DOB filing M01461506-I1
Alteration filing at 177 Ft Washington Avenue
Building record · BIN 1076746
177 Ft Washington Avenue, Manhattan, NY 10032
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 25 independently sourced records, including 21 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1076746
177 Ft Washington Avenue
Washington Heights (South), Manhattan
A consolidated public-record view · updated Nov 19, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story health facility built in 1989, on a 245,035 sq ft lot.
Housing violations
1 violation is open against this address under the Housing Maintenance Code.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
What it sold for
10 apartments on this tax block changed hands in the year the city last published, at a median of $515,000, from 290,000 to 799,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
ROYAL CHARTER PROPERTIES, INC.
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 320 notices on file; the most recent was issued Nov 22, 2004.
Issued Nov 22, 2004
Issued Jan 8, 2001 — 1P35485
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1076746. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 25 alteration filing. Its latest status categories are 19 approved, 2 under review, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 177 Ft Washington Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 25 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mhb/hh sp: modifications of ceilings and finishes to accommodatedsprinkler upgrades throught the existing hospital building as per plans. Filing M00705091-I1.
Filing M00705091-I1 reached an approved status.
DOB lists a first permit date for M00705091-I1. That is not by itself confirmation of activity on site.
Mhb chiller: modification of HVAC equipment and ductwork to acommodate replacement of the existing chillers as per plans. no change to use, egress or occupancy. Filing M00906088-I1.
Filing M00906088-I1 reached an approved status.
DOB lists a first permit date for M00906088-I1. That is not by itself confirmation of activity on site.
Mhb gn behavioral health: modification to HVAC ductwork, piping, and equipment to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy. Filing M01177036-I1.
Mhb gn behavioral health: plumbing and sprinkler modifications to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy. Filing M01177036-S1.
Mhb gn behavioral health: modification to interior partitions and finishes to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy. Filing M01177027-I1.
Filing M01177027-I1 reached an approved status.
Ir4 new mechanical ductwork, piping, terminal equipment, and other devices will be provided as shown on plans, all work to accommdoate the renovaiton of the 4th floor ir imaging equipment replacement in the exising milstein hospital building. Filing M01224286-I1.
Filing M01177036-I1 reached an approved status.
Filing M01177036-S1 reached an approved status.
Filing M01224286-I1 reached an approved status.
DOB lists a first permit date for M01177036-S1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01177027-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01177036-I1. That is not by itself confirmation of activity on site.
Hh 02 cath labs & hybrid or: plumbing and sprinkler modifications to accommodate the cath lab and hybrid ors renovation within the exisitng hospital building as per plans. Filing M01258964-S1.
Filing M01258964-S1 reached an approved status.
DOB lists a first permit date for M01224286-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01258964-S1. That is not by itself confirmation of activity on site.
Mhb gn behavioral health: plumbing and sprinkler modifications to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy. Filing M01177036-P2.
Mhb gn behavioral health: modification to interior partitions and finishes to accommodate the behavioral health renovation in the existing hospital building. no change to use, egress or occupancy. Filing M01177027-P2.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. Filing M01440962-I1.
Filing M01177036-P2 reached an approved status.
The latest status recorded for M01177036-P2 is “Approved.”
DOB recorded a sign-off for M00906088-I1.
The latest status recorded for M00906088-I1 is “LOC Issued.”
DOB lists a first permit date for M01440962-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01440962-I1 is “Permit Entire.”
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. Filing M01440962-S1.
DOB lists a first permit date for M01440962-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01177036-I1.
The latest status recorded for M01177036-I1 is “LOC Issued.”
Filing M01177027-P2 reached an approved status.
The latest status recorded for M01177027-P2 is “Approved.”
Hh 02 cath labs & hybrid or: plumbing and sprinkler modifications to accommodate the cath lab and hybrid ors renovation within the exisitng hospital building as per plans. Filing M01258964-P1.
DOB recorded a sign-off for M01177027-I1.
The latest status recorded for M01177027-I1 is “LOC Issued.”
