Building record · BIN 1087119

3 Bryant Park

3 Bryant Park, Manhattan, NY 10036

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 28 independently sourced records, including 23 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1087119

3 Bryant Park

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Sep 30, 2026

DOB filings
28
Active-status
23
Recorded addresses
3
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings28
Open or active-status records23
First included filingAug 16, 2024
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 41-story condominium built in 1972, on a 56,781 sq ft lot.

  1. Floors 2–41Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 43 — the tallest thing within 60 m to the south is 127.4 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 191.1 m over 41 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1972
Last altered
2007
Floors
41
Residential units
0
Building type
Condominium
Land use
Commercial and office
Zoning district
C6-6
Lot area
56,781 sq ft
Building area
1,041,794 sq ft

Owner of record

JMVD REALTY NY LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 161 notices on file; the most recent was issued Mar 28, 2012.

  • Elevator

    Issued Mar 28, 2012

  • Elevator

    Issued Mar 28, 2012

  • Elevator

    Issued Mar 28, 2012

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1087119. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 28 alteration filing. Its latest status categories are 17 approved, 6 under review, 5 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 16, 2024
Latest recorded change
Sep 30, 2026
Highest proposed story count
42 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 3 Bryant Park.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 28 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to the existing Sprinkler System: Remove (7) heads and Install (7) new heads and piping on 3rd Floor, Remove (6) heads and Install (6) new heads and associated piping on the 4th Floor as per plans (Stifel Restroom Project.). Filing M01089357-I1.

    01
  2. Alteration approved

    Filing M01089357-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01089357-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Hereby filing concrete equipment pad modifications and minor wall alterations in support of new mechanical equipment and rigging paths on floor 7, and 9 thru 11. Filing M01186392-I1.

    04
  5. Alteration approved

    Filing M01186392-I1 reached an approved status.

    05
  6. Alteration filed

    Hereby filing modifications to existing mechanical system and related duct & piping per plans filed herewith. Filing M01186398-I1.

    06
  7. Alteration approved

    Filing M01186398-I1 reached an approved status.

    07
  8. Alteration filed

    Remove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; Relocate (2) sprinkler heads on the 4th Floor as per plans (Stifel - New Offices & Conference Rooms.). Filing M01289977-I1.

    08
  9. Alteration approved

    Filing M01289977-I1 reached an approved status.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01186392-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01186398-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01289977-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    General construction on 39th floor as per plans filed herewith. No change in use, egress or occupancy. Filing M01418052-I1.

    013
  14. Alteration approved

    Filing M01418052-I1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01418052-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Removal of plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Demo Phase.) No change to use, egress or occupancy. Filing M01445358-I1.

    016
  17. Alteration approved

    Filing M01445358-I1 reached an approved status.

    017
  18. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Demo Phase.) No change to use, egress or occupancy. Filing M01444946-I1.

    018
  19. Alteration filed

    Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 38th Floor as per plans (IMC Demo Phase.) No change to use, egress or occupancy. Filing M01444964-I1.

    019
  20. Alteration now under review

    The latest status recorded for M01444964-I1 is “Prof Cert QA Review.”

    020
  21. Alteration approved

    Filing M01444946-I1 reached an approved status.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M01444946-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration now approved

    The latest status recorded for M01444946-I1 is “Permit Entire.”

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M01445358-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration now approved

    The latest status recorded for M01445358-I1 is “Permit Entire.”

    025
  26. Alteration signed off

    DOB recorded a sign-off for M01418052-I1.

    026
  27. Alteration now completed

    The latest status recorded for M01418052-I1 is “LOC Issued.”

    027
  28. Alteration filed

    Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 40th Floor as per plans (Hines - Demo.) No change to use, egress or occupancy. Filing M01439555-I1.

    028
  29. Alteration filed

    Install new plumbing fixtures and associated CW/sanitary piping on the 38th Floors as per plans (IMC Buildout Phase.) No change to use, egress or occupancy. Filing M01452956-I1.

