DOB filing M01436052-S1
Alteration filing at 45 Rockefeller Plaza
Building record · BIN 1083860
45 Rockefeller Plaza, Manhattan, NY 10020
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1083860
45 Rockefeller Plaza
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 9, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 31-story office building built in 1932, on a 184,764 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 11, 2026. They describe the tax lot, not any single filing.
Violation record
The Department of Buildings has 8 open notices on record for this building, out of 469 notices on file; the most recent was issued Nov 15, 2021.
Issued Nov 15, 2021
Issued Apr 7, 2020
Issued Sep 25, 2019
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1083860. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 12 alteration filing. Its latest status categories are 1 under review, 11 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 45 Rockefeller Plaza.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Modify mechanical ductwork and associated piping as shown on plans. No change in use, egress or occupancy. Filing M01092540-I1.
Filing M01092540-I1 reached an approved status.
DOB lists a first permit date for M01092540-I1. That is not by itself confirmation of activity on site.
Alterations to mechanical system on suite 2100 as per plans. No change to use, egress or occupancy. Filing M01413037-I1.
Alterations to sprinkler and standpipe system in suite 2100 as per plans. No change to use, egress or occupancy. Filing M01413040-I1.
Filing M01413040-I1 reached an approved status.
Alterations to plumbing system in suite 2100 as per plans. No change to use, egress or occupancy. Filing M01413043-I1.
Filing M01413043-I1 reached an approved status.
Demolition and general construction work in suite 2100 as per plans. No change to use, egress or occupancy. Filing M01413030-I1.
Filing M01413030-I1 reached an approved status.
Removal and installation of interior non-load bearing partition and related finishes as per drawings filed herewith. Filing M01436052-I1.
Removal and installation of interior non-load bearing partition and related finishes as per drawings. Filing M01436058-I1.
Moveable partition supports; Partition Wall Support. General Construction. No change in egress, use, or occupancy. Filing M01436052-S3.
Filing M01436052-S3 reached an approved status.
The latest status recorded for M01436052-S3 is “Approved.”
Filing M01436052-I1 reached an approved status.
The latest status recorded for M01436052-I1 is “Approved.”
Modification to existing Plumbing fixtures, Sprinkler and Standpipe systems as per plans filed herewith. No change to egress, occupancy, use. Filing M01436058-S3.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01436058-S1.
Modification to existing Standpipe, Sprinkler, Plumbing systems as per plans filed herewith. No change to use, egress, or occupancy. Filing M01436052-S4.
DOB lists a first permit date for M01413030-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01413030-I1 is “Permit Entire.”
Filing M01436058-I1 reached an approved status.
Filing M01436058-S3 reached an approved status.
The latest status recorded for M01436058-S3 is “Approved.”
Filing M01436058-S1 reached an approved status.
The latest status recorded for M01436058-S1 is “Approved.”
Filing M01436052-S4 reached an approved status.
The latest status recorded for M01436052-S4 is “Approved.”
The latest status recorded for M01436058-I1 is “Approved.”
DOB lists a first permit date for M01413043-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01413043-I1 is “Permit Entire.”
DOB lists a first permit date for M01413040-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01413040-I1 is “Permit Issued.”
Filing M01413037-I1 reached an approved status.
The latest status recorded for M01413037-I1 is “Approved.”
The latest status recorded for M01092540-I1 is “Permit Entire.”
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01436052-S1.
The latest status recorded for M01436052-S1 is “Prof Cert QA Review.”