DOB filing M01248236-S1
Alteration filing at 130 Malcolm X Boulevard
Building record · BIN 1085936
130 Malcolm X Boulevard, Manhattan, NY 10026
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 2 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1085936
130 Malcolm X Boulevard
Harlem (South), Manhattan
A consolidated public-record view · updated Sep 21, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 11-story condominium built in 2000, with 240 homes, on a 80,731 sq ft lot.
Housing violations
39 violations are open against this address under the Housing Maintenance Code. 11 of them are the class the city calls immediately hazardous.
Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.
What it sold for
4 apartments on this tax block changed hands in the year the city last published, at a median of $725,000, from 365,000 to 2,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 83 notices on file; the most recent was issued Jun 23, 2024.
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1085936. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 2 approved, 1 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 130 Malcolm X Boulevard.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy. Filing M01244511-I1.
Filing M01244511-I1 reached an approved status.
DOB lists a first permit date for M01244511-I1. That is not by itself confirmation of activity on site.
Interior renovation of commercial space, demolition of non-load bearing partitions, erection of new partitions, finishes, painting and flooring work. All as per plans and applications. Filing M01280080-I1.
Filing M01280080-I1 reached an approved status.
Installation of pipe scaffold as per plans. in complaince with chapter 33 of NYC bc. no change in use, egress or occupancy. Filing M01248236-S1.
DOB lists a first permit date for M01248236-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01244511-I1 is “Permit Entire.”
DOB lists a first permit date for M01280080-I1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01280080-I1.
The latest status recorded for M01280080-I1 is “LOC Issued.”
The latest status recorded for M01248236-S1 is “Permit Entire.”