DOB filing M01331450-P2
Full demolition at 1495 3 Avenue
Building record · BIN 1048725
1495 3 Avenue, Manhattan, NY 10028
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1048725
1495 3 Avenue
Upper East Side-Yorkville, Manhattan
A consolidated public-record view · updated Sep 11, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story store building built in 1915, on a 2,575 sq ft lot.
Owner of record
PIPE, GLASS AND OIL, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 11 open notices on record for this building, out of 23 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1048725. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 4 full demolition. Its latest status categories are 2 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1495 3 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01331450-S3.
DOB lists a first permit date for M01331450-S3. That is not by itself confirmation of activity on site.
Debris chute will be built to lower debris. Filing M01331450-S1.
Filing M01331450-S1 reached an approved status.
Full demolition of five story structure, using hand held and mechanical means will assist to load out debris only. Filing M01331450-P2.
Debris chute will be built to lower debris. Filing M01331450-P3.
Filing M01331450-P3 reached an approved status.
The latest status recorded for M01331450-S1 is “Approved.”
The latest status recorded for M01331450-P3 is “OnHold-NoGoodCheck.”
The latest status recorded for M01331450-P2 is “Plan Examiner Review.”
The latest status recorded for M01331450-S3 is “Permit Entire.”