Building record · BIN 1076193

1585 Broadway

1585 Broadway, Manhattan, NY 10036

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 38 independently sourced records, including 28 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1076193

1585 Broadway

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 23, 2026

DOB filings
38
Active-status
28
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings38
Open or active-status records28
First included filingOct 13, 2021
Latest recorded changeOct 23, 2026

The lot

What is already here?

The lot holds a 42-story condominium built in 1987, on a 50,657 sq ft lot.

  1. Floors 2–42Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 54 — the tallest thing within 60 m to the south is 160.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 201.2 m over 42 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1987
Floors
42
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C6-7T
Lot area
50,657 sq ft
Building area
1,028,336 sq ft

Owner of record

THE SHUBERT ORGANIZATION INC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 194 notices on file; the most recent was issued Jan 13, 1997.

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1076193. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 38 alteration filing. Its latest status categories are 10 recorded as completed, 28 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 13, 2021
Latest recorded change
Oct 23, 2026
Highest proposed story count
42 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1585 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 38 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of dual 7000# capacity personnel/material hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator appl sub sep to elevator dept. Filing M00610444-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for M00610444-I1. That is not by itself confirmation of activity on site.

    02
  3. Alteration filed

    Installation of construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. fence installed on sidewalk / roadway. dot permits by others. Filing M00718354-I1.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for M00718354-I1. That is not by itself confirmation of activity on site.

    04
  5. Alteration filed

    Heavy duty urban sidewalk shed during bldg alteration, filed sep. urban shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00718368-I1.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00718368-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Interior demolition as per plans filed herewith. Filing M00797351-I1.

    07
  8. Alteration approved

    Filing M00797351-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M00797351-I1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Modification to Plumbing, Sprinkler and Standpipe systems as per plans filed herewith. Filing M08002616-I1.

    010
  11. Alteration approved

    Filing M08002616-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M08002616-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Structural modifications as per plans filed herewith. Filing M00801279-I1.

    013
  14. Alteration approved

    Filing M00801279-I1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M00801279-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Modifications to sprinkler and plumbing systems as per plans filed herewith. No change of use, occupancy or egress. Filing M00864385-I1.

    016
  17. Alteration approved

    Filing M00864385-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M00864385-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Temporary overhead protection at ramp area as per drawings. overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00896782-I1.

    019
  20. Alteration filed

    Temporary work platform as per drawings. work platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00896711-I1.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M00896782-I1. That is not by itself confirmation of activity on site.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M00896711-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration filed

    Temporary work platform as per drawings. work platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00935306-I1.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M00935306-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Construction fence enclosure as per drawings. fence enclosure shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00964298-I1.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M00964298-I1. That is not by itself confirmation of activity on site.

    026
  27. Alteration filed

    Temporary work platform as per drawings. work platform shall comply with ch #33 of the NYC bc. 50 psf storage, filed separately, permitted on work platform. no change in use, occupancy or egress under this application. Filing M00985158-I1.

    027
  28. Alteration filed

    Temporary storage on transfer platform as per plans. transfer platform filed under separate application. no change in use, occupancy or egress under this application. Filing M00986278-I1.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M00985158-I1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M00986278-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress. Filing M00955388-I1.

    031
  32. Alteration approved

    Filing M00955388-I1 reached an approved status.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M00955388-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration filed

    Modification to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. Filing M00956765-I1.

    034
  35. Alteration filed

    Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy. Filing M00956757-I1.

    035
  36. Alteration approved

    Filing M00956765-I1 reached an approved status.

    036
  37. Alteration approved

    Filing M00956757-I1 reached an approved status.

    037
  38. Permit recorded for alteration

    DOB lists a first permit date for M00956757-I1. That is not by itself confirmation of activity on site.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M00956765-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration filed

    Structural demolition and modification as per plans filed herewith. No change to use, egress or occupancy. Filing M01036795-I1.

