Building record · BIN 1083810

1000 5 Avenue

1000 5 Avenue, Manhattan, NY 10028

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 32 independently sourced records, including 26 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1083810

1000 5 Avenue

Central Park, Manhattan

A consolidated public-record view · updated Oct 20, 2026

DOB filings
32
Active-status
26
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings32
Open or active-status records26
First included filingJun 25, 2024
Latest recorded changeOct 20, 2026

The lot

What is already here?

The lot holds a outdoor recreation facility on a 36,590,000 sq ft lot.

  1. Floors 2–9Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as open space and outdoor recreation.
  • Street levelOpen space and outdoor recreation
Drawn from the outline and roof height the Department of City Planning publishes for this building: 26.8 m over about 9 floors, counted at three metres each because the city publishes the height and not the number. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor.
Residential units
0
Building type
Outdoor recreation facility
Land use
Open space and outdoor recreation
Zoning district
PARK
Lot area
36,590,000 sq ft
Building area
34,025 sq ft
Historic district
Scenic Landmark

Owner of record

NYC PARKS

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 284 notices on file; the most recent was issued Dec 23, 2010.

  • Elevator

    Issued Dec 23, 2010

  • Elevator

    Issued Aug 13, 2004

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1083810. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 32 alteration filing. Its latest status categories are 6 recorded as completed, 7 under review, 19 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 25, 2024
Latest recorded change
Oct 20, 2026
Highest proposed story count
6 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1000 5 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 32 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Anec. mechanical work as per plans filed herewith. Filing M01060210-S2.

    01
  2. Alteration filed

    Anec. provide complete new wet fire sprinkler protection throughout the north,south, west and east galleries, and wing d and j attic of anec galleries. remove 2 existing class iii fire hose rack assemblies and cabinets in g173 and g404. Filing M01060210-S3.

    02
  3. Alteration approved

    Filing M01060210-S2 reached an approved status.

    03
  4. Alteration approved

    Filing M01060210-S3 reached an approved status.

    04
  5. Alteration filed

    Mechanical demolition equipment, pmm filing in conjunction with dobnow # m01171387-i1. Filing M01171387-S1.

    05
  6. Alteration filed

    Select interior demolition as shown on plan drawings herein. Filing M01171387-I1.

    06
  7. Alteration approved

    Filing M01171387-I1 reached an approved status.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01171387-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01197051-I1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01197051-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    SCO Security Operations Center. Plumbing work as per plans. Filing M01194216-S3.

    011
  12. Alteration approved

    Filing M01171387-S1 reached an approved status.

    012
  13. Alteration approved

    Filing M01194216-S3 reached an approved status.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01171387-S1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Great hall gallery - package 2 early demo. structural work as per plans filed herewith. Filing M01216253-S6.

    015
  16. Alteration filed

    Great hall gallery package 2. demo work as per plans filed herewith. no change in use, egress or occupancy. Filing M01216253-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01060210-S3. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with chapter 33 of NYC building code of 2022. Filing M01227058-I1.

    018
  19. Permit recorded for alteration

    DOB lists a first permit date for M01227058-I1. That is not by itself confirmation of activity on site.

    019
  20. Alteration filed

    Great hall gallery - package 2 early demo. soe work for proposed elevator pit in cellar. Filing M01216253-S5.

    020
  21. Alteration filed

    Great hall gallery - package 2 early demo. mechanical work as per plans filed herewith. Filing M01216253-S2.

    021
  22. Alteration approved

    Filing M01216253-I1 reached an approved status.

    022
  23. Alteration approved

    Filing M01216253-S2 reached an approved status.

    023
  24. Alteration approved

    Filing M01216253-S6 reached an approved status.

    024
  25. Alteration filed

    PAA-01 for Partial Demolition Means and Methods for Interior Structures at Great Hall Gallery in the MET. Filing M01216253-S7.

    025
  26. Alteration approved

    Filing M01216253-S7 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01216253-S7. That is not by itself confirmation of activity on site.

    027
  28. Alteration approved

    Filing M01216253-S5 reached an approved status.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01216253-S6. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01216253-I1. That is not by itself confirmation of activity on site.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01216253-S2. That is not by itself confirmation of activity on site.

    031
  32. Alteration filed

    Installation of a temporary roof protection as per plans during general construction. no change in use, egress or occupancy. roof protection to comply with 2022 NYC building code, chapter 33. Filing M01300519-I1.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01300519-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration filed

    Installation of temporary construction fence as per plans during general construction work. no change in use, egress or occupancy. construction fence shall comply with chapter 33 of NYC building code of 2022. Filing M01301126-I1.

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01301126-I1. That is not by itself confirmation of activity on site.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01216253-S5. That is not by itself confirmation of activity on site.

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01194216-S3. That is not by itself confirmation of activity on site.

