DOB filing M01169205-P5
Alteration filing at 30 East 76 Street
Building record · BIN 1041721
30 East 76 Street, Manhattan, NY 10021
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1041721
30 East 76 Street
Upper East Side-Carnegie Hill, Manhattan
A consolidated public-record view · updated Aug 31, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 15-story condominium built in 1929, with 15 homes, on a 3,076 sq ft lot.
The apartments
138 condominium apartments are assessed on this block, and the typical one is 1,308 sq ft (122 m²). They run from 50 to 721 m².
The city values the typical one at $549,588. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
21 apartments on this tax block changed hands in the year the city last published, at a median of $4,795,000, from 100,000 to 28,000,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
THE COMMONWEALTH FUND
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 34 notices on file; the most recent was issued Feb 22, 2023.
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Issued Oct 2, 2020
Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1041721. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 alteration filing. Its latest status categories are 4 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 30 East 76 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replace pl fxtr w/ new @ existing roughing (1sink,1dw,1wc)@ 15th &(1shower,1lav,2wc,1tub)@ 14th. relocate pl fxtr w/ new (1 lav)@ 15th & (2lav,1shower)@ 14th. cap &remove fxtr (1 sink,1 shower,1 w/m)@ 15th. install new pl fxtr (1 w/m,1shower,1 wc,1 lav)14. Filing M01169205-S1.
General construction to renovate existing duplex apt (phc) on the 14th & 15th fl. work will include demo of non-load bearing partitions, new partitions & finishes, new mechanical & plumbing fixtures. no change in use, egress, or occupancy under filing. Filing M01169205-I1.
Filing M01169205-S1 reached an approved status.
DOB lists a first permit date for M01169205-S1. That is not by itself confirmation of activity on site.
Filing M01169205-I1 reached an approved status.
DOB lists a first permit date for M01169205-I1. That is not by itself confirmation of activity on site.
Replace pl fxtr w/ new @ existing roughing (1sink,1dw,1wc)@ 15th &(1shower,1lav,2wc,1tub)@ 14th. relocate pl fxtr w/ new (1 lav)@ 15th & (2lav,1shower)@ 14th. cap &remove fxtr (1 sink,1 shower,1 w/m)@ 15th. install new pl fxtr (1 w/m,1shower,1 wc,1 lav)14. Filing M01169205-P5.
General construction to renovate existing duplex apt (phc) on the 14th & 15th fl. work will include demo of non-load bearing partitions, new partitions & finishes, new mechanical & plumbing fixtures. no change in use, egress, or occupancy under filing. Filing M01169205-P4.
Filing M01169205-P5 reached an approved status.
The latest status recorded for M01169205-P5 is “Approved.”
Filing M01169205-P4 reached an approved status.
The latest status recorded for M01169205-P4 is “Approved.”
The latest status recorded for M01169205-S1 is “Permit Entire.”
The latest status recorded for M01169205-I1 is “Permit Entire.”