Building record · BIN 1088786

2150 Broadway

2150 Broadway, Manhattan, NY 10023

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1088786

2150 Broadway

Upper West Side (Central), Manhattan

A consolidated public-record view · updated Sep 9, 2026

DOB filings
3
Active-status
3
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records3
First included filingFeb 10, 2025
Latest recorded changeSep 9, 2026

The lot

What is already here?

The lot holds a 18-story condominium built in 2009, with 68 homes, on a 19,275 sq ft lot.

Built
2009
Last altered
2009
Floors
18
Residential units
68
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C4-6A
Lot area
19,275 sq ft
Building area
272,710 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 101 notices on file; the most recent was issued May 31, 2018.

  • Elevator

    Issued May 31, 2018

  • Construction

    Issued Nov 4, 1999

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 12, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1088786. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 1 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 10, 2025
Latest recorded change
Sep 9, 2026
Highest proposed story count
18 stories
Highest proposed unit count
68 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2150 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Replacement of domestic hot water heaters, circulation pumps, and hot water storage tank, with associated hot water supply, cold water, and natural gas branch piping up to existing valves. all work per plans filed. no change in use, egress, or occupancy. Filing M01166156-S1.

    01
  2. Alteration approved

    Filing M01166156-S1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for M01166156-S1. That is not by itself confirmation of activity on site.

    03
  4. Alteration now approved

    The latest status recorded for M01166156-S1 is “Permit Entire.”

    04
  5. Alteration filed

    Replacement of domestic hot water heaters, circulation pumps, and hot water storage tank, with associated hot water supply, cold water, and natural gas branch piping up to existing valves. all work per plans filed. no change in use, egress, or occupancy. Filing M01166156-P1.

    05
  6. Alteration approved

    Filing M01166156-P1 reached an approved status.

    06
  7. Alteration now approved

    The latest status recorded for M01166156-P1 is “Approved.”

    07
  8. Alteration filed

    Facade inspection. Filing M01436850-I1.

    08
  9. Alteration now under review

    The latest status recorded for M01436850-I1 is “Pending Plan Examiner Assignment.”

    09