    040
  41. Alteration filed

    Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy. Filing M00956751-I1.

    041
  42. Alteration approved

    Filing M01036795-I1 reached an approved status.

    042
  43. Alteration approved

    Filing M00956751-I1 reached an approved status.

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for M00956751-I1. That is not by itself confirmation of activity on site.

    044
  45. Alteration filed

    Modification to Mechanical systems as per plans filed herewith. Filing M01036800-I1.

    045
  46. Alteration filed

    Modification to Plumbing and Sprinkler systems as per plans filed herewith. Filing M01036808-I1.

    046
  47. Alteration approved

    Filing M01036808-I1 reached an approved status.

    047
  48. Alteration approved

    Filing M01036800-I1 reached an approved status.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01036795-I1. That is not by itself confirmation of activity on site.

    049
  50. Permit recorded for alteration

    DOB lists a first permit date for M01036800-I1. That is not by itself confirmation of activity on site.

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for M01036808-I1. That is not by itself confirmation of activity on site.

    051
  52. Alteration filed

    Structural modifications as per plans filed herewith. Filing M01038037-I1.

    052
  53. Alteration approved

    Filing M01038037-I1 reached an approved status.

    053
  54. Alteration filed

    Modification to mechanical systems as per plans filed herewith. Filing M01038048-I1.

    054
  55. Alteration approved

    Filing M01038048-I1 reached an approved status.

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for M01038048-I1. That is not by itself confirmation of activity on site.

    056
  57. Permit recorded for alteration

    DOB lists a first permit date for M01038037-I1. That is not by itself confirmation of activity on site.

    057
  58. Alteration filed

    Modifications to existing sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy. Filing M01091378-I1.

    058
  59. Alteration approved

    Filing M01091378-I1 reached an approved status.

    059
  60. Permit recorded for alteration

    DOB lists a first permit date for M01091378-I1. That is not by itself confirmation of activity on site.

    060
  61. Alteration filed

    Modifications to existing sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy. Filing M01133512-I1.

    061
  62. Alteration approved

    Filing M01133512-I1 reached an approved status.

    062
  63. Permit recorded for alteration

    DOB lists a first permit date for M01133512-I1. That is not by itself confirmation of activity on site.

    063
  64. Alteration filed

    Erect exterior wall structure for advertising signs filed under separate application. no change in use, egress or occupancy. Filing M01225150-I1.

    064
  65. Alteration approved

    Filing M01225150-I1 reached an approved status.

    065
  66. Alteration filed

    Interior renovation as per plans filed herewith. No change to use, egress or occupancy. Filing M01266113-I1.

    066
  67. Alteration approved

    Filing M01266113-I1 reached an approved status.

    067
  68. Alteration filed

    Modification to sprinkler systems as per plans filed herewith. Filing M01270582-I1.

    068
  69. Permit recorded for alteration

    DOB lists a first permit date for M01225150-I1. That is not by itself confirmation of activity on site.

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01266113-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration approved

    Filing M01270582-I1 reached an approved status.

    071
  72. Permit recorded for alteration

    DOB lists a first permit date for M01270582-I1. That is not by itself confirmation of activity on site.

    072
  73. Alteration filed

    Structural work according to plans filed herewith, including cold formed stud walls, steel posts and beams in walls, and ceiling support design. Concrete pad support for MEP units as per plans filed herewith. No change in use, egress or occupancy. Filing M01390749-I1.

    073
  74. Alteration filed

    Removal of existing HVAC,WSHP, & equipment and distribution and replacement with same as per plans filed herewith. No change in use, egress or occupancy. Filing M01390693-I1.

    074
  75. Alteration approved

    Filing M01390749-I1 reached an approved status.

    075
  76. Alteration approved

    Filing M01390693-I1 reached an approved status.

    076
  77. Alteration filed

    An interior alteration of a coffee shop which includes the installation of interior non-bearing partitions, ceilings, doors, and their related finishes as per plans filed herewith. no change of egress, use, or occupancy. no exterior work. Filing M01390459-I1.

