DOB filing M01425082-S3
Alteration filing at 125 West 57 Street
Building record · BIN 1091067
125 West 57 Street, Manhattan, NY 10019
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1091067
125 West 57 Street
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 21, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The apartments
724 condominium apartments are assessed on this block, and the typical one is 1,985 sq ft (184 m²). They run from 52 to 1259 m².
The city values the typical one at $784,803. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
32 apartments on this tax block changed hands in the year the city last published, at a median of $2,350,000, from 740,000 to 41,750,076.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
WEST 58TH STREET REALTY, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Violation record
No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091067. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 8 alteration filing. Its latest status categories are 6 approved, 2 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 125 West 57 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of temporary material hoist system as per plans during general construction work. no change in use, egress or occupancy. material hoist shall comply with chapter 33 of NYC building code of 2022. Filing M01299700-I1.
DOB lists a first permit date for M01299700-I1. That is not by itself confirmation of activity on site.
Mechanical work in 6th floor mechanical room. Filing M01355015-I1.
DOB lists a first permit date for M01355015-I1. That is not by itself confirmation of activity on site.
Plumbing work filed in conjunction with M01371067-I1. Filing M01371067-S1.
Filing M01371067-S1 reached an approved status.
DOB lists a first permit date for M01371067-S1. That is not by itself confirmation of activity on site.
Relocating and adding new sprinkler heads where noted. Filing M01425082-S3.
New vent and sanitary domestic water systems where noted on the drawings. Filing M01425082-S2.
New Branches and ductwork throughout the space. Filing M01425082-S1.
Office interior fit-out for both the 25th and 26th floors (29th & 30th floor marketing). Filing M01425082-I1.
DOB recorded a sign-off for M01299700-I1.
The latest status recorded for M01299700-I1 is “LOC Issued.”
Filing M01425082-S3 reached an approved status.
Filing M01425082-S2 reached an approved status.
Filing M01425082-S1 reached an approved status.
Filing M01425082-I1 reached an approved status.
DOB lists a first permit date for M01425082-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425082-I1 is “Permit Entire.”
DOB recorded a sign-off for M01355015-I1.
The latest status recorded for M01355015-I1 is “LOC Issued.”
DOB lists a first permit date for M01425082-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01425082-S1 is “Permit Entire.”
Plumbing work filed in conjunction with M01371067-I1. Filing M01371067-P1.
Filing M01371067-P1 reached an approved status.
The latest status recorded for M01371067-P1 is “Approved.”
The latest status recorded for M01371067-S1 is “Permit Entire.”
DOB lists a first permit date for M01425082-S3. That is not by itself confirmation of activity on site.
The latest status recorded for M01425082-S3 is “Permit Entire.”
DOB lists a first permit date for M01425082-S2. That is not by itself confirmation of activity on site.
The latest status recorded for M01425082-S2 is “Permit Entire.”