Building record · BIN 1085695

562 First Avenue

562 First Avenue, Manhattan, NY 10016

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 22 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1085695

562 First Avenue

Murray Hill-Kips Bay, Manhattan

A consolidated public-record view · updated Nov 16, 2026

DOB filings
22
Active-status
18
Recorded addresses
3
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings22
Open or active-status records18
First included filingApr 8, 2024
Latest recorded changeNov 16, 2026

The lot

What is already here?

The lot holds a condominium built in 1900, on a 362,642 sq ft lot.

  1. Floors 2–25Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 32 — the tallest thing within 60 m to the south is 95.1 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 75 m over about 25 floors, counted at three metres each because the city publishes the height and not the number. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1900
Residential units
0
Building type
Condominium
Land use
Public facilities and institutions
Zoning district
R8
Lot area
362,642 sq ft
Building area
2,216,199 sq ft

Housing violations

20 violations are open against this address under the Housing Maintenance Code. 2 of them are the class the city calls immediately hazardous.

  • 2Immediately hazardous
  • 3Hazardous
  • 7Non-hazardous
  • 8Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

NATIONAL PASS RR CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 26 notices on file; the most recent was issued Feb 22, 2024.

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1085695. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 22 alteration filing. Its latest status categories are 8 under review, 10 approved, 4 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Apr 8, 2024
Latest recorded change
Nov 16, 2026
Highest proposed story count
19 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 562 First Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 22 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Herewith filing Structural modifications for NYU OR Expansion - Tisch 6. No change in use, egress, or occupancy. Filing M01031232-I1.

    01
  2. Alteration filed

    Herewith filing General Construction modifications for NYU OR Expansion - Tisch 6. No change in use, egress, or occupancy. Filing M01031209-I1.

    02
  3. Alteration approved

    Filing M01031209-I1 reached an approved status.

    03
  4. Alteration approved

    Filing M01031232-I1 reached an approved status.

    04
  5. Alteration filed

    Herewith filing Sprinkler modifications for NYU OR Expansion - Tisch 6. No change in use, egress, or occupancy. Filing M01031229-I1.

    05
  6. Alteration filed

    Herewith filing Plumbing modifications for NYU OR Expansion - Tisch 6. No change in use, egress, or occupancy. Filing M01031225-I1.

    06
  7. Alteration approved

    Filing M01031229-I1 reached an approved status.

    07
  8. Alteration filed

    Herewith filing Mechanical modifications for NYU OR Expansion - Tisch 6. No change to use, egress, or occupancy. Filing M01031224-I1.

    08
  9. Alteration approved

    Filing M01031225-I1 reached an approved status.

    09
  10. Alteration approved

    Filing M01031224-I1 reached an approved status.

    010
  11. Alteration filed

    Renewal of SR21/2820. Filing M01075943-I1.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01031232-I1. That is not by itself confirmation of activity on site.

    012
  13. Permit recorded for alteration

    DOB lists a first permit date for M01031224-I1. That is not by itself confirmation of activity on site.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01031209-I1. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01031225-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration approved

    Filing M01075943-I1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01075943-I1. That is not by itself confirmation of activity on site.

    017
  18. Permit recorded for alteration

    DOB lists a first permit date for M01031229-I1. That is not by itself confirmation of activity on site.

    018
  19. Alteration filed

    Installation of overlay panels over existing spandrel panels, fire-rated opening infill and miscellaneous facade maintenance. No change in use, egress or occupancy. Filing M01217189-I1.

    019
  20. Alteration approved

    Filing M01217189-I1 reached an approved status.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M01217189-I1. That is not by itself confirmation of activity on site.

    021
  22. Alteration filed

    NYULH Tisch ED CT Room - Sprinkler modifications on Basement as shown on plans filed herewith. No change in egress, occupancy or use. Filing M01359990-S3.

    022
  23. Alteration approved

    Filing M01359990-S3 reached an approved status.

    023
  24. Alteration filed

    Tisch decant cellar floor interior renovation - general construction modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01392196-I1.

    024
  25. Alteration filed

    Tisch decant cellar floor interior renovation - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01392196-S2.

    025
  26. Alteration approved

    Filing M01392196-S2 reached an approved status.

    026
  27. Alteration approved

    Filing M01392196-I1 reached an approved status.

    027
  28. Alteration filed

    Tisch 14w interior renovation - general construction modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01374762-I1.

    028
  29. Alteration filed

    Tisch 14w construction - sprinkler modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01374762-S3.

    029
  30. Alteration filed

    Tisch 14w minor demo - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01374762-S2.

    030
  31. Permit recorded for alteration

    DOB lists a first permit date for M01392196-I1. That is not by itself confirmation of activity on site.

