DOB filing M01426831-I1
Alteration filing at 253 East 61 Street
Building record · BIN 1043819
253 East 61 Street, Manhattan, NY 10065
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1043819
253 East 61 Street
Upper East Side-Lenox Hill-Roosevelt Island, Manhattan
A consolidated public-record view · updated Oct 1, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 4-story one-family home built in 1899, on a 1,386 sq ft lot.
The apartments
226 condominium apartments are assessed on this block, and the typical one is 1,695 sq ft (157 m²). They run from 104 to 296 m².
The city values the typical one at $614,093. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
11 apartments on this tax block changed hands in the year the city last published, at a median of $2,962,500, from 2,750,000 to 22,000,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
209 EAST 61 LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1043819. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 253 East 61 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application filed to perform work limited to the front facade only, including installation of new windows at the basement level. No change to use, occupancy, or egress is proposed. Filing M01392804-I1.
Proposed construction of slab on grade replacement foundation wall bench and replacement of steel post in conjunction with M01392804. Filing M01426831-I1.
Filing M01392804-I1 reached an approved status.
Filing M01426831-I1 reached an approved status.
Proposed fence at 253 E 61 Street. Filing M01392804-S3.
Filing M01392804-S3 reached an approved status.
DOB lists a first permit date for M01392804-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01392804-S3 is “Permit Entire.”
DOB lists a first permit date for M01392804-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01392804-I1 is “Permit Entire.”
DOB lists a first permit date for M01426831-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01426831-I1 is “Permit Entire.”