DOB filing M01472579-I1
Alteration filing at 900 Third Avenue
Building record · BIN 1081162
900 Third Avenue, Manhattan, NY 10022
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 28 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1081162
900 Third Avenue
East Midtown-Turtle Bay, Manhattan
A consolidated public-record view · updated Oct 21, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 36-story office building built in 1983, on a 16,905 sq ft lot.
The apartments
290 condominium apartments are assessed on this block, and the typical one is 725 sq ft (67 m²). They run from 14 to 151 m².
The city values the typical one at $269,640. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
6 apartments on this tax block changed hands in the year the city last published, at a median of $2,875,000, from 685,000 to 2,875,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
STATE UNIVERSITY OF
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 102 notices on file; the most recent was issued Apr 21, 2020.
Issued Apr 21, 2020
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1081162. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 28 alteration filing. Its latest status categories are 14 approved, 13 recorded as completed, 1 closed or withdrawn. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 900 Third Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 28 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Application filed for interior renovation of non-load bearing partitions, ceilings and finishes on the 15th floor as per plans filed herewith. no change in use, egress or occupancy. Filing M00910417-I1.
Filing M00910417-I1 reached an approved status.
Application filed for plumbing and sprinkler modifications/additions on the 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M00910419-I1.
Filing M00910419-I1 reached an approved status.
DOB lists a first permit date for M00910417-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00910419-I1. That is not by itself confirmation of activity on site.
Modification to plumbing and sprinkler system as per plans filed herewith. Filing M01205424-I1.
Interior renovation as per plans filed herewith. Filing M01205410-I1.
Filing M01205410-I1 reached an approved status.
Filing M01205424-I1 reached an approved status.
DOB lists a first permit date for M01205410-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01205424-I1. That is not by itself confirmation of activity on site.
FACADE INSPECTION , caulking, netting, safety team. Filing M01210197-I1.
Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of walls, columns and floors on the cellar, 1st and mezzanine floors (Retail Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01255180-I1.
Filing M01255180-I1 reached an approved status.
Removal of existing plumbing fixtures and associated piping on the mezzanine (Retail Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01255284-I1.
Filing M01255284-I1 reached an approved status.
Modifications to the existing HVAC system on the cellar, 1st and mezzanine floors (Retail Demo & Whitebox) as per plans. No change to use, egress or occupancy. Filing M01255198-I1.
Filing M01255198-I1 reached an approved status.
DOB lists a first permit date for M01255180-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01255198-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01255284-I1. That is not by itself confirmation of activity on site.
Structural modifications and reinforcements on Floors 3, 4, 11, 20, 27, as per approved plans. No change to use, egress, or occupancy. Filing M01300755-I1.
Renovation of existing office space including interior partitions, doors, ceilings, and floors on Floors 3, 11, 20, 21, 27, 28, 29, 30 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01300651-I1.
Filing M01300755-I1 reached an approved status.
Filing M01300651-I1 reached an approved status.
Modifications to the existing HVAC system on Floors 3, 11, 20, 21, 27, 28, 29, 30 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01300814-I1.
Installation of new sprinkler heads and piping on Floors 3, 11, 20, 21, 27, 28, 29, 30 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01300829-I1.
Filing M01300829-I1 reached an approved status.
Modifications to the existing plumbing system on Floors 3, 11, 19, 20, 21, 26, 27, 28, 29, 30 (Kirkland & Ellis) as per plans. No change to use, egress or occupancy. Filing M01300823-I1.
Filing M01300814-I1 reached an approved status.
DOB lists a first permit date for M01300651-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01300814-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01300755-I1. That is not by itself confirmation of activity on site.
Filing M01300823-I1 reached an approved status.
DOB lists a first permit date for M01300829-I1. That is not by itself confirmation of activity on site.
Modifications to the existing HVAC system on Floors 33, 34, 35, 36 (Kirkland & Ellis), including kitchen rangehood ventilation system on the 33rd Floor, as per approved plans. No change to use, egress or occupancy. Filing M01317839-I1.
Installation of new sprinkler heads and piping on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01317935-I1.
Renovation of existing office space including interior partitions, doors, ceilings, and floors on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01317589-I1.
Structural modifications and reinforcements on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress, or occupancy. Filing M01317816-I1.
Filing M01317589-I1 reached an approved status.
Filing M01317816-I1 reached an approved status.
Filing M01317935-I1 reached an approved status.
Filing M01317839-I1 reached an approved status.
DOB lists a first permit date for M01317589-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01317839-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01317816-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01300823-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01317935-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01300823-I1.
The latest status recorded for M01300823-I1 is “LOC Issued.”