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. Filing M01440962-P1.
MHB 6HS: Interior demolition on partial 6th floor in the existing hospital including removal of partitions and finishes as per plans filed herewith. No change to use, egress, or occupancy. Filing M01425241-I1.
Filing M01425241-I1 reached an approved status.
Filing M01440962-P1 reached an approved status.
The latest status recorded for M01440962-P1 is “Approved.”
The latest status recorded for M01440962-S1 is “Permit Entire.”
MHB 6HS: HVAC removals to accommodate renovation of the 6th floor hospital patient unit - 6 Hudson South, in the existing hospital building. Filing M01425241-S2.
MHB 6HS: remove plumbing fixtures and piping; new med gas piping to accommodate renovation of the 6th floor hospital patient unit - 6 Hudson South, in the existing hospital building. Filing M01425241-S1.
MHB 6HS: Sprinkler removals to accommodate renovation of the 6th floor hospital patient unit - 6 Hudson South, in the existing hospital building. Filing M01425241-S3.
DOB recorded a sign-off for M01177036-S1.
The latest status recorded for M01177036-S1 is “LOC Issued.”
Remove and install partitions and finishes on partial 9th floor in the existing hospital. No change to zoning, use, egress occupancy. Filing M01461500-S4.
Plumbing and sprinkler modifications in the existing hospital building as per plans filed herewith. Filing M01461500-S1.
Filing M01425241-S3 reached an approved status.
The latest status recorded for M01425241-S3 is “Approved.”
Provide ductwork and mechanical equipment to accommodate coffee shop renovations in the existing hospital as per plans filed herewith only. Filing M01461500-I1.
Filing M01461500-I1 reached an approved status.
The latest status recorded for M01461500-I1 is “Approved.”
Filing M01425241-S1 reached an approved status.
The latest status recorded for M01425241-S1 is “Approved.”
Filing M01425241-S2 reached an approved status.
Filing M01461500-S1 reached an approved status.
The latest status recorded for M01461500-S1 is “Approved.”
The latest status recorded for M00705091-I1 is “Permit Entire.”
MHB 9HS: Phase 1: HVAC removals on partial 9th Floor, in the existing hospital as per plans filed herewith. No change to use, egress, or occupancy. Filing M01461506-I1.
MHB 9HS: Phase 1: Plumbing removals on partial 9th Floor in the existing hospital as per plans filed herewith. No change to use, egress, or occupancy. Filing M01461506-S1.
MHB 9HS: Phase 1 Med Surg, Phase 2 McKeen: Interior demolition on partial 9th Floor in the existing hospital including removal of partitions and finishes as per plans filed herewith. No change to use, egress, or occupancy. Filing M01427559-I1.
MHB 9HS: Sprinkler removals on partial 9th Floor in the existing hospital as per plans filed herewith. No change to use, egress, or occupancy. Filing M01461506-S2.
Filing M01427559-I1 reached an approved status.
The latest status recorded for M01427559-I1 is “Approved.”
The latest status recorded for M01224286-I1 is “Permit Entire.”
Filing M01461506-S1 reached an approved status.
The latest status recorded for M01461506-S1 is “Approved.”
Filing M01461506-S2 reached an approved status.
The latest status recorded for M01461506-S2 is “Approved.”
The latest status recorded for M01461500-S4 is “Objections.”
MHB DWT: Sprinkler and standpipe modifications as indicated on plans filed herewith. no change to use, egress or occupancy. Filing M00943335-P3.
DOB lists a first permit date for M01425241-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01425241-S2 is “Permit Entire.”
DOB lists a first permit date for M01425241-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425241-I1 is “Permit Entire.”
Filing M01258964-P1 reached an approved status.
The latest status recorded for M01258964-P1 is “Approved.”
The latest status recorded for M01258964-S1 is “Permit Entire.”
Filing M01461506-I1 reached an approved status.
The latest status recorded for M01461506-I1 is “Approved.”
The latest status recorded for M00943335-P3 is “Plan Examiner Review.”