Building record · BIN 1081185

825 Third Avenue

825 Third Avenue, Manhattan, NY 10022

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 33 independently sourced records, including 22 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1081185

825 Third Avenue

East Midtown-Turtle Bay, Manhattan

A consolidated public-record view · updated Oct 26, 2026

DOB filings
33
Active-status
22
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings33
Open or active-status records22
First included filingAug 8, 2025
Latest recorded changeOct 26, 2026

The lot

What is already here?

  1. Floors 39–53Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 116.4 m. Nothing on that side reaches this floor.
  2. Floors 2–38Nothing on record
  3. Floor 1Street levelStreet level.
  • Street levelThe way in
  • Above the southern skylineFrom about floor 39 — the tallest thing within 60 m to the south is 116.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 158.3 m over about 53 floors, counted at three metres each because the city publishes the height and not the number. 2 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.

The apartments

86 condominium apartments are assessed on this block, and the typical one is 790 sq ft (73 m²). They run from 65 to 317 m².

The city values the typical one at $354,150. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

4 apartments on this tax block changed hands in the year the city last published, at a median of $1,080,000, from 465,000 to 1,080,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

UNITED HAY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Violation record

Are there open violations here?

No open violations are recorded for this building. 101 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 28, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1081185. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 33 alteration filing. Its latest status categories are 21 approved, 1 under review, 11 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 8, 2025
Latest recorded change
Oct 26, 2026
Highest proposed story count
39 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 825 Third Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 33 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    General construction for Haven Capital on 35th marketing floor (34th construction). Filing M01264640-I1.

    01
  2. Alteration approved

    Filing M01264640-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01264640-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Plumbing work for Tokio HCC on 24th marketing floor (23rd construction). Filing M01282231-I1.

    04
  5. Alteration filed

    General construction for tenant Tokio HCC on 24th marketing floor (23rd construction). Filing M01282207-I1.

    05
  6. Alteration filed

    Mechanical work for Tokio HCC on 24th marketing floor (23rd construction). Filing M01282220-I1.

    06
  7. Alteration filed

    Sprinkler work for Tokio HCC on 24th marketing floor (23rd construction). Filing M01282249-I1.

    07
  8. Alteration approved

    Filing M01282231-I1 reached an approved status.

    08
  9. Alteration approved

    Filing M01282249-I1 reached an approved status.

    09
  10. Alteration approved

    Filing M01282207-I1 reached an approved status.

    010
  11. Alteration approved

    Filing M01282220-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01282220-I1. That is not by itself confirmation of activity on site.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01282207-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Mechanical work for Tokio HCC on 23rd marketing floor (22nd construction). Filing M01305530-I1.

    014
  15. Alteration filed

    Sprinkler work for Tokio HCC on 23rd marketing floor (22nd construction). Filing M01305540-I1.

    015
  16. Alteration filed

    Plumbing work for Tokio HCC on 23rd marketing floor (22nd construction). Filing M01305537-I1.

    016
  17. Alteration approved

    Filing M01305530-I1 reached an approved status.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01282249-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    General construction for tenant Tokio HCC on 23rd marketing floor (22nd construction). Filing M01305514-I1.

    019
  20. Alteration approved

    Filing M01305514-I1 reached an approved status.

    020
  21. Alteration approved

    Filing M01305540-I1 reached an approved status.

    021
  22. Alteration approved

    Filing M01305537-I1 reached an approved status.

    022
  23. Alteration filed

    Structural work for tenant Tokio HCC on 23rd marketing floor (22nd construction). Filing M01305524-I1.

    023
  24. Alteration approved

    Filing M01305524-I1 reached an approved status.

    024
  25. Permit recorded for alteration

    DOB lists a first permit date for M01305530-I1. That is not by itself confirmation of activity on site.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01305514-I1. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01305524-I1. That is not by itself confirmation of activity on site.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01282231-I1. That is not by itself confirmation of activity on site.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01305540-I1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01305537-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Structural work for new raised slab on 1st floor for west retail space. Filing M01428016-I1.

    031
  32. Alteration approved

    Filing M01428016-I1 reached an approved status.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01428016-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration filed

    General construction for Bespoke Treatments Relocation. Filing M01429276-I1.

    034
  35. Alteration approved

    Filing M01429276-I1 reached an approved status.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01429276-I1. That is not by itself confirmation of activity on site.

    036
  37. Alteration filed

    Sprinkler work for for Bespoke Treatments Relocation. Filing M01429300-I1.

    037
  38. Alteration filed

    Plumbing work for Bespoke Treatments Relocation. Filing M01429290-I1.

    038
  39. Alteration filed

    Interior demolition and construction for Sodali on 27th marketing floor (26th construction). Filing M01438070-I1.

    039
  40. Alteration approved

    Filing M01429300-I1 reached an approved status.

    040
  41. Alteration approved

    Filing M01429290-I1 reached an approved status.

    041
  42. Alteration filed

    Mechanical work for Bespoke Treatments Relocation. Filing M01429281-I1.