Installation of new sprinkler heads and piping on Floors 3, 11, 20, 21, 27, 28, 29, 30 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01300829-P1.
Installation of new sprinkler heads and piping on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01317935-P1.
DOB recorded a sign-off for M01300651-I1.
The latest status recorded for M01300651-I1 is “LOC Issued.”
Filing M01317935-P1 reached an approved status.
The latest status recorded for M01317935-P1 is “Approved.”
Filing M01300829-P1 reached an approved status.
The latest status recorded for M01300829-P1 is “Approved.”
The latest status recorded for M01300829-I1 is “Permit Entire.”
DOB recorded a sign-off for M01317816-I1.
The latest status recorded for M01317816-I1 is “LOC Issued.”
DOB recorded a sign-off for M01300755-I1.
The latest status recorded for M01300755-I1 is “LOC Issued.”
The latest status recorded for M00910419-I1 is “Permit Entire.”
Modifications to the existing HVAC system on Floors 3, 11, 20, 21, 27, 28, 29, 30 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy. Filing M01300814-P1.
DOB recorded a sign-off for M01205424-I1.
The latest status recorded for M01205424-I1 is “LOC Issued.”
DOB recorded a sign-off for M01317589-I1.
The latest status recorded for M01317589-I1 is “LOC Issued.”
Filing M01300814-P1 reached an approved status.
The latest status recorded for M01300814-P1 is “Approved.”
DOB recorded a sign-off for M00910417-I1.
The latest status recorded for M00910417-I1 is “LOC Issued.”
Removal of existing plumbing fixtures and associated piping on the 22nd floor (Suite Demo) as per plans. No change to use, egress or occupancy. Filing M01462918-I1.
Removal and disposal of interior partitions, doors, ceilings and finishes on the 22nd floor (Suite Demo) as per plans. No change to use, egress or occupancy. Filing M01462877-I1.
HVAC removals on the 22nd floor (Suite Demo) as per plans. No change to use, egress or occupancy. Filing M01462889-I1.
Removal of existing sprinkler system with installation of temporary heads on the 22nd floor (Suite Demo) as per plans. No change to use, egress or occupancy. Filing M01462926-I1.
DOB recorded a sign-off for M01317935-I1.
The latest status recorded for M01317935-I1 is “LOC Issued.”
Filing M01462877-I1 reached an approved status.
Filing M01462926-I1 reached an approved status.
The latest status recorded for M01462926-I1 is “Approved.”
DOB recorded a sign-off for M01300814-I1.
The latest status recorded for M01300814-I1 is “LOC Issued.”
The latest status recorded for M01317839-I1 is “Permit Entire.”
Filing M01462918-I1 reached an approved status.
DOB lists a first permit date for M01462877-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462877-I1 is “Permit Entire.”
Filing M01462889-I1 reached an approved status.
DOB lists a first permit date for M01462889-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462889-I1 is “Permit Entire.”
DOB lists a first permit date for M01462918-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01462918-I1 is “Permit Entire.”
DOB recorded a sign-off for M01255180-I1.
The latest status recorded for M01255180-I1 is “LOC Issued.”
DOB recorded a sign-off for M01255284-I1.
The latest status recorded for M01255284-I1 is “LOC Issued.”
DOB recorded a sign-off for M01255198-I1.
The latest status recorded for M01255198-I1 is “LOC Issued.”
The latest status recorded for M01210197-I1 is “Filing Withdrawn.”
Modifications to the existing plumbing system on the 1st floor (LL Work) as per plans. No change to use, egress or occupancy. Filing M01472595-I1.
Filing M01472595-I1 reached an approved status.
Modifications to the existing sprinkle system on the 1st floor (LL Work) as per plans. No change to use, egress or occupancy. Filing M01472606-I1.
Filing M01472606-I1 reached an approved status.
The latest status recorded for M01472606-I1 is “Approved.”
Minor demolition with installation of new partitions, doors, ceilings and finishes on 1st and mezzanine floors (LL Work) as per plans. No change to use, egress or occupancy. Filing M01472565-I1.
Modifications to the existing HVAC system on the 1st and mezzanine floors (LL Work) as per plans. No change to use, egress or occupancy. Filing M01472579-I1.
Filing M01472565-I1 reached an approved status.
Filing M01472579-I1 reached an approved status.
DOB lists a first permit date for M01472565-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01472565-I1 is “Permit Entire.”
DOB lists a first permit date for M01472595-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01472595-I1 is “Permit Entire.”
DOB lists a first permit date for M01472579-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01472579-I1 is “Permit Entire.”
DOB recorded a sign-off for M01205410-I1.
The latest status recorded for M01205410-I1 is “LOC Issued.”