DOB filing M00917098-S1
Alteration filing at 270 Park Avenue
Building record · BIN 1091010
270 Park Avenue, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 30 independently sourced records, including 18 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1091010
270 Park Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 29, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 60-story office building built in 2021, on a 80,333 sq ft lot.
What it sold for
1 apartment on this tax block changed hands in the year the city last published, at a median of $23,100.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
EPSTEIN FAMILY HOLDINGS LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 230 notices on file; the most recent was issued Feb 22, 2024.
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Issued Jan 10, 2006
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091010. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 30 alteration filing. Its latest status categories are 9 approved, 9 under review, 12 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 270 Park Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 30 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of heavy duty sidewalk shed for nb construction, filed sep under app # 121205604. sidewalk shed shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this application. dot permit by others for shed on roadway. Filing M00468177-I1.
DOB lists a first permit date for M00468177-I1. That is not by itself confirmation of activity on site.
Installation of temporary loading dock as per drawings. temporary loading dock shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00582293-I1.
DOB lists a first permit date for M00582293-I1. That is not by itself confirmation of activity on site.
Installation of fuel oil storage tanks serving new emergency generator filing in conjunction to new building 121205604. fuel oil storage tanks are located on sub cellar#2. Filing M00389334-I1.
48th st hoist cars 13&14: installation of dual 10250# capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator appl submitted sep. Filing M00649297-I1.
48th st hoist cars 11&12: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator appl submitted sep. Filing M00649288-I1.
48th st hoist cars 9&10: installation of dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator appl submitted sep. Filing M00649279-I1.
48th st hoist cars 7&8: installation of dual 7500 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator appl submitted sep. Filing M00649258-I1.
DOB lists a first permit date for M00649297-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00649288-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00649279-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00649258-I1. That is not by itself confirmation of activity on site.
Construction fence as per drawings. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway. Filing M00658504-I1.
DOB lists a first permit date for M00658504-I1. That is not by itself confirmation of activity on site.
Filing M00389334-I1 reached an approved status.
Installation of temporary overhead protection during nb const, filed sep. overhead protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M00685878-I1.
DOB lists a first permit date for M00685878-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00389334-I1. That is not by itself confirmation of activity on site.
The mh scope of work extends existing core and shell outside airductwork, chilled water piping, hot water piping and cold condensate piping to new terminal units for space ventilation and conditioning of office and meeting spaces. Filing M00832051-I1.
As per hub consultation in conjunction with nb #121205604 the work is to extends existing core and shell outside airductwork, chilled and hot water piping, cold condensate piping to new terminal units for space ventilation and conditioning of office and m. Filing M00832059-I1.
Filing M00832051-I1 reached an approved status.
Cars 7, 8, 9, 10, 11, 12, 13 & 14: temporary hoist run-back structure during nb const, filed sep. hoist run-back structure shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this appl. hoist & elevator appl. submitted sep. Filing M00884964-I1.
DOB lists a first permit date for M00884964-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00832051-I1. That is not by itself confirmation of activity on site.
As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00896327-I1.
To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00859088-S1.
To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans filed herewith. Filing M00859079-S3.
To be assigned to Development HUB; filed in conjunction to NB 121205604. Modification to existing Sprinkler system and Standpipe system as per plans filed herewith. Filing M00859088-S3.
Filing M00859088-S1 reached an approved status.
Filing M00896327-I1 reached an approved status.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00832074-I1.
Filing M00832059-I1 reached an approved status.
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00919526-S2.
As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00919526-S3.
Filing M00859079-S3 reached an approved status.
Filing M00859088-S3 reached an approved status.
DOB lists a first permit date for M00896327-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00832059-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00859088-S1. That is not by itself confirmation of activity on site.
Filing M00832074-I1 reached an approved status.
DOB lists a first permit date for M00832074-I1. That is not by itself confirmation of activity on site.
As per HUB Consultation filed in conjunction with NB #121205604 for Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00891685-S3.
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude:ductwork and distribution. Filing M00896441-S1.
Filing M00919526-S3 reached an approved status.
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution. Filing M00917098-S1.
Filing M00919526-S2 reached an approved status.
DOB lists a first permit date for M00859079-S3. That is not by itself confirmation of activity on site.
As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00947158-I1.
DOB lists a first permit date for M00859088-S3. That is not by itself confirmation of activity on site.
Filing M00891685-S3 reached an approved status.
Filing M00896441-S1 reached an approved status.
DOB lists a first permit date for M00891685-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00896441-S1. That is not by itself confirmation of activity on site.
Filing M00917098-S1 reached an approved status.
DOB lists a first permit date for M00917098-S1. That is not by itself confirmation of activity on site.
As per HUB Consultation filed in conjunction to NB 121205604. Modification to existing Standpipe system as per plans filed herewith. Filing M00859860-S5.
