Building record · BIN 1041695

35 East 75 Street

35 East 75 Street, Manhattan, NY 10021

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
35 East 75 Street building dossier graphic showing matched DOB filings and current record counts
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records5
First included filingOct 28, 2025
Latest recorded changeAug 26, 2026

The lot

What is already here?

The lot holds a 17-story elevator apartment building built in 1958, with 76 homes, on a 16,021 sq ft lot.

Built
1958
Last altered
2007
Floors
17
Residential units
76
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C5-1
Lot area
16,021 sq ft
Building area
222,973 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not any single filing.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1041695. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 5 alteration filing. Its latest status categories are 2 under review, 3 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 28, 2025
Latest recorded change
Aug 26, 2026
Highest proposed story count
15 stories
Highest proposed unit count
76 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 35 East 75 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Plumbing work associated with the renovation in unit 6a/b, including the removal/replacement and relocation of existing fixtures, and the addition of new fixtures and finishes. no change in use, egress, or occupancy. Filing M01283360-I1.

    01
  2. Alteration approved

    Filing M01283360-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01283360-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Application filed for mechanical additions/modifications on the 17th fl & roof (suite phe) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01331813-S1.

    04
  5. Alteration filed

    Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl (apt combination of suite 11 d & e). supersede application # 103114933 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01436987-I1.

    05
  6. Alteration filed

    Plumbing work associated with the renovation in unit 6a/b, including the removal/replacement and relocation of existing fixtures, and the addition of new fixtures and finishes. no change in use, egress, or occupancy. Filing M01283360-P1.

    06
  7. Alteration approved

    Filing M01331813-S1 reached an approved status.

    07
  8. Alteration filed

    Subsequent application filed for exterior/interior renovation of new exterior windows on the 17th fl (suite phe) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01331813-S4.

    08
  9. Alteration approved

    Filing M01283360-P1 reached an approved status.

    09
  10. Alteration now approved

    The latest status recorded for M01283360-P1 is “Approved.”

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01331813-S1. That is not by itself confirmation of activity on site.

    011
  12. Alteration now approved

    The latest status recorded for M01331813-S1 is “Permit Entire.”

    012
  13. Alteration now approved

    The latest status recorded for M01283360-I1 is “Permit Entire.”

    013
  14. Alteration now under review

    The latest status recorded for M01436987-I1 is “Plan Examiner Review.”

    014
  15. Alteration now under review

    The latest status recorded for M01331813-S4 is “Plan Examiner Review.”

    015