DOB filing M00882436-P7
Alteration filing at 2449 Adam Clayton Powell Jr Boulevard
Building record · BIN 1060127
2449 Adam Clayton Powell Jr Boulevard, Manhattan, NY 10030
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 6-story walk-up apartment building built in 1920, with 26 homes, on a 5,000 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 5, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 19 notices on file; the most recent was issued Sep 30, 2020.
Issued Sep 30, 2020 — CYCLE 8C UNSAFE REPORT FILED (NYCHA)
Issued Sep 30, 2020 — CYCLE 9C UNSAFE REPORT FILED (NYCHA)
Issued Jul 24, 2013 — CYCLE 7 UNSAFE REPORT FILED
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 5, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1060127. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2449 Adam Clayton Powell Jr Boulevard.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous HVAC work; no changes to use, egress, or occupancy. Filing M00882436-S3.
Filing M00882436-S3 reached an approved status.
DOB lists a first permit date for M00882436-S3. That is not by itself confirmation of activity on site.
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous HVAC work; no changes to use, egress, or occupancy. Filing M00882436-P7.
Boiler replacement filed in conjunction with renovation of 6-story nycha multiple dwelling throughout. no change to use, egress or occupancy. Filing M00882436-P5.
The latest status recorded for M00882436-P5 is “Pending Plan Examiner Assignment.”
Filing M00882436-P7 reached an approved status.
The latest status recorded for M00882436-P7 is “Approved.”
The latest status recorded for M00882436-S3 is “Permit Entire.”