    037
  38. Alteration filed

    SSCP. South Side Chiller Plant. DEMO AND REPLACE EXIST. COOLING TOWER ON P-WING ROOF. DECOMISSIONING OF EXIST. SATELITE CHILLER PLANTS IN K-WING AND U-WING. ADDITION OF 2 NEW CHILLERS IN THE T-WING FOOTPRINT. CENTRALIZATION OF THE CHILLED WATER SYSTEM. Filing M01318809-S2.

    038
  39. Alteration filed

    SSCP South Side Chiller Plant. Structural work as per plans filed herewith. Filing M01318809-S1.

    039
  40. Alteration filed

    New tang wing. sprinkler and standpipe work as per plans. Filing M01289549-S4.

    040
  41. Alteration filed

    Sscp south side chiller plant. demolition of generators on p-wing roof and demolition of existing fuel storage systems serving generators. new fuel storage pumping systems located in the existing to remain basement/ground floor level serving new generator. Filing M01318809-S5.

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01060210-S2. That is not by itself confirmation of activity on site.

    042
  43. Alteration approved

    Filing M01318809-S2 reached an approved status.

    043
  44. Alteration approved

    Filing M01318809-S1 reached an approved status.

    044
  45. Alteration approved

    Filing M01318809-S5 reached an approved status.

    045
  46. Alteration filed

    Installation of a temporary sprinkler protection system on the north side of the basement at the met parking 2 stair public core and shell. as per plans submitted herewith, no change in use, egress or occupancy group. Filing M01353221-I1.

    046
  47. Alteration filed

    Installation of a temporary sprinkler protection system on the south side of the basement at the met parking 2 stair public core and shell. as per plans submitted herewith, no change in use, egress or occupancy group. Filing M01352032-I1.

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for M01352032-I1. That is not by itself confirmation of activity on site.

    048
  49. Permit recorded for alteration

    DOB lists a first permit date for M01353221-I1. That is not by itself confirmation of activity on site.

    049
  50. Alteration filed

    Installation of temporary construction fence during the Met Tang Wing Addition (filed separately under # M01289549) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01400536-I1.

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for M01400536-I1. That is not by itself confirmation of activity on site.

    051
  52. Alteration filed

    Anec. provide complete new wet fire sprinkler protection throughout the north,south, west and east galleries, and wing d and j attic of anec galleries. remove 2 existing class iii fire hose rack assemblies and cabinets in g173 and g404. Filing M01060210-P7.

    052
  53. Alteration filed

    Installation of a temporary sprinkler protection system on cellar level at the met parking 2 stair as per plans submitted herewith, no change in use, egress or occupancy group. Filing M01420505-I1.

    053
  54. Alteration approved

    Filing M01420505-I1 reached an approved status.

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01420505-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration filed

    Installation of temporary debris chute for use during partial demolition, filed separately under M01289549-I1. Filing M01289549-Z6.

    056
  57. Alteration filed

    Installation of temporary debris chute for use during interior demolition, filed separately under M01289549-I1. Filing M01289549-Z4.

    057
  58. Alteration approved

    Filing M01289549-Z4 reached an approved status.

    058
  59. Alteration approved

    Filing M01289549-Z6 reached an approved status.

    059
  60. Alteration filed

    SOC Security Operations Center. Modifications to existing sprinkler system. Filing M01194216-P1.

    060
  61. Alteration filed

    NSCP North side Chiller Plant. Application filed for replacement of existing chillers, rooftop cooling towers, and interior renovations to spaces with accessory uses: office, workshops, storage and mechanical rooms as per plans filed herewith. Filing M01172778-P8.

    061
  62. Alteration filed

    Installation of temporary construction fence during the Met Tang Wing Addition (filed separately under # M01289549) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. Filing M01400536-P1.

    062
  63. Alteration now approved

    The latest status recorded for M01227058-I1 is “Permit Entire.”

    063
  64. Alteration now approved

    The latest status recorded for M01216253-S7 is “Permit Entire.”

    064
  65. Alteration approved

    Filing M01400536-P1 reached an approved status.

    065
  66. Alteration now approved

    The latest status recorded for M01400536-P1 is “Approved.”

    066
  67. Alteration filed

    Installation and use of temporary knuckleboom construction equipment as per plans filed herewith. Filing M01450222-I1.

    067
  68. Permit recorded for alteration

    DOB lists a first permit date for M01450222-I1. That is not by itself confirmation of activity on site.

    068
  69. Alteration now approved

    The latest status recorded for M01450222-I1 is “Permit Entire.”

    069
  70. Alteration now approved

    The latest status recorded for M01400536-I1 is “Permit Entire.”

    070
  71. Permit recorded for alteration

    DOB lists a first permit date for M01289549-Z4. That is not by itself confirmation of activity on site.

