DOB filing M01407884-P1
Alteration filing at 610 Fifth Avenue
Building record · BIN 1082656
610 Fifth Avenue, Manhattan, NY 10020
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 17 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1082656
610 Fifth Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Oct 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story office building built in 1937, on a 63,261 sq ft lot.
Owner of record
RCPI LANDMARK PROPERTIES,
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 5, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 46 notices on file; the most recent was issued May 31, 2018.
Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Issued Aug 26, 2010
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 5, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1082656. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 17 alteration filing. Its latest status categories are 13 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 610 Fifth Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 17 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Store space renovation on 1st floor as per plans filed herewith. no change to use, egress or occupancy. Filing M08029170-I1.
Filing M08029170-I1 reached an approved status.
Storefront work for michael kors store as per plans filed herewith. no change to use, egress or occupancy. Filing M01245280-I1.
Filing M01245280-I1 reached an approved status.
DOB lists a first permit date for M08029170-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01245280-I1. That is not by itself confirmation of activity on site.
Sprinkler heads relocation in store space on 1st fl as per plans filed herewith. no change to use, egress or occupancy. Filing M01248988-S2.
Filing M01248988-S2 reached an approved status.
Plumbing fixtures installation for the store space on 1st fl as per plans filed herewith. no change to use, egress or occupancy. Filing M01248988-S1.
Filing M01248988-S1 reached an approved status.
DOB lists a first permit date for M01248988-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01248988-S1. That is not by itself confirmation of activity on site.
Alterations to 7th floor terrace as per plans. No change to use, egress or occupancy. Filing M01103866-I1.
Filing M01103866-I1 reached an approved status.
DOB lists a first permit date for M01103866-I1. That is not by itself confirmation of activity on site.
Alterations to plumbing system in partial 4th floor as per plans. No change to use, egress or occupancy. Filing M01407884-I1.
Alterations to sprinkler system in partial 4th floor as per plans. No change to use, egress or occupancy. Filing M01407874-I1.
Demolition and general construction on the partial 4th floor as per plans. No change to use. egress or occupancy. Filing M01243803-I1.
Filing M01243803-I1 reached an approved status.
Filing M01407884-I1 reached an approved status.
Filing M01407874-I1 reached an approved status.
DOB lists a first permit date for M01243803-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01407884-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01407874-I1. That is not by itself confirmation of activity on site.
Alterations to plumbing system on 6th floor as per plans. No change to use, egress or occupancy. Filing M01411239-I1.
Filing M01411239-I1 reached an approved status.
Alterations to mechanical system on 6th floor as per plans. No change to use, egress or occupancy. Filing M01411228-I1.
Alterations to sprinkler system on 6th floor as per plans. No change to use, egress or occupancy. Filing M01411234-I1.
Filing M01411234-I1 reached an approved status.
Install of temp Truss structure, prod equip, no alt to exist structures for GAP NYFW Pop-Up Activation. TPA not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event complete. Filing M01447310-I1.
DOB lists a first permit date for M01411234-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01411234-I1 is “Permit Entire.”
Filing M01447310-I1 reached an approved status.
Alterations to 7th floor terrace as per plans. No change to use, egress or occupancy. Filing M01103866-P2.
DOB lists a first permit date for M01447310-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01447310-I1 is “Permit Entire.”
Filing M01103866-P2 reached an approved status.
The latest status recorded for M01103866-P2 is “Approved.”
The latest status recorded for M01103866-I1 is “Permit Entire.”
DOB lists a first permit date for M01411239-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01411239-I1 is “Permit Entire.”
Filing M01411228-I1 reached an approved status.
DOB lists a first permit date for M01411228-I1. That is not by itself confirmation of activity on site.
Alterations to mechanical system on 6th floor as per plans. No change to use, egress or occupancy. Filing M01411228-P1.
Filing M01411228-P1 reached an approved status.
The latest status recorded for M01411228-P1 is “Approved.”
The latest status recorded for M01411228-I1 is “Permit Entire.”
Alterations to plumbing system in partial 4th floor as per plans. No change to use, egress or occupancy. Filing M01407884-P1.
DOB recorded a sign-off for M01248988-S2.
The latest status recorded for M01248988-S2 is “LOC Issued.”
DOB recorded a sign-off for M01248988-S1.
The latest status recorded for M01248988-S1 is “LOC Issued.”
DOB recorded a sign-off for M01245280-I1.
The latest status recorded for M01245280-I1 is “LOC Issued.”
DOB recorded a sign-off for M08029170-I1.
The latest status recorded for M08029170-I1 is “LOC Issued.”
The latest status recorded for M01407874-I1 is “Permit Entire.”
Alterations to sprinkler system in partial 4th floor as per plans. No change to use, egress or occupancy. Filing M01407874-P1.
Filing M01407874-P1 reached an approved status.
The latest status recorded for M01407874-P1 is “Approved.”
The latest status recorded for M01243803-I1 is “Permit Entire.”
Demolition and general construction on the partial 4th floor as per plans. No change to use. egress or occupancy. Filing M01243803-P1.
Filing M01243803-P1 reached an approved status.
The latest status recorded for M01243803-P1 is “Approved.”
Filing M01407884-P1 reached an approved status.
The latest status recorded for M01407884-P1 is “Approved.”
The latest status recorded for M01407884-I1 is “Permit Entire.”