Building record · BIN 1081119

1980 Park Avenue

1980 Park Avenue, Manhattan, NY 10037

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 4 independently sourced records, including 4 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1081119

1980 Park Avenue

East Harlem (North), Manhattan

A consolidated public-record view · updated Oct 23, 2026

DOB filings
4
Active-status
4
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings4
Open or active-status records4
First included filingMay 27, 2022
Latest recorded changeOct 23, 2026

The lot

What is already here?

The lot holds a 14-story elevator apartment building built in 1947, with 710 homes, on a 256,600 sq ft lot.

  1. Floors 13–14Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 38.2 m. Nothing on that side reaches this floor.
  2. Floors 2–12Homes710 homes are recorded on this lot — about 55 homes to a floor. The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as elevator apartments.
  • Street levelElevator apartments
  • Homes710 recorded on the lot
  • Above the southern skylineFrom about floor 13 — the tallest thing within 60 m to the south is 38.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 53.4 m over 14 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1947
Last altered
1997
Floors
14
Residential units
710
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
256,600 sq ft
Building area
449,600 sq ft

Housing violations

29 violations are open against this address under the Housing Maintenance Code. 4 of them are the class the city calls immediately hazardous.

  • 4Immediately hazardous
  • 23Hazardous
  • 2Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NYC HOUSING AUTHORITY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 11 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1081119. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing. Its latest status categories are 3 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 27, 2022
Latest recorded change
Oct 23, 2026
Highest proposed story count
14 stories
Highest proposed unit count
126 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1980 Park Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 4 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Blg 2 - roof repairs as per plans filed herewith, no change in use, egress or occupancy. existing roof perimeter guardrail to be removed and replaced with new guardrail.new concrete steps added at stair bulkhead entry doors. Filing M00653651-I1.

    01
  2. Alteration approved

    Filing M00653651-I1 reached an approved status.

    02
  3. Alteration filed

    Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. repair various concrete elements of thetank rooms and boiler room. new concrete area ways at tank rooms. Filing M00810768-S1.

    03
  4. Alteration approved

    Filing M00810768-S1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M00810768-S1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M00653651-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Blg 2 - roof repairs as per plans filed herewith, no change in use, egress or occupancy. existing roof perimeter guardrail to be removed and replaced with new guardrail.new concrete steps added at stair bulkhead entry doors. Filing M00653651-P3.

    07
  8. Alteration now approved

    The latest status recorded for M00810768-S1 is “Permit Entire.”

    08
  9. Alteration filed

    Blg 2 - roof repairs as per plans filed herewith. no change in use, egress or occupancy. Filing M00652915-P3.

    09
  10. Alteration approved

    Filing M00653651-P3 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for M00653651-P3 is “Approved.”

    011
  12. Alteration now under review

    The latest status recorded for M00652915-P3 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    012
  13. Alteration now approved

    The latest status recorded for M00653651-I1 is “Permit Entire.”

    013