Building record · BIN 1090274

50 Hudson Yards

50 Hudson Yards, Manhattan, NY 10001

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 26 independently sourced records, including 14 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1090274

50 Hudson Yards

Chelsea-Hudson Yards, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
26
Active-status
14
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings26
Open or active-status records14
First included filingOct 10, 2025
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 58-story office building built in 2019, on a 69,125 sq ft lot.

  1. Floors 2–58Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as commercial and office, so this floor is where the commercial space is.
  • Street levelCommercial and office
  • Above the southern skylineFrom about floor 129 — the tallest thing within 60 m to the south is 385.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 308.2 m over 58 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2019
Last altered
2018
Floors
58
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C6-4
Lot area
69,125 sq ft
Building area
2,521,850 sq ft

Owner of record

ONE HUDSON YARDS OWNER LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 13, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 34 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 12, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1090274. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 26 alteration filing. Its latest status categories are 1 under review, 13 approved, 12 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Oct 10, 2025
Latest recorded change
Nov 10, 2026
Highest proposed story count
58 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 50 Hudson Yards.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 26 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Modifications to Plumbing and Sprinkler Systems as per plans filed herewith. Filing M01266812-I1.

    01
  2. Alteration filed

    Mechanical modifications taking place on 42nd & 43rd floor construction (62nd & 63rd floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01279021-I1.

    02
  3. Alteration approved

    Filing M01279021-I1 reached an approved status.

    03
  4. Alteration filed

    Modifications to HVAC System as per plans filed herewith for 51st floor (Construction), 71st floor (Marketing). No change in use, egress or occupancy. Filing M01272484-I1.

    04
  5. Alteration filed

    Installation of new plumbing fixtures, Modifications to Sprinkler and Standpipe Systems as per plans filed herewith for 51st floor (Construction), 71st floor (Marketing). No change in use, egress or occupancy. Filing M01295330-I1.

    05
  6. Alteration approved

    Filing M01266812-I1 reached an approved status.

    06
  7. Alteration approved

    Filing M01272484-I1 reached an approved status.

    07
  8. Alteration approved

    Filing M01295330-I1 reached an approved status.

    08
  9. Permit recorded for alteration

    DOB lists a first permit date for M01279021-I1. That is not by itself confirmation of activity on site.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01266812-I1. That is not by itself confirmation of activity on site.

    010
  11. Permit recorded for alteration

    DOB lists a first permit date for M01272484-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01295330-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Mechanical modifications on the 74th floor Marketing (54th floor Construction) as per plans filed herewith. No change of Use, Occupancy, or Egress. Filing M01279134-I1.

    013
  14. Alteration approved

    Filing M01279134-I1 reached an approved status.

    014
  15. Permit recorded for alteration

    DOB lists a first permit date for M01279134-I1. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Plumbing/sprinkler filing as per plans. no change in use, egress or occupancy. Filing M01270491-I1.

    016
  17. Alteration filed

    Filing herewith for interior renovation per plans. no change in use, egress or occupancy,. Filing M01270476-I1.

    017
  18. Alteration filed

    Mechanical filing as per plans. no change in use, egress or occupancy. Filing M01270487-I1.

    018
  19. Alteration approved

    Filing M01270491-I1 reached an approved status.

    019
  20. Alteration approved

    Filing M01270487-I1 reached an approved status.

    020
  21. Alteration approved

    Filing M01270476-I1 reached an approved status.

    021
  22. Alteration filed

    General construction taking place on 40th & 41st floor construction (60th & 61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01292985-I1.

    022
  23. Alteration filed

    Mechanical modifications taking place on 40th & 41st floor construction (60th & 61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy. Filing M01292989-I1.

    023
  24. Alteration approved

    Filing M01292989-I1 reached an approved status.

    024
  25. Alteration approved

    Filing M01292985-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M01292989-I1. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01292985-I1. That is not by itself confirmation of activity on site.

    027
  28. Permit recorded for alteration

    DOB lists a first permit date for M01270491-I1. That is not by itself confirmation of activity on site.

    028
  29. Permit recorded for alteration

    DOB lists a first permit date for M01270476-I1. That is not by itself confirmation of activity on site.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M01270487-I1. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Mechanical modifications as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with DOB Now jobs M01315064 & M01315081. Filing M01315067-I1.