    029
  30. Alteration filed

    Modifications to the existing HVAC System: Installation and relocation of ductwork and returns on the 38th Floor as per plans (IMC Buildout Phase.) No change to use, egress or occupancy. Filing M01452954-I1.

    030
  31. Alteration filed

    Modifications to the existing Sprinkler System: Remove (277) existing sprinkler heads, Install (43) new sprinkler heads and associated sprinkler piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy. Filing M01440267-I1.

    031
  32. Alteration filed

    Removal of plumbing fixtures and associated CW/sanitary piping on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy. No change to use, egress or occupancy. Filing M01440259-I1.

    032
  33. Alteration filed

    Modifications to the existing HVAC System. Install new ductwork, piping, controls and equipment on the 40th Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy. Filing M01440227-I1.

    033
  34. Alteration filed

    Modifications to the existing Sprinkler System: Remove (3) heads, relocate (21) heads and Install (7) new sprinkler heads and associated piping on the 38th Floor as per plans (IMC Buildout.) No change to use, egress or occupancy. Filing M01452983-I1.

    034
  35. Alteration approved

    Filing M01452956-I1 reached an approved status.

    035
  36. Alteration approved

    Filing M01440267-I1 reached an approved status.

    036
  37. Alteration approved

    Filing M01440259-I1 reached an approved status.

    037
  38. Alteration approved

    Filing M01440227-I1 reached an approved status.

    038
  39. Alteration approved

    Filing M01452983-I1 reached an approved status.

    039
  40. Alteration now approved

    The latest status recorded for M01452983-I1 is “Approved.”

    040
  41. Alteration filed

    Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 38th Floors as per plans (IMC - Buildout Phase.) No change to use, egress or occupancy. Filing M01452902-I1.

    041
  42. Alteration approved

    Filing M01452954-I1 reached an approved status.

    042
  43. Alteration approved

    Filing M01439555-I1 reached an approved status.

    043
  44. Alteration signed off

    DOB recorded a sign-off for M01289977-I1.

    044
  45. Alteration now completed

    The latest status recorded for M01289977-I1 is “LOC Issued.”

    045
  46. Alteration signed off

    DOB recorded a sign-off for M01089357-I1.

    046
  47. Alteration now completed

    The latest status recorded for M01089357-I1 is “LOC Issued.”

    047
  48. Permit recorded for alteration

    DOB lists a first permit date for M01440227-I1. That is not by itself confirmation of activity on site.

    048
  49. Alteration now approved

    The latest status recorded for M01440227-I1 is “Permit Entire.”

    049
  50. Alteration approved

    Filing M01452902-I1 reached an approved status.

    050
  51. Permit recorded for alteration

    DOB lists a first permit date for M01440259-I1. That is not by itself confirmation of activity on site.

    051
  52. Alteration now approved

    The latest status recorded for M01440259-I1 is “Permit Entire.”

    052
  53. Permit recorded for alteration

    DOB lists a first permit date for M01440267-I1. That is not by itself confirmation of activity on site.

    053
  54. Alteration now approved

    The latest status recorded for M01440267-I1 is “Permit Entire.”

    054
  55. Permit recorded for alteration

    DOB lists a first permit date for M01439555-I1. That is not by itself confirmation of activity on site.

    055
  56. Alteration now approved

    The latest status recorded for M01439555-I1 is “Permit Entire.”

    056
  57. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422841-I1.

    057
  58. Alteration approved

    Filing M01422841-I1 reached an approved status.

    058
  59. Alteration filed

    Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupancy. Filing M01422906-I1.

    059
  60. Alteration approved

    Filing M01422906-I1 reached an approved status.

    060
  61. Alteration filed

    Removal of plumbing fixtures and associated CW/sanitary piping on the 12th Floor as per plans (Verizon Demo Phase.) No change to use, egress or occupancy. Filing M01422923-I1.

    061
  62. Permit recorded for alteration

    DOB lists a first permit date for M01452954-I1. That is not by itself confirmation of activity on site.

