DOB filing M00692466-I1
Alteration filing at 3784 10 Avenue
Building record · BIN 1080033
3784 10 Avenue, Manhattan, NY 10034
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1080033
3784 10 Avenue
Inwood, Manhattan
A consolidated public-record view · updated Oct 13, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 14-story elevator apartment building built in 1951, with 1167 homes, on a 405,000 sq ft lot.
Housing violations
10 violations are open against this address under the Housing Maintenance Code.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
Owner of record
NYC HOUSING AUTHORITY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 1 open notice on record for this building, out of 16 notices on file; the most recent was issued Jan 13, 1997.
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1080033. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 9 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 3784 10 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
NYCHA BOILER -Dyckman. Building 7. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers. Filing M00636170-I1.
NYCHA Boilers Dyckman Building 7: Mechanical work associated with boiler replacement as per plans filed herewith. Filing M00692466-I1.
Filing M00692466-I1 reached an approved status.
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith. Filing M00636163-I1.
NYCHA Boilers: Dyckman. Building 7: General Construction in reference to boiler replacement as per plans filed herewith. Filing M00691915-I1.
Filing M00636170-I1 reached an approved status.
Filing M00691915-I1 reached an approved status.
Filing M00636163-I1 reached an approved status.
DOB lists a first permit date for M00636163-I1. That is not by itself confirmation of activity on site.
To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8' high fences, gates and new equipment. No change to Use, Egress, Occupancy. Filing M01315456-I1.
Filing M01315456-I1 reached an approved status.
NYCHA Boilers Dyckman Building 7: Mechanical work associated with boiler replacement as per plans filed herewith. Filing M00692466-P1.
Nycha boilers dyckman; building 7: plumbing work in relation to boiler replacement as per plans filed herwith. Filing M00636163-P2.
Filing M00636163-P2 reached an approved status.
The latest status recorded for M00636163-P2 is “Approved.”
The latest status recorded for M00636163-I1 is “Permit Entire.”
NYCHA BOILER -Dyckman. Building 7. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues and Boilers. Filing M00636170-P2.
NYCHA Boilers: Dyckman. Building 7: General Construction in reference to boiler replacement as per plans filed herewith. Filing M00691915-P1.
NYCHA Boilers Dyckman: Building7: Site/Civil work in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy. Filing M00688339-P1.
Filing M00636170-P2 reached an approved status.
The latest status recorded for M00636170-P2 is “Approved.”
The latest status recorded for M00636170-I1 is “Approved.”
Filing M00691915-P1 reached an approved status.
The latest status recorded for M00691915-P1 is “Approved.”
DOB lists a first permit date for M01315456-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01315456-I1 is “Permit Entire.”
Filing M00692466-P1 reached an approved status.
The latest status recorded for M00692466-P1 is “Approved.”
The latest status recorded for M00688339-P1 is “Objections.”
DOB lists a first permit date for M00692466-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00692466-I1 is “Permit Entire.”
DOB lists a first permit date for M00691915-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M00691915-I1 is “Permit Entire.”