    077
  78. Alteration approved

    Filing M01390459-I1 reached an approved status.

    078
  79. Permit recorded for alteration

    DOB lists a first permit date for M01390749-I1. That is not by itself confirmation of activity on site.

    079
  80. Permit recorded for alteration

    DOB lists a first permit date for M01390693-I1. That is not by itself confirmation of activity on site.

    080
  81. Permit recorded for alteration

    DOB lists a first permit date for M01390459-I1. That is not by itself confirmation of activity on site.

    081
  82. Alteration filed

    Modifications to existing HVAC System as per plans filed herewith. Replacement of ductwork and air outlets for rebuilt ceilings. No change to use, egress, or occupancy. Filing M01414936-I1.

    082
  83. Alteration approved

    Filing M01414936-I1 reached an approved status.

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01414936-I1. That is not by itself confirmation of activity on site.

    084
  85. Alteration filed

    Modification to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. Filing M00956765-P4.

    085
  86. Alteration approved

    Filing M00956765-P4 reached an approved status.

    086
  87. Alteration now approved

    The latest status recorded for M00956765-P4 is “Approved.”

    087
  88. Alteration filed

    Modifications to sprinkler and plumbing systems as per plans filed herewith. No change of use, occupancy or egress. Filing M00864385-P2.

    088
  89. Alteration approved

    Filing M00864385-P2 reached an approved status.

    089
  90. Alteration now approved

    The latest status recorded for M00864385-P2 is “Approved.”

    090
  91. Alteration filed

    Work shall include removal and replacement of the existing sewage, sump pumps and relocated control panel and associated discharge piping as per plans filed herewith. no change in use, egress,or occupancy. Filing M01407160-I1.

    091
  92. Alteration approved

    Filing M01407160-I1 reached an approved status.

    092
  93. Permit recorded for alteration

    DOB lists a first permit date for M01407160-I1. That is not by itself confirmation of activity on site.

    093
  94. Alteration now approved

    The latest status recorded for M01407160-I1 is “Permit Entire.”

    094
  95. Alteration now approved

    The latest status recorded for M00956751-I1 is “Permit Entire.”

    095
  96. Alteration signed off

    DOB recorded a sign-off for M00797351-I1.

    096
  97. Alteration now completed

    The latest status recorded for M00797351-I1 is “LOC Issued.”

    097
  98. Alteration now approved

    The latest status recorded for M00955388-I1 is “Permit Entire.”

    098
  99. Alteration filed

    Modification of existing HVAC System as per plans filed herewith. No change in use, egress or occupancy. Filing M01404729-I1.

    099
  100. Alteration filed

    Modification to mechanical systems as per plans filed herewith. Filing M01038048-P2.

    0100
  101. Alteration approved

    Filing M01404729-I1 reached an approved status.

    0101
  102. Permit recorded for alteration

    DOB lists a first permit date for M01404729-I1. That is not by itself confirmation of activity on site.

    0102
  103. Alteration now approved

    The latest status recorded for M01404729-I1 is “Permit Entire.”

    0103
  104. Alteration approved

    Filing M01038048-P2 reached an approved status.

    0104
  105. Alteration now approved

    The latest status recorded for M01038048-P2 is “Approved.”

    0105
  106. Alteration now approved

    The latest status recorded for M01038048-I1 is “Permit Entire.”

    0106
  107. Alteration signed off

    DOB recorded a sign-off for M01133512-I1.

    0107
  108. Alteration now completed

    The latest status recorded for M01133512-I1 is “LOC Issued.”

    0108
  109. Alteration signed off

    DOB recorded a sign-off for M01091378-I1.

    0109
  110. Alteration now completed

    The latest status recorded for M01091378-I1 is “LOC Issued.”

    0110
  111. Alteration signed off

    DOB recorded a sign-off for M01036800-I1.

