DOB filing M00990578-P6
Alteration filing at 160 Convent Avenue
Building record · BIN 1084081
160 Convent Avenue, Manhattan, NY 10031
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1084081
160 Convent Avenue
Manhattanville-West Harlem, Manhattan
A consolidated public-record view · updated Sep 18, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 5-story educational building built in 1979, on a 433,411 sq ft lot.
Owner of record
DORMITORY AUTHORITY
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 63 open notices on record for this building, out of 130 notices on file; the most recent was issued Nov 14, 2025.
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
60 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1084081. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 6 alteration filing. Its latest status categories are 6 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 160 Convent Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
The Mechanical work shall comply with MC 107, MC 1202 materials, MC 1203 Joints, MC 1204 insulation, MC 1205 valves, MC 1206 installation, and MC 1208 testing. Filing M00990578-S1.
Filing M00990578-S1 reached an approved status.
Replacement of boilers- ccny north academic center boiler plant upgrade. Filing M01285644-I1.
Filing M01285644-I1 reached an approved status.
Installation/removal/relocation of existing sprinkle heads and associated branch piping on the 1st floor as per plans. No change in use, egress or occupancy. Filing M01284945-S3.
Filing M01284945-S3 reached an approved status.
DOB lists a first permit date for M00990578-S1. That is not by itself confirmation of activity on site.
Installation of temporary 8" gas piping to connect two mobile boiler trailers that will provide heat to the building during heating season in conjunction with m01281865-i1 and m01285644-i1. no change in use, egress, or occupancy. Filing M01422542-I1.
Filing M01422542-I1 reached an approved status.
The Mechanical work shall comply with MC 107, MC 1202 materials, MC 1203 Joints, MC 1204 insulation, MC 1205 valves, MC 1206 installation, and MC 1208 testing. Filing M00990578-P6.
Interior renovation of ADA restrooms on 6th fl of city college of new york, nac building as per plans. no chnage in use, egress or occupancy. Filing M01446819-I1.
DOB lists a first permit date for M01285644-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01285644-I1 is “Permit Entire.”
DOB lists a first permit date for M01422542-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01422542-I1 is “Permit Entire.”
DOB lists a first permit date for M01284945-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01284945-S3 is “Permit Entire.”
Filing M01446819-I1 reached an approved status.
The latest status recorded for M01446819-I1 is “Approved.”
Filing M00990578-P6 reached an approved status.
The latest status recorded for M00990578-P6 is “Approved.”
The latest status recorded for M00990578-S1 is “Permit Entire.”