    062
  63. Alteration now approved

    The latest status recorded for M01452954-I1 is “Permit Entire.”

    063
  64. Alteration filed

    Removal of two (2) sinks, one (1) WC and associated CW/sanitary piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy. No change to use, egress or occupancy. Filing M01440432-I1.

    064
  65. Alteration filed

    Modifications to the existing HVAC System. Removal of ductwork, piping, controls and equipment back to core on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy. Filing M01440430-I1.

    065
  66. Alteration filed

    Minor interior demolition. Removal & disposal of interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Hines - Demo.) No change to use, egress or occupancy. Filing M01439563-I1.

    066
  67. Alteration filed

    Modifications to the existing Sprinkler System: Remove (48) existing sprinkler heads, Install (41) new sprinkler heads and associated sprinkler piping on the 1st Floor as per plans (LL Work - Retail Demo.) No change to use, egress or occupancy. Filing M01440434-I1.

    067
  68. Alteration approved

    Filing M01422923-I1 reached an approved status.

    068
  69. Alteration now approved

    The latest status recorded for M01422923-I1 is “Approved.”

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01452902-I1. That is not by itself confirmation of activity on site.

    070
  71. Alteration now approved

    The latest status recorded for M01452902-I1 is “Permit Entire.”

    071
  72. Alteration signed off

    DOB recorded a sign-off for M01186398-I1.

    072
  73. Alteration now completed

    The latest status recorded for M01186398-I1 is “LOC Issued.”

    073
  74. Alteration approved

    Filing M01440432-I1 reached an approved status.

    074
  75. Alteration approved

    Filing M01440434-I1 reached an approved status.

    075
  76. Alteration now approved

    The latest status recorded for M01440434-I1 is “Approved.”

    076
  77. Alteration signed off

    DOB recorded a sign-off for M01186392-I1.

    077
  78. Alteration now completed

    The latest status recorded for M01186392-I1 is “LOC Issued.”

    078
  79. Alteration now approved

    The latest status recorded for M01422841-I1 is “Approved.”

    079
  80. Alteration now approved

    The latest status recorded for M01422906-I1 is “Approved.”

    080
  81. Alteration approved

    Filing M01440430-I1 reached an approved status.

    081
  82. Alteration approved

    Filing M01439563-I1 reached an approved status.

    082
  83. Alteration now approved

    The latest status recorded for M01452956-I1 is “Approved.”

    083
  84. Permit recorded for alteration

    DOB lists a first permit date for M01440430-I1. That is not by itself confirmation of activity on site.

    084
  85. Alteration now approved

    The latest status recorded for M01440430-I1 is “Permit Entire.”

    085
  86. Permit recorded for alteration

    DOB lists a first permit date for M01439563-I1. That is not by itself confirmation of activity on site.

    086
  87. Alteration now approved

    The latest status recorded for M01439563-I1 is “Permit Entire.”

    087
  88. Permit recorded for alteration

    DOB lists a first permit date for M01440432-I1. That is not by itself confirmation of activity on site.

    088
  89. Alteration now approved

    The latest status recorded for M01440432-I1 is “Permit Entire.”

    089
  90. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 12th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422841-P1.

    090
  91. Alteration now under review

    The latest status recorded for M01422841-P1 is “Prof Cert QA Review.”

    091
  92. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 11th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422836-P1.

    092
  93. Alteration now under review

    The latest status recorded for M01422836-P1 is “Prof Cert QA Review.”

    093
  94. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 9th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422830-P1.

    094
  95. Alteration now under review

    The latest status recorded for M01422830-P1 is “Prof Cert QA Review.”

    095
  96. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 10th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422832-P1.

    096
  97. Alteration now under review

    The latest status recorded for M01422832-P1 is “Prof Cert QA Review.”

    097
  98. Alteration filed

    Minor demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floors as per plans (Verizon - Demo Phase.) No change to use, egress or occupancy. Filing M01422828-P1.

    098
  99. Alteration now under review

    The latest status recorded for M01422828-P1 is “Prof Cert QA Review.”

    099