    031
  32. Alteration approved

    Filing M01315067-I1 reached an approved status.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01315067-I1. That is not by itself confirmation of activity on site.

    033
  34. Alteration filed

    Mechanical modifications taking place on 14th & 15th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01396208-S1.

    034
  35. Alteration approved

    Filing M01396208-S1 reached an approved status.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M01396208-S1. That is not by itself confirmation of activity on site.

    036
  37. Alteration filed

    Interior modifications as per plans filed herewith for 47th floor (Construction), 67th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with M01439068-I1 (MS). Filing M01430494-I1.

    037
  38. Alteration filed

    Mechanical modifications as per plans filed herewith for 47th floor (Construction), 67th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with M01430494-I1 (GC). Filing M01439068-I1.

    038
  39. Alteration approved

    Filing M01430494-I1 reached an approved status.

    039
  40. Alteration approved

    Filing M01439068-I1 reached an approved status.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for M01439068-I1. That is not by itself confirmation of activity on site.

    041
  42. Permit recorded for alteration

    DOB lists a first permit date for M01430494-I1. That is not by itself confirmation of activity on site.

    042
  43. Alteration signed off

    DOB recorded a sign-off for M01270487-I1.

    043
  44. Alteration now completed

    The latest status recorded for M01270487-I1 is “LOC Issued.”

    044
  45. Alteration signed off

    DOB recorded a sign-off for M01292985-I1.

    045
  46. Alteration now completed

    The latest status recorded for M01292985-I1 is “LOC Issued.”

    046
  47. Alteration filed

    Interior modifications as per plans filed herewith for 47th floor (Construction), 67th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with M01439068-I1 (MS). Filing M01430494-P1.

    047
  48. Alteration filed

    Mechanical modifications as per plans filed herewith for 47th floor (Construction), 67th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with M01430494-I1 (GC). Filing M01439068-P1.

    048
  49. Alteration signed off

    DOB recorded a sign-off for M01270476-I1.

    049
  50. Alteration now completed

    The latest status recorded for M01270476-I1 is “LOC Issued.”

    050
  51. Alteration signed off

    DOB recorded a sign-off for M01279134-I1.

    051
  52. Alteration now completed

    The latest status recorded for M01279134-I1 is “LOC Issued.”

    052
  53. Alteration signed off

    DOB recorded a sign-off for M01266812-I1.

    053
  54. Alteration now completed

    The latest status recorded for M01266812-I1 is “LOC Issued.”

    054
  55. Alteration approved

    Filing M01430494-P1 reached an approved status.

    055
  56. Alteration now approved

    The latest status recorded for M01430494-P1 is “Approved.”

    056
  57. Alteration approved

    Filing M01439068-P1 reached an approved status.

    057
  58. Alteration now approved

    The latest status recorded for M01439068-P1 is “Approved.”

    058
  59. Alteration now approved

    The latest status recorded for M01439068-I1 is “Permit Entire.”

    059
  60. Alteration now approved

    The latest status recorded for M01430494-I1 is “Permit Entire.”

    060
  61. Alteration filed

    General construction taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01402587-I1.

    061
  62. Alteration filed

    Sprinkler modifications taking place on 14th & 15th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01396237-S3.

    062
  63. Alteration filed

    Sprinkler modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01402587-S4.

    063
  64. Alteration approved

    Filing M01402587-S4 reached an approved status.

    064
  65. Alteration filed

    Structural modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01402587-S1.

    065
  66. Alteration filed

    General construction taking place on 14th & 15th floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01396237-I1.

    066
  67. Alteration filed

    Plumbing modifications taking place on 2nd fl as per plans filed herewith. no change in use, egress, or occupancy. Filing M01402587-S3.

    067
  68. Alteration filed

    Plumbing modifications taking place on 14th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01396237-S2.

    068
  69. Alteration filed

    Mechanical modifications taking place on 14th & 15th floors as per plans filed herewith. no change in use, egress or occupancy. Filing M01396237-S1.

    069
  70. Alteration approved

    Filing M01402587-I1 reached an approved status.

    070
  71. Alteration filed

    Mechanical modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01402587-S2.

    071
  72. Alteration approved

    Filing M01402587-S2 reached an approved status.

    072
  73. Alteration approved

    Filing M01396237-S3 reached an approved status.