    0111
  112. Alteration now completed

    The latest status recorded for M01036800-I1 is “LOC Issued.”

    0112
  113. Alteration signed off

    DOB recorded a sign-off for M01036808-I1.

    0113
  114. Alteration now completed

    The latest status recorded for M01036808-I1 is “LOC Issued.”

    0114
  115. Alteration now approved

    The latest status recorded for M00896711-I1 is “Permit Entire.”

    0115
  116. Alteration now approved

    The latest status recorded for M00935306-I1 is “Permit Entire.”

    0116
  117. Alteration now approved

    The latest status recorded for M00986278-I1 is “Permit Entire.”

    0117
  118. Alteration now approved

    The latest status recorded for M00964298-I1 is “Permit Entire.”

    0118
  119. Alteration now approved

    The latest status recorded for M00610444-I1 is “Permit Entire.”

    0119
  120. Alteration now approved

    The latest status recorded for M00956757-I1 is “Permit Entire.”

    0120
  121. Alteration now approved

    The latest status recorded for M00985158-I1 is “Permit Entire.”

    0121
  122. Alteration now approved

    The latest status recorded for M00896782-I1 is “Permit Entire.”

    0122
  123. Alteration now approved

    The latest status recorded for M00718354-I1 is “Permit Entire.”

    0123
  124. Alteration now approved

    The latest status recorded for M01225150-I1 is “Permit Entire.”

    0124
  125. Alteration filed

    Modification to existing plumbing and sprinkler system as per plans filed herewith. No change in use, egress, or occupancy. Filing M00956765-P5.

    0125
  126. Alteration now approved

    The latest status recorded for M01270582-I1 is “Permit Entire.”

    0126
  127. Alteration approved

    Filing M00956765-P5 reached an approved status.

    0127
  128. Alteration now approved

    The latest status recorded for M00956765-P5 is “Approved.”

    0128
  129. Alteration now approved

    The latest status recorded for M00956765-I1 is “Permit Entire.”

    0129
  130. Alteration now approved

    The latest status recorded for M01390749-I1 is “Permit Entire.”

    0130
  131. Alteration now approved

    The latest status recorded for M01390693-I1 is “Permit Entire.”

    0131
  132. Alteration now approved

    The latest status recorded for M01390459-I1 is “Permit Entire.”

    0132
  133. Alteration signed off

    DOB recorded a sign-off for M01414936-I1.

    0133
  134. Alteration now completed

    The latest status recorded for M01414936-I1 is “LOC Issued.”

    0134
  135. Alteration signed off

    DOB recorded a sign-off for M01038037-I1.

    0135
  136. Alteration now completed

    The latest status recorded for M01038037-I1 is “LOC Issued.”

    0136
  137. Alteration signed off

    DOB recorded a sign-off for M01036795-I1.

    0137
  138. Alteration now completed

    The latest status recorded for M01036795-I1 is “LOC Issued.”

    0138
  139. Alteration signed off

    DOB recorded a sign-off for M00801279-I1.

    0139
  140. Alteration now completed

    The latest status recorded for M00801279-I1 is “LOC Issued.”

    0140
  141. Alteration now approved

    The latest status recorded for M00718368-I1 is “Permit Entire.”

    0141
  142. Alteration filed

    Interior renovation as per plans filed herewith. No change to use, egress or occupancy. Filing M01266113-P1.

    0142
  143. Alteration approved

    Filing M01266113-P1 reached an approved status.

    0143
  144. Alteration now approved

    The latest status recorded for M01266113-P1 is “Approved.”

    0144
  145. Alteration now approved

    The latest status recorded for M01266113-I1 is “Permit Entire.”

    0145
  146. Alteration now approved

    The latest status recorded for M00864385-I1 is “Permit Entire.”

    0146
  147. Alteration signed off

    DOB recorded a sign-off for M08002616-I1.

    0147
  148. Alteration now completed

    The latest status recorded for M08002616-I1 is “LOC Issued.”

    0148