DOB filing M01450838-S4
Alteration filing at 55 Water Street
Building record · BIN 1083346
55 Water Street, Manhattan, NY 10041
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 14 independently sourced records, including 13 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1083346
55 Water Street
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Oct 30, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 53-story condominium built in 1973, on a 160,692 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 636 notices on file; the most recent was issued Nov 6, 2010.
Issued Nov 6, 2010
Issued Oct 6, 2010
Issued Oct 19, 2007
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1083346. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 14 alteration filing. Its latest status categories are 9 approved, 4 under review, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 55 Water Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 14 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Filing herewith architectural drawings, showing office renovations on the 32nd floor, as per plans submitted. No change in Use, Egress or Occupancy under this application. Filing M01285789-I1.
Filing M01285789-I1 reached an approved status.
DOB lists a first permit date for M01285789-I1. That is not by itself confirmation of activity on site.
Removal and replacement of pavers at 3rd floor plaza and exterior stairs leading up at 1st-3rd. Filing M01310344-I1.
Filing M01310344-I1 reached an approved status.
DOB lists a first permit date for M01310344-I1. That is not by itself confirmation of activity on site.
Interior alterations to the 10th and 11th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. Filing M01372194-I1.
Structural modifications for the installation of new convenience stairs from the 10th to 11th floors as per plans. Filing M01372194-S4.
Filing M01372194-I1 reached an approved status.
Filing M01372194-S4 reached an approved status.
DOB lists a first permit date for M01372194-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01372194-S4. That is not by itself confirmation of activity on site.
Interior Renovation and new demising wall on part of 1st floor. Filing M01400040-I1.
Modification to mechanical systems on part of 1st floor. Demolition and reconnecting of existing after demo done. Filing M01400040-S1.
Filing M01400040-I1 reached an approved status.
DOB lists a first permit date for M01400040-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01400040-I1 is “Permit Entire.”
The latest status recorded for M01372194-I1 is “Permit Entire.”
The latest status recorded for M01372194-S4 is “Permit Entire.”
The latest status recorded for M01310344-I1 is “Permit Entire.”
Modification to plumbing & sprinkler on part of 1st floor. Filing M01400040-S2.
The latest status recorded for M01400040-S2 is “Plan Examiner Review.”
DOB recorded a sign-off for M01285789-I1.
The latest status recorded for M01285789-I1 is “LOC Issued.”
Interior renovation on parts of 13th and 14th floors related to conference center. Filing M01450838-I1.
Filing M01450838-I1 reached an approved status.
Structural modification as shown on plans. Filing M01450838-S2.
Filing M01450838-S2 reached an approved status.
DOB lists a first permit date for M01450838-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01450838-I1 is “Permit Entire.”
DOB lists a first permit date for M01450838-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01450838-S2 is “Permit Entire.”
Victoria's secret office - plumbing work to accommodate new layout as per plans filed herewith. no change in egress, use or occupancy. Filing M01473822-I1.
The latest status recorded for M01400040-S1 is “Plan Examiner Review.”
Victoria's secret office. sprinkler work associated with new layout for tenant as per plans filed herewith. no change in egress, use or occupancy. Filing M01473862-I1.
The latest status recorded for M01473862-I1 is “Prof Cert QA Review.”
Victoria's secret office - mechanical work associated with new tenant layout as per plans filed herewith. no change to egress, use or occupancy. Filing M01473831-I1.
The latest status recorded for M01473831-I1 is “Prof Cert QA Review.”
Filing M01473822-I1 reached an approved status.
The latest status recorded for M01473822-I1 is “Approved.”
Sprinkler, standpipe and plumbing modification on part of 13th floor. Filing M01450838-S4.
Victoria's Secret - Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egress, use or occupancy. Filing M01470503-I1.
Filing M01450838-S4 reached an approved status.
The latest status recorded for M01450838-S4 is “Approved.”
Filing M01470503-I1 reached an approved status.
The latest status recorded for M01470503-I1 is “Approved.”