    071
  72. Alteration now approved

    The latest status recorded for M01289549-Z4 is “Permit Entire.”

    072
  73. Permit recorded for alteration

    DOB lists a first permit date for M01289549-Z6. That is not by itself confirmation of activity on site.

    073
  74. Alteration now approved

    The latest status recorded for M01289549-Z6 is “Permit Entire.”

    074
  75. Alteration signed off

    DOB recorded a sign-off for M01420505-I1.

    075
  76. Alteration now completed

    The latest status recorded for M01420505-I1 is “LOC Issued.”

    076
  77. Alteration signed off

    DOB recorded a sign-off for M01352032-I1.

    077
  78. Alteration now completed

    The latest status recorded for M01352032-I1 is “LOC Issued.”

    078
  79. Alteration filed

    Installation of a temporary sprinkler protection system on the north side of the basement at the met parking 2 stair public core and shell. as per plans submitted herewith, no change in use, egress or occupancy group. Filing M01353221-P1.

    079
  80. Alteration approved

    Filing M01353221-P1 reached an approved status.

    080
  81. Alteration now approved

    The latest status recorded for M01353221-P1 is “Approved.”

    081
  82. Permit recorded for alteration

    DOB lists a first permit date for M01318809-S2. That is not by itself confirmation of activity on site.

    082
  83. Alteration now approved

    The latest status recorded for M01318809-S2 is “Permit Entire.”

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01318809-S1. That is not by itself confirmation of activity on site.

    084
  85. Alteration now approved

    The latest status recorded for M01318809-S1 is “Permit Entire.”

    085
  86. Alteration now approved

    The latest status recorded for M01197051-I1 is “Permit Entire.”

    086
  87. Alteration signed off

    DOB recorded a sign-off for M01353221-I1.

    087
  88. Alteration now completed

    The latest status recorded for M01353221-I1 is “LOC Issued.”

    088
  89. Alteration now approved

    The latest status recorded for M01216253-S5 is “Permit Entire.”

    089
  90. Alteration now approved

    The latest status recorded for M01216253-I1 is “Permit Entire.”

    090
  91. Alteration now approved

    The latest status recorded for M01216253-S2 is “Permit Entire.”

    091
  92. Alteration now approved

    The latest status recorded for M01216253-S6 is “Permit Entire.”

    092
  93. Alteration now under review

    The latest status recorded for M01060210-S2 is “On Hold - Pending Supersede of Applicant of Record.”

    093
  94. Alteration now approved

    The latest status recorded for M01301126-I1 is “Permit Entire.”

    094
  95. Alteration now approved

    The latest status recorded for M01300519-I1 is “Permit Entire.”

    095
  96. Permit recorded for alteration

    DOB lists a first permit date for M01318809-S5. That is not by itself confirmation of activity on site.

    096
  97. Alteration now approved

    The latest status recorded for M01318809-S5 is “Permit Entire.”

    097
  98. Alteration now under review

    The latest status recorded for M01060210-P7 is “On Hold - Pending Supersede of Applicant of Record.”

    098
  99. Alteration now under review

    The latest status recorded for M01060210-S3 is “On Hold - Pending Supersede of Applicant of Record.”

    099
  100. Alteration now under review

    The latest status recorded for M01289549-S4 is “Plan Examiner Review.”

    0100
  101. Alteration filed

    Great hall gallery - package 2 early demo. structural work as per plans filed herewith. Filing M01216253-P4.

    0101
  102. Alteration now under review

    The latest status recorded for M01216253-P4 is “Plan Examiner Review.”

    0102
  103. Alteration filed

    Equipment use: placement of the knuckle boom truck to assist crash deck installation. no change in use, egress or occupancy under this application. Filing M01471051-I1.

    0103
  104. Permit recorded for alteration

    DOB lists a first permit date for M01471051-I1. That is not by itself confirmation of activity on site.

    0104
  105. Alteration now approved

    The latest status recorded for M01471051-I1 is “Permit Entire.”

    0105
  106. Alteration signed off

    DOB recorded a sign-off for M01171387-I1.

    0106
  107. Alteration now completed

    The latest status recorded for M01171387-I1 is “LOC Issued.”

    0107
  108. Alteration now under review

    The latest status recorded for M01172778-P8 is “Objections.”

    0108
  109. Alteration signed off

    DOB recorded a sign-off for M01171387-S1.

    0109
  110. Alteration now completed

    The latest status recorded for M01171387-S1 is “LOC Issued.”

    0110
  111. Alteration now under review

    The latest status recorded for M01194216-P1 is “Plan Examiner Review.”

    0111
  112. Alteration signed off

    DOB recorded a sign-off for M01194216-S3.

    0112
  113. Alteration now completed

    The latest status recorded for M01194216-S3 is “LOC Issued.”

    0113