Building record · BIN 1058455

188 St Nicholas Avenue

188 St Nicholas Avenue, Manhattan, NY 10026

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 1 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1058455

188 St Nicholas Avenue

Harlem (South), Manhattan

A consolidated public-record view · updated Sep 23, 2026

DOB filings
3
Active-status
1
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records1
First included filingSep 9, 2022
Latest recorded changeSep 23, 2026

The lot

What is already here?

The lot holds a 7-story elevator apartment building built in 1920, with 42 homes, on a 11,523 sq ft lot.

  1. Floors 2–7Homes42 homes are recorded on this lot — about 7 homes to a floor. The city does not publish which floor any of them is on.
  2. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes42 recorded on the lot
  • Above the southern skylineFrom about floor 10 — the tallest thing within 60 m to the south is 28.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 27.3 m over 7 floors, as the city counts them. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1920
Last altered
1985
Floors
7
Residential units
42
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
11,523 sq ft
Building area
64,058 sq ft

Housing violations

160 violations are open against this address under the Housing Maintenance Code. 40 of them are the class the city calls immediately hazardous.

  • 40Immediately hazardous
  • 85Hazardous
  • 35Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

TRIANGLE EQUITIES, .

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 29 notices on file; the most recent was issued May 15, 2026.

  • Construction

    Issued May 15, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED I OBS ERVED AT EXPOSURE 1 WEST ELEVATION BETWEEN 6TH&7TH FLOOR,STEP CRACK IN BRICKS.EXPOSURE 2 SETBACK IN NORTH ELEVATION,CRACKS AND SPALLING BRICK S IN MULTIPLE LOCATIONS.EXPOSURE 3 EAST ELEVATION,SPALLING BRICKS IN M ULTIPLE LOCATIONS.EXP4 SOUTH ELEV,SPALLING BRICKS.REPAIR OR REPLACE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1058455. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 2 recorded as completed, 1 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 9, 2022
Latest recorded change
Sep 23, 2026
Highest proposed story count
Not stated
Highest proposed unit count
42 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 188 St Nicholas Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replace boiler and gas/oil burner as per plans. change grade of fuel from #4 to #2. no change in use, egress or occupancy. Filing M00786021-I1.

    01
  2. Alteration filed

    Connect to existing gas piping for replacement boiler and gas/oil burner. no change in use, egress or occupancy. Filing M00786036-I1.

    02
  3. Alteration approved

    Filing M00786021-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M00786036-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M00786021-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00786036-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Connect to existing gas piping for replacement boiler and gas/oil burner. no change in use, egress or occupancy. Filing M00786036-P2.

    07
  8. Alteration approved

    Filing M00786036-P2 reached an approved status.

    08
  9. Alteration now approved

    The latest status recorded for M00786036-P2 is “Approved.”

    09
  10. Alteration signed off

    DOB recorded a sign-off for M00786036-I1.

    010
  11. Alteration now completed

    The latest status recorded for M00786036-I1 is “LOC Issued.”

    011
  12. Alteration signed off

    DOB recorded a sign-off for M00786021-I1.

    012
  13. Alteration now completed

    The latest status recorded for M00786021-I1 is “LOC Issued.”

    013