    073
  74. Alteration approved

    Filing M01396237-S2 reached an approved status.

    074
  75. Alteration approved

    Filing M01396237-S1 reached an approved status.

    075
  76. Permit recorded for alteration

    DOB lists a first permit date for M01396237-S3. That is not by itself confirmation of activity on site.

    076
  77. Alteration signed off

    DOB recorded a sign-off for M01270491-I1.

    077
  78. Alteration now completed

    The latest status recorded for M01270491-I1 is “LOC Issued.”

    078
  79. Alteration approved

    Filing M01396237-I1 reached an approved status.

    079
  80. Permit recorded for alteration

    DOB lists a first permit date for M01396237-I1. That is not by itself confirmation of activity on site.

    080
  81. Alteration now approved

    The latest status recorded for M01396237-I1 is “Permit Entire.”

    081
  82. Alteration approved

    Filing M01402587-S3 reached an approved status.

    082
  83. Permit recorded for alteration

    DOB lists a first permit date for M01402587-S3. That is not by itself confirmation of activity on site.

    083
  84. Alteration now approved

    The latest status recorded for M01402587-S3 is “Permit Entire.”

    084
  85. Permit recorded for alteration

    DOB lists a first permit date for M01396237-S2. That is not by itself confirmation of activity on site.

    085
  86. Alteration now approved

    The latest status recorded for M01396237-S2 is “Permit Entire.”

    086
  87. Permit recorded for alteration

    DOB lists a first permit date for M01396237-S1. That is not by itself confirmation of activity on site.

    087
  88. Alteration now approved

    The latest status recorded for M01396237-S1 is “Permit Entire.”

    088
  89. Permit recorded for alteration

    DOB lists a first permit date for M01402587-I1. That is not by itself confirmation of activity on site.

    089
  90. Alteration now approved

    The latest status recorded for M01402587-I1 is “Permit Entire.”

    090
  91. Permit recorded for alteration

    DOB lists a first permit date for M01402587-S2. That is not by itself confirmation of activity on site.

    091
  92. Alteration now approved

    The latest status recorded for M01402587-S2 is “Permit Entire.”

    092
  93. Alteration approved

    Filing M01402587-S1 reached an approved status.

    093
  94. Permit recorded for alteration

    DOB lists a first permit date for M01402587-S1. That is not by itself confirmation of activity on site.

    094
  95. Alteration now approved

    The latest status recorded for M01402587-S1 is “Permit Entire.”

    095
  96. Alteration filed

    Plumbing/sprinkler/standpipe filing as per plans. no change in use, egress or occupancy. Filing M01358473-P1.

    096
  97. Alteration signed off

    DOB recorded a sign-off for M01272484-I1.

    097
  98. Alteration now completed

    The latest status recorded for M01272484-I1 is “LOC Issued.”

    098
  99. Alteration signed off

    DOB recorded a sign-off for M01295330-I1.

    099
  100. Alteration now completed

    The latest status recorded for M01295330-I1 is “LOC Issued.”

    0100
  101. Alteration signed off

    DOB recorded a sign-off for M01315067-I1.

    0101
  102. Alteration now completed

    The latest status recorded for M01315067-I1 is “LOC Issued.”

    0102
  103. Alteration signed off

    DOB recorded a sign-off for M01279021-I1.

    0103
  104. Alteration now completed

    The latest status recorded for M01279021-I1 is “LOC Issued.”

    0104
  105. Alteration signed off

    DOB recorded a sign-off for M01292989-I1.

    0105
  106. Alteration now completed

    The latest status recorded for M01292989-I1 is “LOC Issued.”

    0106
  107. Alteration signed off

    DOB recorded a sign-off for M01396208-S1.

    0107
  108. Alteration now completed

    The latest status recorded for M01396208-S1 is “LOC Issued.”

    0108
  109. Alteration now approved

    The latest status recorded for M01396237-S3 is “Permit Entire.”

    0109
  110. Permit recorded for alteration

    DOB lists a first permit date for M01402587-S4. That is not by itself confirmation of activity on site.

    0110
  111. Alteration now approved

    The latest status recorded for M01402587-S4 is “Permit Entire.”

    0111
  112. Alteration now under review

    The latest status recorded for M01358473-P1 is “Prof Cert QA Review.”

    0112