Building record · BIN 1085493

1568 Broadway

1568 Broadway, Manhattan, NY 10036

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1085493

1568 Broadway

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Aug 26, 2026

DOB filings
7
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings7
Open or active-status records5
First included filingJun 5, 2024
Latest recorded changeAug 26, 2026

The lot

What is already here?

The lot holds a 47-story condominium built in 1989, on a 21,758 sq ft lot.

Built
1989
Last altered
2019
Floors
47
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C6-7T
Lot area
21,758 sq ft
Building area
498,782 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 179 notices on file; the most recent was issued Feb 22, 2022.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • Construction

    Issued Nov 2, 2019 — SUPPORTED PIPE SCAFFOLDING ERECTED WITHOUT PERMIT

  • Local law 10/81 -

    Issued Jan 13, 1997

  • 1 further open notice is on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1085493. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 alteration filing. Its latest status categories are 5 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 5, 2024
Latest recorded change
Aug 26, 2026
Highest proposed story count
47 stories
Highest proposed unit count
661 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1568 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Sprinkler modifications taking place on the sub-cellar and 13th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01041407-I1.

    01
  2. Alteration filed

    Plumbing modifications taking place on the 12th and 13th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01041403-I1.

    02
  3. Alteration approved

    Filing M01041403-I1 reached an approved status.

    03
  4. Alteration filed

    Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy. Filing M01040083-I1.

    04
  5. Alteration approved

    Filing M01040083-I1 reached an approved status.

    05
  6. Alteration filed

    General construction modifications taking place in the sub-cellar and 13th floor as per drawings filed herewtith. no change in use, egress or occupancy. Filing M01040077-I1.

    06
  7. Alteration approved

    Filing M01040077-I1 reached an approved status.

    07
  8. Alteration approved

    Filing M01041407-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01041407-I1. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01040083-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01040077-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01041403-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    (Tenant Rig) Temporary Construction associated with one-time TPA event. Filing M01407994-I1.

    013
  14. Alteration approved

    Filing M01407994-I1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01407994-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. Filing M01430429-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01430429-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration now approved

    The latest status recorded for M01041407-I1 is “Permit Entire.”

    018
  19. Alteration now approved

    The latest status recorded for M01041403-I1 is “Permit Entire.”

    019
  20. Alteration now approved

    The latest status recorded for M01040083-I1 is “Permit Entire.”

    020
  21. Alteration filed

    Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. Filing M01430429-P1.

    021
  22. Alteration signed off

    DOB recorded a sign-off for M01407994-I1.

    022
  23. Alteration now completed

    The latest status recorded for M01407994-I1 is “LOC Issued.”

    023
  24. Alteration signed off

    DOB recorded a sign-off for M01040077-I1.

    024
  25. Alteration now completed

    The latest status recorded for M01040077-I1 is “LOC Issued.”

    025
  26. Alteration now approved

    The latest status recorded for M01430429-I1 is “Permit Entire.”

    026
  27. Alteration approved

    Filing M01430429-P1 reached an approved status.

    027
  28. Alteration now approved

    The latest status recorded for M01430429-P1 is “Approved.”

    028