DOB filing M01320014-I1
Alteration filing at 525 East 80 Street
Building record · BIN 1051044
525 East 80 Street, Manhattan, NY 10075
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 2 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1051044
525 East 80 Street
Upper East Side-Yorkville, Manhattan
A consolidated public-record view · updated Sep 14, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 13-story condominium built in 1981, with 68 homes, on a 15,325 sq ft lot.
What it sold for
16 apartments on this tax block changed hands in the year the city last published, at a median of $585,000, from 475,000 to 3,850,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
4 homes at this address are currently listed for sale by Coldwell Banker and Douglas Elliman. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 11For sale | Price not read | Coldwell Banker | |||
| Unit 7BCFor sale | Price not read | Douglas Elliman | |||
| Unit 7DFor sale | Price not read | Coldwell Banker | |||
| Unit 7EFor sale | Price not read | Coldwell Banker |
Read from the brokerages’ own published listings on September 21, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 38 notices on file; the most recent was issued Jun 30, 2023.
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1051044. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 2 alteration filing. Its latest status categories are 2 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 525 East 80 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 2 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Replacement of Cooling Tower, pumps, and make-up air unit. No change in occupancy, use, or egress. Filing M01320014-I1.
Filing M01320014-I1 reached an approved status.
DOB lists a first permit date for M01320014-I1. That is not by itself confirmation of activity on site.
Pl work in 5c filed in conjunction with DOB now gc. no change to use, occupancy or egress. Filing M01402696-S1.
Filing M01402696-S1 reached an approved status.
DOB lists a first permit date for M01402696-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01402696-S1 is “Permit Entire.”
The latest status recorded for M01320014-I1 is “Permit Entire.”