    042
  43. Alteration signed off

    DOB recorded a sign-off for M01264640-I1.

    043
  44. Alteration now completed

    The latest status recorded for M01264640-I1 is “LOC Issued.”

    044
  45. Alteration filed

    Sprinkler work for Sodali on 27th marketing floor (26th construction). Filing M01438182-I1.

    045
  46. Alteration filed

    Plumbing work for Sodali on 27th marketing floor (26th construction). Filing M01438178-I1.

    046
  47. Alteration filed

    Mechanical work for Sodali on 27th marketing floor (26th construction). Filing M01438099-I1.

    047
  48. Alteration approved

    Filing M01438070-I1 reached an approved status.

    048
  49. Alteration approved

    Filing M01429281-I1 reached an approved status.

    049
  50. Alteration approved

    Filing M01438182-I1 reached an approved status.

    050
  51. Alteration approved

    Filing M01438178-I1 reached an approved status.

    051
  52. Alteration approved

    Filing M01438099-I1 reached an approved status.

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for M01429290-I1. That is not by itself confirmation of activity on site.

    053
  54. Alteration now approved

    The latest status recorded for M01429290-I1 is “Permit Entire.”

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01429281-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration now approved

    The latest status recorded for M01429281-I1 is “Permit Entire.”

    056
  57. Alteration signed off

    DOB recorded a sign-off for M01305537-I1.

    057
  58. Alteration now completed

    The latest status recorded for M01305537-I1 is “LOC Issued.”

    058
  59. Alteration signed off

    DOB recorded a sign-off for M01305524-I1.

    059
  60. Alteration now completed

    The latest status recorded for M01305524-I1 is “LOC Issued.”

    060
  61. Alteration filed

    General construction during relocation of fire command station. Filing M01440832-I1.

    061
  62. Alteration signed off

    DOB recorded a sign-off for M01305530-I1.

    062
  63. Alteration now completed

    The latest status recorded for M01305530-I1 is “LOC Issued.”

    063
  64. Alteration signed off

    DOB recorded a sign-off for M01305540-I1.

    064
  65. Alteration now completed

    The latest status recorded for M01305540-I1 is “LOC Issued.”

    065
  66. Alteration signed off

    DOB recorded a sign-off for M01305514-I1.

    066
  67. Alteration now completed

    The latest status recorded for M01305514-I1 is “LOC Issued.”

    067
  68. Alteration approved

    Filing M01440832-I1 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for M01440832-I1 is “Approved.”

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01429300-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01429300-I1 is “Permit Entire.”

    071
  72. Alteration signed off

    DOB recorded a sign-off for M01282249-I1.

    072
  73. Alteration now completed

    The latest status recorded for M01282249-I1 is “LOC Issued.”

    073
  74. Alteration filed

    Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new ADA restrooms, cafe/ pantry and studio/podcast and studio control space. No change in use, egress or occupancy. Filing M01457131-I1.

    074
  75. Alteration filed

    Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new core restrooms, new warming pantry, meeting spaces. Filing M01457211-I1.

    075
  76. Alteration approved

    Filing M01457131-I1 reached an approved status.

    076
  77. Alteration approved

    Filing M01457211-I1 reached an approved status.

    077
  78. Alteration filed

    Alteration, addition of (2) supplemental water source heat pump, (16) supplemental VRF evaporators, (4) water source condensing units, associated ducts, and piping. No change to use, egress, or occupancy. Filing M01457214-I1.

    078
  79. Alteration approved

    Filing M01457214-I1 reached an approved status.

    079
  80. Alteration filed

    Alteration, addition of (4) electric baseboard radiators, (7) supplemental water source heat pumps, associated ducts, and piping. No change to use, egress, or occupancy. Filing M01457154-I1.

    080
  81. Alteration approved

    Filing M01457154-I1 reached an approved status.

    081
  82. Alteration filed

    Mechanical work for WEF Welcome Center on 1st floor. Filing M01454305-I1.

    082
  83. Alteration filed

    Structural modifications as per plans filed herewith. NO change in use, egress or occupancy. Filing M01457187-I1.

    083
  84. Alteration filed

    Sprinkler work for WEF Welcome Center on 1st floor. Filing M01454322-I1.

    084
  85. Alteration filed

    General construction for Bespoke Treatments Relocation. Filing M01429276-P1.

    085
  86. Alteration approved

    Filing M01454305-I1 reached an approved status.

    086
  87. Alteration filed

    Interior demolition and general construction for WEF Welcome Center on 1st floor. Filing M01454297-I1.

    087
  88. Alteration approved

    Filing M01457187-I1 reached an approved status.

    088
  89. Alteration filed

    Plumbing work for WEF Welcome Center on 1st floor. Filing M01454317-I1.

    089
  90. Alteration approved

    Filing M01454322-I1 reached an approved status.

    090
  91. Alteration now approved

    The latest status recorded for M01454322-I1 is “Approved.”

