Building record · BIN 1084667

745 7 Avenue

745 7 Avenue, Manhattan, NY 10019

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 13 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1084667

745 7 Avenue

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 30, 2026

DOB filings
13
Active-status
10
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings13
Open or active-status records10
First included filingMar 19, 2025
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 32-story office building built in 1999, on a 62,459 sq ft lot.

  1. Floors 2–32Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 77 — the tallest thing within 60 m to the south is 228.3 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 161.1 m over 32 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1999
Floors
32
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-7T
Lot area
62,459 sq ft
Building area
1,020,000 sq ft

Owner of record

US REAL ESTATE HOLDINGS NO.1 LIMITED

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 144 notices on file; the most recent was issued May 2, 2013.

  • Elevator

    Issued May 2, 2013

  • Elevator

    Issued May 2, 2013

  • Elevator

    Issued May 2, 2013

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1084667. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 13 alteration filing. Its latest status categories are 7 approved, 3 recorded as completed, 3 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Mar 19, 2025
Latest recorded change
Sep 30, 2026
Highest proposed story count
32 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 745 7 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 13 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Alterations to existing sprinkler fixtures as per plans filed herewith. Filing M01167552-I1.

    01
  2. Alteration approved

    Filing M01167552-I1 reached an approved status.

    02
  3. Alteration filed

    Alterations to existing mechancial systems as per plans filed herewith. Filing M01167565-I1.

    03
  4. Alteration approved

    Filing M01167565-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01167565-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for M01167552-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Ereby filing to install new ductwork and relocation of an existing unit and associated piping as shown on plans filed herewith. no change to use, occupancy to egress. Filing M01357635-S1.

    07
  8. Alteration approved

    Filing M01357635-S1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01357635-S1. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Hereby filing to remove existing plumbing fixtures and related piping as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01388818-S2.

    010
  11. Alteration approved

    Filing M01388818-S2 reached an approved status.

    011
  12. Alteration filed

    Equipment use: installation of a temporary personnel construction hoist complex as per plans during general construction work. no change in use, egress or occupancy. hoist installed in accordance with 2022 NYC building code, chapter 33. Filing M01407139-I1.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01407139-I1. That is not by itself confirmation of activity on site.

    013
  14. Alteration filed

    Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01415329-S2.

    014
  15. Alteration approved

    Filing M01415329-S2 reached an approved status.

    015
  16. Alteration filed

    Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01416517-S2.

    016
  17. Alteration approved

    Filing M01416517-S2 reached an approved status.

    017
  18. Alteration filed

    Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01416550-S2.

    018
  19. Alteration filed

    Hereby Filing herewith mechanical/hvac installations, additions, and modifications to MER room Mechanical system for infrastructure upgrade as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01424790-I1.

    019
  20. Alteration approved

    Filing M01416550-S2 reached an approved status.

    020
  21. Alteration filed

    Hereby filing to modify standpipe, replace sprinkler heads with related piping for infrastructure renovation as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01424790-S2.

    021
  22. Alteration filed

    Hereby filing to replace and install plumbing fixtures with related piping as shown on plans filed herewith. No change to use, occupancy or egress. Filing M01424790-S1.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for M01388818-S2. That is not by itself confirmation of activity on site.

    023
  24. Alteration now approved

    The latest status recorded for M01388818-S2 is “Permit Entire.”

    024
  25. Alteration now under review

    The latest status recorded for M01424790-S2 is “Objections.”

    025
  26. Alteration now under review

    The latest status recorded for M01424790-S1 is “Objections.”

    026
  27. Alteration now under review

    The latest status recorded for M01424790-I1 is “Objections.”

    027
  28. Alteration signed off

    DOB recorded a sign-off for M01167565-I1.

    028
  29. Alteration now completed

    The latest status recorded for M01167565-I1 is “LOC Issued.”

    029
  30. Alteration signed off

    DOB recorded a sign-off for M01167552-I1.

    030
  31. Alteration now completed

    The latest status recorded for M01167552-I1 is “LOC Issued.”

    031
  32. Alteration filed

    Equipment use: installation of a temporary personnel construction hoist complex as per plans during general construction work. no change in use, egress or occupancy. hoist installed in accordance with 2022 NYC building code, chapter 33. Filing M01407139-P1.

    032
  33. Alteration approved

    Filing M01407139-P1 reached an approved status.

    033
  34. Alteration now approved

    The latest status recorded for M01407139-P1 is “Approved.”

    034
  35. Permit recorded for alteration

    DOB lists a first permit date for M01415329-S2. That is not by itself confirmation of activity on site.

    035
  36. Alteration now approved

    The latest status recorded for M01415329-S2 is “Permit Entire.”

    036
  37. Permit recorded for alteration

    DOB lists a first permit date for M01416550-S2. That is not by itself confirmation of activity on site.

    037
  38. Alteration now approved

    The latest status recorded for M01416550-S2 is “Permit Entire.”

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M01416517-S2. That is not by itself confirmation of activity on site.

    039
  40. Alteration now approved

    The latest status recorded for M01416517-S2 is “Permit Entire.”

    040
  41. Alteration now approved

    The latest status recorded for M01407139-I1 is “Permit Entire.”

    041
  42. Alteration signed off

    DOB recorded a sign-off for M01357635-S1.

    042
  43. Alteration now completed

    The latest status recorded for M01357635-S1 is “LOC Issued.”

    043
  44. Alteration filed

    Installation of a temporary loading dock as per plans during general construction work. no change in use, egress or occupancy. loading dock shall comply with chapter 33 of NYC building code of 2022. Filing M01467626-I1.

    044
  45. Permit recorded for alteration

    DOB lists a first permit date for M01467626-I1. That is not by itself confirmation of activity on site.

    045
  46. Alteration now approved

    The latest status recorded for M01467626-I1 is “Permit Entire.”

    046