DOB filing M01430429-I1
Alteration filing at 1568 Broadway
Building record · BIN 1085493
1568 Broadway, Manhattan, NY 10036
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 7 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1085493
1568 Broadway
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Aug 26, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 47-story condominium built in 1989, on a 21,758 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 4 open notices on record for this building, out of 179 notices on file; the most recent was issued Feb 22, 2022.
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Issued Nov 2, 2019 — SUPPORTED PIPE SCAFFOLDING ERECTED WITHOUT PERMIT
Issued Jan 13, 1997
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1085493. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 7 alteration filing. Its latest status categories are 5 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1568 Broadway.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 7 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Sprinkler modifications taking place on the sub-cellar and 13th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01041407-I1.
Plumbing modifications taking place on the 12th and 13th floor as per drawings filed herewith. no change in use, egress or occupancy. Filing M01041403-I1.
Filing M01041403-I1 reached an approved status.
Mechanical modifications taking place in sub-cellar and floors 12 through 14 as per drawings filed herewith. No change in use, egress or occupancy. Filing M01040083-I1.
Filing M01040083-I1 reached an approved status.
General construction modifications taking place in the sub-cellar and 13th floor as per drawings filed herewtith. no change in use, egress or occupancy. Filing M01040077-I1.
Filing M01040077-I1 reached an approved status.
Filing M01041407-I1 reached an approved status.
DOB lists a first permit date for M01041407-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01040083-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01040077-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01041403-I1. That is not by itself confirmation of activity on site.
(Tenant Rig) Temporary Construction associated with one-time TPA event. Filing M01407994-I1.
Filing M01407994-I1 reached an approved status.
DOB lists a first permit date for M01407994-I1. That is not by itself confirmation of activity on site.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. Filing M01430429-I1.
DOB lists a first permit date for M01430429-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01041407-I1 is “Permit Entire.”
The latest status recorded for M01041403-I1 is “Permit Entire.”
The latest status recorded for M01040083-I1 is “Permit Entire.”
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. Filing M01430429-P1.
DOB recorded a sign-off for M01407994-I1.
The latest status recorded for M01407994-I1 is “LOC Issued.”
DOB recorded a sign-off for M01040077-I1.
The latest status recorded for M01040077-I1 is “LOC Issued.”
The latest status recorded for M01430429-I1 is “Permit Entire.”
Filing M01430429-P1 reached an approved status.
The latest status recorded for M01430429-P1 is “Approved.”