Building record · BIN 1071438

461 5 Avenue

461 5 Avenue, Manhattan, NY 10017

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1071438

461 5 Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Nov 13, 2026

DOB filings
22
Active-status
18
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings22
Open or active-status records18
First included filingMay 27, 2025
Latest recorded changeNov 13, 2026

The lot

What is already here?

The lot holds a 26-story office building built in 1988, on a 11,341 sq ft lot.

  1. Floors 2–26Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 63 — the tallest thing within 60 m to the south is 188.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 102 m over 26 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1988
Floors
26
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-3
Lot area
11,341 sq ft
Building area
201,387 sq ft

Owner of record

461 FIFTH OWNER LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 81 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1071438. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 22 alteration filing. Its latest status categories are 18 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 27, 2025
Latest recorded change
Nov 13, 2026
Highest proposed story count
26 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 461 5 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01213511-S1.

    01
  2. Alteration approved

    Filing M01213511-S1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01213511-S1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Suspended Scaffold for Facade Restoration as Shown on Plans. Filing M01309204-I1.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01309204-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans. Filing M01320698-I1.

    06
  7. Alteration approved

    Filing M01320698-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01320698-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Mechanical changes as indicated on plans. Filing M01320778-I1.

    09
  10. Alteration approved

    Filing M01320778-I1 reached an approved status.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01320778-I1. That is not by itself confirmation of activity on site.

    011
  12. Alteration filed

    Installation of siewalk shed as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c. Filing M01309219-I1.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01309219-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01381525-S1.

    014
  15. Alteration approved

    Filing M01381525-S1 reached an approved status.

    015
  16. Permit recorded for alteration

    DOB lists a first permit date for M01381525-S1. That is not by itself confirmation of activity on site.

    016
  17. Alteration filed

    Installation of siewalk shed as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c. Filing M01432723-I1.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01432723-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01436892-S1.

    019
  20. Alteration filed

    Mechanical changes as indicated on plans. Filing M01436892-I1.

    020
  21. Alteration approved

    Filing M01436892-S1 reached an approved status.

    021
  22. Alteration filed

    Suspended Scaffold for Facade Restoration as Shown on Plans. Filing M01309204-P2.

    022
  23. Alteration approved

    Filing M01309204-P2 reached an approved status.

    023
  24. Alteration now approved

    The latest status recorded for M01309204-P2 is “Approved.”

    024
  25. Alteration filed

    Installation of siewalk shed as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c. Filing M01432723-P1.

    025
  26. Alteration approved

    Filing M01432723-P1 reached an approved status.

    026
  27. Alteration now approved

    The latest status recorded for M01432723-P1 is “Approved.”

    027
  28. Alteration filed

    Suspended Scaffold for Facade Restoration as Shown on Plans. Filing M01309204-P3.

    028
  29. Alteration filed

    Sprinkler head changes as indicated on plans. Filing M01436892-S2.

    029
  30. Alteration approved

    Filing M01436892-S2 reached an approved status.

    030
  31. Alteration approved

    Filing M01309204-P3 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for M01309204-P3 is “Approved.”

    032
  33. Alteration approved

    Filing M01436892-I1 reached an approved status.

    033
  34. Alteration now approved

    The latest status recorded for M01436892-I1 is “Approved.”

    034
  35. Alteration signed off

    DOB recorded a sign-off for M01309219-I1.

    035
  36. Alteration now completed

    The latest status recorded for M01309219-I1 is “LOC Issued.”

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01436892-S1. That is not by itself confirmation of activity on site.

    037
  38. Alteration now approved

    The latest status recorded for M01436892-S1 is “Permit Entire.”

    038
  39. Alteration signed off

    DOB recorded a sign-off for M01320698-I1.

    039
  40. Alteration now completed

    The latest status recorded for M01320698-I1 is “LOC Issued.”

    040
  41. Alteration signed off

    DOB recorded a sign-off for M01320778-I1.

    041
  42. Alteration now completed

    The latest status recorded for M01320778-I1 is “LOC Issued.”

    042
  43. Alteration filed

    Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. Filing M01459392-I1.

    043
  44. Alteration signed off

    DOB recorded a sign-off for M01213511-S1.

    044
  45. Alteration now completed

    The latest status recorded for M01213511-S1 is “LOC Issued.”

    045
  46. Alteration approved

    Filing M01459392-I1 reached an approved status.

    046
  47. Permit recorded for alteration

    DOB lists a first permit date for M01436892-S2. That is not by itself confirmation of activity on site.

    047
  48. Alteration now approved

    The latest status recorded for M01436892-S2 is “Permit Entire.”

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01459392-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration now approved

    The latest status recorded for M01459392-I1 is “Permit Entire.”

    050
  51. Alteration now approved

    The latest status recorded for M01432723-I1 is “Permit Entire.”

    051
  52. Alteration filed

    Mechanical changes as indicated on plans. Filing M01459420-I1.

    052
  53. Alteration filed

    Sprinkler head changes as indicated on plans. Filing M01459420-S2.

    053
  54. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01459420-S1.

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01459420-S2. That is not by itself confirmation of activity on site.

    055
  56. Alteration now approved

    The latest status recorded for M01459420-S2 is “Permit Entire.”

    056
  57. Permit recorded for alteration

    DOB lists a first permit date for M01459420-S1. That is not by itself confirmation of activity on site.

    057
  58. Alteration now approved

    The latest status recorded for M01459420-S1 is “Permit Entire.”

    058
  59. Alteration approved

    Filing M01459420-I1 reached an approved status.

    059
  60. Alteration now approved

    The latest status recorded for M01459420-I1 is “Approved.”

    060
  61. Alteration filed

    Sprinkler head changes as indicated on plans. Filing M01478457-S2.

    061
  62. Alteration filed

    Mechanical changes as indicated on plans. Filing M01478457-I1.

    062
  63. Alteration approved

    Filing M01478457-I1 reached an approved status.

    063
  64. Alteration filed

    Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans. Filing M01478073-I1.

    064
  65. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01381525-P4.

    065
  66. Alteration approved

    Filing M01478457-S2 reached an approved status.

    066
  67. Alteration approved

    Filing M01478073-I1 reached an approved status.

    067
  68. Alteration now approved

    The latest status recorded for M01309204-I1 is “Permit Entire.”

    068
  69. Alteration now approved

    The latest status recorded for M01478073-I1 is “Approved.”

    069
  70. Alteration approved

    Filing M01381525-P4 reached an approved status.

    070
  71. Alteration now approved

    The latest status recorded for M01381525-P4 is “Approved.”

    071
  72. Alteration now approved

    The latest status recorded for M01478457-I1 is “Approved.”

    072
  73. Alteration now approved

    The latest status recorded for M01381525-S1 is “Permit Entire.”

    073
  74. Alteration filed

    Plumbing Fixture changes as indicated on plans. Filing M01478457-S1.

    074
  75. Permit recorded for alteration

    DOB lists a first permit date for M01478457-S2. That is not by itself confirmation of activity on site.

    075
  76. Alteration now approved

    The latest status recorded for M01478457-S2 is “Permit Entire.”

    076
  77. Alteration approved

    Filing M01478457-S1 reached an approved status.

    077
  78. Permit recorded for alteration

    DOB lists a first permit date for M01478457-S1. That is not by itself confirmation of activity on site.

    078
  79. Alteration now approved

    The latest status recorded for M01478457-S1 is “Permit Entire.”

    079