    031
  32. Alteration filed

    Tisch 14w interior renovation - mechanical modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01374762-S1.

    032
  33. Alteration now approved

    The latest status recorded for M01392196-I1 is “Permit Entire.”

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01392196-S2. That is not by itself confirmation of activity on site.

    034
  35. Alteration now approved

    The latest status recorded for M01392196-S2 is “Permit Entire.”

    035
  36. Alteration now approved

    The latest status recorded for M01217189-I1 is “Permit Entire.”

    036
  37. Alteration now approved

    The latest status recorded for M01075943-I1 is “Permit Entire.”

    037
  38. Alteration approved

    Filing M01374762-I1 reached an approved status.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M01374762-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration now approved

    The latest status recorded for M01374762-I1 is “Permit Entire.”

    040
  41. Alteration filed

    Alteration of existing 6th floor clean/soiled storage rooms. New partitions, millwork, fire-rated door frames, ceilings and finishes, coordinated with MEP demolition and new work, per plans filed herewith. No change in egress, occupancy, or use. Filing M01441585-I1.

    041
  42. Alteration filed

    Alterations to existing 6th floor offices/storage rooms. Mechanical work includes duct modifications and rebalancing of existing supply/return systems serving areas within and beyond scope, per plans filed herewith. No change in egress, occupancy, or use. Filing M01441585-S1.

    042
  43. Alteration now under review

    The latest status recorded for M01441585-S1 is “Plan Examiner Review.”

    043
  44. Alteration filed

    Alterations to existing 6th floor clean and soiled storage rooms. Plumbing scope: install new sink connecting to existing domestic water and sanitary/vent risers in ceiling chase, per plans filed herewith. No change in egress, occupancy, or use. Filing M01441585-S2.

    044
  45. Alteration signed off

    DOB recorded a sign-off for M01031209-I1.

    045
  46. Alteration now completed

    The latest status recorded for M01031209-I1 is “LOC Issued.”

    046
  47. Alteration filed

    Alterations to existing 6th floor storage/support rooms. Sprinkler scope: demolish (5) existing heads and branch piping, install (4) new heads reconnected to existing sprinkler main, per plans filed herewith. No change in egress, occupancy, or use. Filing M01441585-S3.

    047
  48. Alteration now under review

    The latest status recorded for M01441585-S3 is “Plan Examiner Review.”

    048
  49. Alteration signed off

    DOB recorded a sign-off for M01031225-I1.

    049
  50. Alteration now completed

    The latest status recorded for M01031225-I1 is “LOC Issued.”

    050
  51. Alteration now under review

    The latest status recorded for M01441585-S2 is “Plan Examiner Review.”

    051
  52. Alteration now approved

    The latest status recorded for M01031224-I1 is “Permit Entire.”

    052
  53. Alteration filed

    Tisch 12w phase 1 interior renovation - general costruction modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01376855-I1.

    053
  54. Alteration now under review

    The latest status recorded for M01376855-I1 is “Plan Examiner Review.”

    054
  55. Alteration approved

    Filing M01374762-S2 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for M01374762-S2 is “Approved.”

    056
  57. Alteration filed

    Tisch 12w interior renovation - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01376855-S2.

    057
  58. Alteration signed off

    DOB recorded a sign-off for M01031229-I1.

    058
  59. Alteration now completed

    The latest status recorded for M01031229-I1 is “LOC Issued.”

    059
  60. Alteration now under review

    The latest status recorded for M01441585-I1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    060
  61. Alteration filed

    Tisch 12w phase 2 interior renovation - general construction modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01465462-I1.

    061
  62. Alteration now under review

    The latest status recorded for M01465462-I1 is “Pending CPE/ACPE Assignment.”

    062
  63. Alteration now under review

    The latest status recorded for M01376855-S2 is “Plan Examiner Review.”

    063
  64. Alteration signed off

    DOB recorded a sign-off for M01031232-I1.

    064
  65. Alteration now completed

    The latest status recorded for M01031232-I1 is “LOC Issued.”

    065
  66. Alteration approved

    Filing M01374762-S1 reached an approved status.

    066
  67. Alteration now approved

    The latest status recorded for M01374762-S1 is “Approved.”

    067
  68. Alteration approved

    Filing M01374762-S3 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for M01374762-S3 is “Approved.”

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01359990-S3. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01359990-S3 is “Permit Entire.”

    071
  72. Alteration filed

    Nyu tisch ed expansion - general construction modifications as per plans filed herewith. no change in use, egress, or occupancy. Filing M01480671-I1.

    072
  73. Alteration now under review

    The latest status recorded for M01480671-I1 is “Pending Prof Cert QA Assignment.”

    073