Filing M00859860-S5 reached an approved status.
DOB lists a first permit date for M00919526-S3. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00919526-S2. That is not by itself confirmation of activity on site.
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00947158-S2.
As per hub consultation filed in conjunction with nb #121205604 for the mechanical scope of work submitted under this application entails interior fitout work for office space.the systeminclude: ductwork and distribution. Filing M00947158-S1.
Filing M00947158-S2 reached an approved status.
DOB lists a first permit date for M00859860-S5. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00947158-S2. That is not by itself confirmation of activity on site.
Filing M00947158-S1 reached an approved status.
DOB lists a first permit date for M00947158-S1. That is not by itself confirmation of activity on site.
Filing M00947158-I1 reached an approved status.
DOB lists a first permit date for M00947158-I1. That is not by itself confirmation of activity on site.
As per HUB Consultation filed in conjunction to NB 121205604. Modification to existing SD system (Scope of work submitted under this application extends existing core and shell wet SP scope to support new fit-out wet SP scope) as per plans filed herewith. Filing M00947158-S5.
As per HUB Consultation filed in conjunction with NB #121205604 for Modification to Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01050073-S6.
Filing M00947158-S5 reached an approved status.
DOB lists a first permit date for M00947158-S5. That is not by itself confirmation of activity on site.
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01050073-S2.
Filing M01050073-S6 reached an approved status.
DOB lists a first permit date for M01050073-S6. That is not by itself confirmation of activity on site.
Filing M01050073-S2 reached an approved status.
DOB lists a first permit date for M01050073-S2. That is not by itself confirmation of activity on site.
As per HUB CONSULTATION filed in conjunction with NB #121205604 for installation of interior nonbearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M00947158-P6.
DOB recorded a sign-off for M00919526-S2.
The latest status recorded for M00919526-S2 is “LOC Issued.”
The latest status recorded for M00947158-S2 is “On Hold - Pending Supersede of Progress Inspector.”
DOB recorded a sign-off for M00919526-S3.
The latest status recorded for M00919526-S3 is “LOC Issued.”
DOB recorded a sign-off for M01050073-S6.
The latest status recorded for M01050073-S6 is “LOC Issued.”
DOB recorded a sign-off for M00891685-S3.
The latest status recorded for M00891685-S3 is “LOC Issued.”
DOB recorded a sign-off for M00859860-S5.
The latest status recorded for M00859860-S5 is “LOC Issued.”
The latest status recorded for M00389334-I1 is “On Hold - Pending Supersede of Special Inspector.”
DOB recorded a sign-off for M01050073-S2.
The latest status recorded for M01050073-S2 is “LOC Issued.”
Filing M00947158-P6 reached an approved status.
The latest status recorded for M00947158-P6 is “Approved.”
The latest status recorded for M00947158-I1 is “Permit Entire.”
DOB recorded a sign-off for M00859079-S3.
The latest status recorded for M00859079-S3 is “LOC Issued.”
DOB recorded a sign-off for M00859088-S3.
The latest status recorded for M00859088-S3 is “LOC Issued.”
The latest status recorded for M00884964-I1 is “Permit Entire.”
The latest status recorded for M00582293-I1 is “Permit Entire.”
The latest status recorded for M00649258-I1 is “Permit Entire.”
The latest status recorded for M00658504-I1 is “Permit Entire.”
The latest status recorded for M00859088-S1 is “On Hold - Pending Supersede of Progress Inspector.”
The latest status recorded for M00468177-I1 is “Permit Entire.”
DOB recorded a sign-off for M00685878-I1.
The latest status recorded for M00685878-I1 is “LOC Issued.”
DOB recorded a sign-off for M00649297-I1.
The latest status recorded for M00649297-I1 is “LOC Issued.”
DOB recorded a sign-off for M00649288-I1.
The latest status recorded for M00649288-I1 is “LOC Issued.”
DOB recorded a sign-off for M00649279-I1.
The latest status recorded for M00649279-I1 is “LOC Issued.”
The latest status recorded for M00832051-I1 is “Permit Entire.”
The latest status recorded for M00896441-S1 is “On Hold - Pending Supersede of Special Inspector.”
The latest status recorded for M00832074-I1 is “On Hold - Pending Supersede of Progress Inspector.”
The latest status recorded for M00896327-I1 is “On Hold - Pending Supersede of Special Inspector.”
The latest status recorded for M00947158-S5 is “On Hold - Pending Supersede of Special Inspector.”
The latest status recorded for M00832059-I1 is “On Hold - Pending Supersede of Progress Inspector.”
The latest status recorded for M00917098-S1 is “Permit Entire.”
The latest status recorded for M00947158-S1 is “On Hold - Pending Supersede of Progress Inspector.”