included filingJan 28, 2025
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 12-story elevator apartment building built in 1917, with 12 homes, on a 7,530 sq ft lot.

  1. Floors 2–12Homes12 homes are recorded on this lot — about one home to a floor, and the apartments assessed on this block run to a typical 1,285 sq ft (119 m²). The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes12 recorded · typically 119 m² · valued $434,831
  • Above the southern skylineFrom about floor 24 — the tallest thing within 60 m to the south is 69.5 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 57.4 m over 12 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1917
Last altered
1984
Floors
12
Residential units
12
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
7,530 sq ft
Building area
90,881 sq ft
Historic district
Upper East Side Historic District

The apartments

216 condominium apartments are assessed on this block, and the typical one is 1,285 sq ft (119 m²). They run from 10 to 281 m².

The city values the typical one at $434,831. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

14 apartments on this tax block changed hands in the year the city last published, at a median of $4,000,000, from 1,100,000 to 6,400,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

11 EAST 73RD ST CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 28 notices on file; the most recent was issued Jun 30, 2023.

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1041523. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 12 alteration filing. Its latest status categories are 12 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 28, 2025
Latest recorded change
Sep 30, 2026
Highest proposed story count
12 stories
Highest proposed unit count
13 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 927 5 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replacement in kind of two double hung windows in the living room. replacement of two existing bay windows with new double hung windows in the kitchen to match building standard. no change in use, egress or occupancy proposed under this application. Filing M01169508-I1.

    01
  2. Alteration approved

    Filing M01169508-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01169508-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Plumbing modification file in conjunction with apartment renovation on the 9th Floor. Filing M01235418-S1.

    04
  5. Alteration approved

    Filing M01235418-S1 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01235418-S1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    This ALT GC application is being filed for an interior and exterior renovation. Work scope to include non-structural partitions, doors, mechanical units, finishes and ceilings. No change to egress or occupancy. Filing M01308360-I1.

    07
  8. Alteration approved

    Filing M01308360-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01308360-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Plumbing work associated with interior 12th floor apartment renovations & accessory spaces on penthouse level as per plans filed herewith. no change in use, egress or occupancy. Filing M01234911-I1.

    010
  11. Alteration filed

    General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in use, egress or occupancy. Filing M01234604-I1.

    011
  12. Alteration approved

    Filing M01234911-I1 reached an approved status.

    012
  13. Alteration approved

    Filing M01234604-I1 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01234604-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01234911-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    This ALT GC application is being filed for an interior and exterior renovation. Work scope to include non-structural partitions, doors, mechanical units, finishes and ceilings. No change to egress or occupancy. Filing M01308360-P3.

    016
  17. Alteration filed

    General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in use, egress or occupancy. Filing M01234604-P1.

    017
  18. Alteration filed

    Plumbing work associated with interior 12th floor apartment renovations & accessory spaces on penthouse level as per plans filed herewith. no change in use, egress or occupancy. Filing M01234911-P1.

    018
  19. Alteration filed

    Interior renovation of existing bathrooms at apartment #10. remove and replace existing floor, wall and ceiling finishes, waterproofing, bathroom accessories, millwork/built-in items asper plan. no change to use egress or occupancy. pl/st filed separate. Filing M01443453-I1.

    019
  20. Alteration filed

    Plumbing work for bathroom renovations at apartment 10 on 10th floor. no change to use egress or occupancy. architectural and structural filed separately. Filing M01443453-S1.

    020
  21. Alteration approved

    Filing M01443453-S1 reached an approved status.

    021
  22. Alteration filed

    Repair 10th floor slab as per plan. no change to use, egress or occupancy. architectural and plumbing filed separate. Filing M01443453-S2.

    022
  23. Alteration approved

    Filing M01443453-I1 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for M01235418-S1 is “Permit Entire.”

    024
  25. Alteration approved

    Filing M01443453-S2 reached an approved status.

    025
  26. Alteration filed

    Structural work filed in conjunction with apartment renovation of the 9th Floor. Filing M01401919-S1.

    026
  27. Alteration approved

    Filing M01401919-S1 reached an approved status.

    027
  28. Alteration approved

    Filing M01308360-P3 reached an approved status.

    028
  29. Alteration now approved

    The latest status recorded for M01308360-P3 is “Approved.”

    029
  30. Alteration approved

    Filing M01234604-P1 reached an approved status.

    030
  31. Alteration now approved

    The latest status recorded for M01234604-P1 is “Approved.”

    031
  32. Alteration now approved

    The latest status recorded for M01308360-I1 is “Permit Entire.”

    032
  33. Alteration now approved

    The latest status recorded for M01234604-I1 is “Permit Entire.”

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01443453-S2. That is not by itself confirmation of activity on site.

    034
  35. Alteration now approved

    The latest status recorded for M01443453-S2 is “Permit Entire.”

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01443453-I1. That is not by itself confirmation of activity on site.

    036
  37. Alteration now approved

    The latest status recorded for M01443453-I1 is “Permit Entire.”

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M01443453-S1. That is not by itself confirmation of activity on site.

    038
  39. Alteration now approved

    The latest status recorded for M01443453-S1 is “Permit Entire.”

    039
  40. Alteration now approved

    The latest status recorded for M01169508-I1 is “Permit Entire.”

    040
  41. Alteration approved

    Filing M01234911-P1 reached an approved status.

    041
  42. Alteration now approved

    The latest status recorded for M01234911-P1 is “Approved.”

    042
  43. Permit recorded for alteration

    DOB lists a first permit date for M01401919-S1. That is not by itself confirmation of activity on site.

    043
  44. Alteration now approved

    The latest status recorded for M01401919-S1 is “Permit Entire.”

    044
  45. Alteration now approved

    The latest status recorded for M01234911-I1 is “Permit Entire.”

    045