DOB filing M01461146-I1
Alteration filing at 89 South Street
Building record · BIN 1090548
89 South Street, Manhattan, NY 10038
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 19 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1090548
89 South Street
Financial District-Battery Park City, Manhattan
A consolidated public-record view · updated Sep 23, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 4-story store building built in 2015, on a 208,475 sq ft lot.
Owner of record
NYC DSBS
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 3 open notices on record for this building, out of 158 notices on file; the most recent was issued Sep 15, 2017.
Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
Issued Sep 15, 2017 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
Issued Feb 4, 2013
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1090548. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 19 alteration filing. Its latest status categories are 13 approved, 1 closed or withdrawn, 5 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 89 South Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 19 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical work taking place on floors 2-4 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01238478-I1.
Filing M01238478-I1 reached an approved status.
Mechanical work taking place on the 1st and 2nd floors as per plans filed herewith, including installation of commerical kitchen exhaust hood. no change in use, egress, or occupancy. Filing M01347158-I1.
Sprinkler work taking place on the 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01347174-I1.
Plumbing work taking place on the 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01347168-I1.
Filing M01347174-I1 reached an approved status.
DOB lists a first permit date for M01347174-I1. That is not by itself confirmation of activity on site.
Filing M01347158-I1 reached an approved status.
Filing M01347168-I1 reached an approved status.
DOB lists a first permit date for M01347158-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01347168-I1. That is not by itself confirmation of activity on site.
Structural work taking place on floors 1-4 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01238489-I1.
General construction taking place on floors 1-4 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01238473-I1.
Filing M01238489-I1 reached an approved status.
Filing M01238473-I1 reached an approved status.
The latest status recorded for M01347168-I1 is “Permit Entire.”
The latest status recorded for M01238478-I1 is “Approved.”
General construction taking place on floors 1-4 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01238473-P1.
Structural work taking place on floors 1-4 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01238489-P1.
Filing M01238489-P1 reached an approved status.
The latest status recorded for M01238489-P1 is “Approved.”
Filing M01238473-P1 reached an approved status.
The latest status recorded for M01238473-P1 is “Approved.”
Plumbing demolition on 4th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01413591-I1.
Mechanical demolition on 4th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01413581-I1.
Temporary Installations to be used on a temporary "House Fest New York". all the Installations are to be removed upon completion of the event. Filing M01461146-I1.
Sprinkler work taking place on the 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy. Filing M01347174-P1.
General construction taking place on floors 1 and 2 as per plans filed herewith. no change in use, egress, or occupancy. Filing M01347150-P1.
Mechanical work taking place on the 1st and 2nd floors as per plans filed herewith, including installation of commerical kitchen exhaust hood. no change in use, egress, or occupancy. Filing M01347158-P1.
Filing M01413591-I1 reached an approved status.
The latest status recorded for M01413591-I1 is “Approved.”
Filing M01413581-I1 reached an approved status.
The latest status recorded for M01413581-I1 is “Approved.”
DOB lists a first permit date for M01238489-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01238489-I1 is “Permit Entire.”
DOB lists a first permit date for M01238473-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01238473-I1 is “Permit Entire.”
Filing M01461146-I1 reached an approved status.
The latest status recorded for M01461146-I1 is “Approved.”
Filing M01347174-P1 reached an approved status.
The latest status recorded for M01347174-P1 is “Approved.”
The latest status recorded for M01347150-P1 is “QA Failed.”
Filing M01347158-P1 reached an approved status.
The latest status recorded for M01347158-P1 is “Approved.”
Demolition taking place on the 4th floor per plans filed herewith. no change in use, egress, or occupancy. Filing M01413579-I1.
The latest status recorded for M01413579-I1 is “Prof Cert QA Review.”
Mechanical work on 4th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01395072-P1.
The latest status recorded for M01395072-P1 is “Pending Prof Cert QA Assignment.”
Plumbing work on 4th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01395727-P1.
The latest status recorded for M01395727-P1 is “Pending Prof Cert QA Assignment.”
Sprinkler work on 4th floor as per plans filed herewith. no change in use, egress, or occupancy. Filing M01395729-P1.
The latest status recorded for M01395729-P1 is “Pending Prof Cert QA Assignment.”
General construction taking place on the 4th floor per plans filed herewith. no change in use, egress, or occupancy. Filing M01395038-P1.
The latest status recorded for M01395038-P1 is “Pending Prof Cert QA Assignment.”
The latest status recorded for M01347158-I1 is “Permit Entire.”
The latest status recorded for M01347174-I1 is “Permit Entire.”