The lot
The lot holds a 14-story office building built in 2012, on a 36,003 sq ft lot.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 40 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1089443. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 19 alteration filing. Its latest status categories are 15 approved, 2 under review, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 51 Astor Place.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing work for Robot Barista for Intuit space. Filing M01271119-I1.
Filing M01271119-I1 reached an approved status.
DOB lists a first permit date for M01271119-I1. That is not by itself confirmation of activity on site.
Mechanical upgrades for Intuit on 3rd floor. Filing M01322271-I1.
Filing M01322271-I1 reached an approved status.
DOB lists a first permit date for M01322271-I1. That is not by itself confirmation of activity on site.
Plumbing work for Xantium Investments on 12th floor. Filing M01432057-I1.
Sprinkler work for Xantium Investments on 12th floor. Filing M01432075-I1.
Filing M01432075-I1 reached an approved status.
Filing M01432057-I1 reached an approved status.
Mechanical work for Perceptive Life on 10th floor. Filing M01444221-I1.
Filing M01444221-I1 reached an approved status.
General construction for Perceptive Life on 10th floor. Filing M01443937-I1.
Plumbing work during interior demo and white box construction on 8th floor. Filing M01418366-I1.
Sprinkler work with temp loop during interior demo and white box construction on 8th floor. Filing M01418455-I1.
Mechanical work during interior demo and white box construction on 8th floor. Filing M01418356-I1.
Structural work to include steel to support slab opening and new stair install for Intuit space on 7th floor. Filing M01432169-I1.
General construction for Intuit space on 7th floor. Filing M01432147-I1.
Filing M01418366-I1 reached an approved status.
Filing M01418455-I1 reached an approved status.
DOB lists a first permit date for M01444221-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01444221-I1 is “Permit Entire.”
Filing M01418356-I1 reached an approved status.
The latest status recorded for M01418356-I1 is “Approved.”
Plumbing work for Intuit space on 7th floor. Filing M01432159-I1.
Sprinkler work for Intuit space on 7th floor. Filing M01434076-I1.
Mechanical work for Intuit space on 7th floor. Filing M01432153-I1.
The latest status recorded for M01418366-I1 is “Approved.”
The latest status recorded for M01418455-I1 is “Approved.”
Filing M01432159-I1 reached an approved status.
Filing M01434076-I1 reached an approved status.
Filing M01432169-I1 reached an approved status.
Filing M01432153-I1 reached an approved status.
Filing M01443937-I1 reached an approved status.
Filing M01432147-I1 reached an approved status.
Interior demolition and construction for white box on 8th floor. Filing M01418344-I1.
DOB lists a first permit date for M01443937-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01443937-I1 is “Permit Entire.”
Filing M01418344-I1 reached an approved status.
The latest status recorded for M01418344-I1 is “Approved.”
DOB lists a first permit date for M01432147-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432147-I1 is “Permit Entire.”
DOB lists a first permit date for M01432153-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432153-I1 is “Permit Entire.”
DOB recorded a sign-off for M01271119-I1.
The latest status recorded for M01271119-I1 is “LOC Issued.”
DOB recorded a sign-off for M01322271-I1.
The latest status recorded for M01322271-I1 is “LOC Issued.”
DOB lists a first permit date for M01432169-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432169-I1 is “Permit Entire.”
DOB lists a first permit date for M01432075-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432075-I1 is “Permit Entire.”
DOB lists a first permit date for M01432159-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432159-I1 is “Permit Entire.”
DOB lists a first permit date for M01434076-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01434076-I1 is “Permit Entire.”
DOB lists a first permit date for M01432057-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01432057-I1 is “Permit Entire.”
Mechanical work for retail space for Intuit on 1st floor. Filing M01468332-I1.
Filing M01468332-I1 reached an approved status.
The latest status recorded for M01468332-I1 is “Approved.”
Sprinkler work for retail space for Intuit on 1st floor. Filing M01468343-I1.
Filing M01468343-I1 reached an approved status.
The latest status recorded for M01468343-I1 is “Approved.”
Structural work for retail space for Intuit on 1st floor. Filing M01468889-I1.
The latest status recorded for M01468889-I1 is “Prof Cert QA Review.”
General construction for retail space for Intuit on 1st floor. Filing M01468324-I1.
The latest status recorded for M01468324-I1 is “Prof Cert QA Review.”