    091
  92. Alteration signed off

    DOB recorded a sign-off for M01428016-I1.

    092
  93. Alteration now completed

    The latest status recorded for M01428016-I1 is “LOC Issued.”

    093
  94. Alteration approved

    Filing M01454297-I1 reached an approved status.

    094
  95. Alteration approved

    Filing M01454317-I1 reached an approved status.

    095
  96. Alteration now approved

    The latest status recorded for M01454317-I1 is “Approved.”

    096
  97. Alteration signed off

    DOB recorded a sign-off for M01282220-I1.

    097
  98. Alteration now completed

    The latest status recorded for M01282220-I1 is “LOC Issued.”

    098
  99. Permit recorded for alteration

    DOB lists a first permit date for M01457187-I1. That is not by itself confirmation of activity on site.

    099
  100. Alteration now approved

    The latest status recorded for M01457187-I1 is “Permit Entire.”

    0100
  101. Alteration now approved

    The latest status recorded for M01457131-I1 is “Approved.”

    0101
  102. Permit recorded for alteration

    DOB lists a first permit date for M01457211-I1. That is not by itself confirmation of activity on site.

    0102
  103. Alteration now approved

    The latest status recorded for M01457211-I1 is “Permit Entire.”

    0103
  104. Permit recorded for alteration

    DOB lists a first permit date for M01457214-I1. That is not by itself confirmation of activity on site.

    0104
  105. Alteration now approved

    The latest status recorded for M01457214-I1 is “Permit Entire.”

    0105
  106. Permit recorded for alteration

    DOB lists a first permit date for M01457154-I1. That is not by itself confirmation of activity on site.

    0106
  107. Alteration now approved

    The latest status recorded for M01457154-I1 is “Permit Entire.”

    0107
  108. Alteration signed off

    DOB recorded a sign-off for M01282207-I1.

    0108
  109. Alteration now completed

    The latest status recorded for M01282207-I1 is “LOC Issued.”

    0109
  110. Alteration filed

    Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. Filing M01457224-I1.

    0110
  111. Alteration filed

    Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy. Filing M01457175-I1.

    0111
  112. Permit recorded for alteration

    DOB lists a first permit date for M01454305-I1. That is not by itself confirmation of activity on site.

    0112
  113. Alteration now approved

    The latest status recorded for M01454305-I1 is “Permit Entire.”

    0113
  114. Permit recorded for alteration

    DOB lists a first permit date for M01454297-I1. That is not by itself confirmation of activity on site.

    0114
  115. Alteration now approved

    The latest status recorded for M01454297-I1 is “Permit Entire.”

    0115
  116. Alteration approved

    Filing M01429276-P1 reached an approved status.

    0116
  117. Alteration now approved

    The latest status recorded for M01429276-P1 is “Approved.”

    0117
  118. Alteration signed off

    DOB recorded a sign-off for M01282231-I1.

    0118
  119. Alteration now completed

    The latest status recorded for M01282231-I1 is “LOC Issued.”

    0119
  120. Alteration now approved

    The latest status recorded for M01429276-I1 is “Permit Entire.”

    0120
  121. Alteration approved

    Filing M01457224-I1 reached an approved status.

    0121
  122. Alteration approved

    Filing M01457175-I1 reached an approved status.

    0122
  123. Permit recorded for alteration

    DOB lists a first permit date for M01457175-I1. That is not by itself confirmation of activity on site.

    0123
  124. Alteration now approved

    The latest status recorded for M01457175-I1 is “Permit Issued.”

    0124
  125. Permit recorded for alteration

    DOB lists a first permit date for M01438099-I1. That is not by itself confirmation of activity on site.

    0125
  126. Alteration now approved

    The latest status recorded for M01438099-I1 is “Permit Entire.”

    0126
  127. Permit recorded for alteration

    DOB lists a first permit date for M01438070-I1. That is not by itself confirmation of activity on site.

    0127
  128. Alteration now approved

    The latest status recorded for M01438070-I1 is “Permit Entire.”

    0128
  129. Permit recorded for alteration

    DOB lists a first permit date for M01438178-I1. That is not by itself confirmation of activity on site.

    0129
  130. Alteration now approved

    The latest status recorded for M01438178-I1 is “Permit Entire.”

    0130
  131. Permit recorded for alteration

    DOB lists a first permit date for M01438182-I1. That is not by itself confirmation of activity on site.

    0131
  132. Alteration now approved

    The latest status recorded for M01438182-I1 is “Permit Entire.”

    0132
  133. Alteration filed

    Industrial rope access for facade inspections. no changes in the means of egress. Filing M01477924-I1.

    0133
  134. Alteration now under review

    The latest status recorded for M01477924-I1 is “Pending Plan Examiner Assignment.”

    0134
  135. Permit recorded for alteration

    DOB lists a first permit date for M01457224-I1. That is not by itself confirmation of activity on site.

    0135
  136. Alteration now approved

    The latest status recorded for M01457224-I1 is “Permit Issued.”

    0136