DOB filing M01392083-P1
Alteration filing at 740 8 Avenue
Building record · BIN 1091777
740 8 Avenue, Manhattan, NY 10036
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 10 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1091777
740 8 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 28, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a hotel built in 2023, on a 33,080 sq ft lot.
Owner of record
45TH OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 17 notices on file; the most recent was issued Dec 13, 2011.
Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Issued Oct 14, 1999
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 30, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091777. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 9 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 740 8 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Structural work in conjunction with the construction of new building #121208326. Filing M00346335-I1.
Filing M00346335-I1 reached an approved status.
DOB lists a first permit date for M00346335-I1. That is not by itself confirmation of activity on site.
Installation and use of temporary cocoon system as per plans filed herewith. no change in use, egress, or occupancy. Filing M01218848-I1.
Installation and use of temporary concrete placing boom as per plans filed herewith. No change in use, egress, or occupancy. Filing M01253760-I1.
DOB lists a first permit date for M01253760-I1. That is not by itself confirmation of activity on site.
Filing M01218848-I1 reached an approved status.
DOB lists a first permit date for M01218848-I1. That is not by itself confirmation of activity on site.
Installation of temporary north p/m hoist complex h1-h2-h3-h4 as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist to comply with chapter 33 of NYC building code of 2022. Filing M01296073-I1.
DOB lists a first permit date for M01296073-I1. That is not by itself confirmation of activity on site.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. Filing M01344049-I1.
DOB lists a first permit date for M01344049-I1. That is not by itself confirmation of activity on site.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. Filing M01392083-I1.
DOB lists a first permit date for M01392083-I1. That is not by itself confirmation of activity on site.
Installation and use of temporary cantilever a-frame as per plans filed herewith. no change in use, egress, or occupancy. Filing M00346335-S1.
The latest status recorded for M00346335-I1 is “Permit Entire.”
The latest status recorded for M01253760-I1 is “Permit Entire.”
The latest status recorded for M00346335-S1 is “Objections.”
The latest status recorded for M01218848-I1 is “Permit Entire.”
Installation of temporary scaffold access stair towers as per plans in conjunction with nb construction. no change in use, egress or occupancy. scaffold stair towers shall comply with chapter 33 of NYC building code of 2022. Filing M01461575-I1.
DOB lists a first permit date for M01461575-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01461575-I1 is “Permit Entire.”
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. Filing M01392083-P1.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. Filing M01344049-P5.
The latest status recorded for M01296073-I1 is “Permit Entire.”
Filing M01392083-P1 reached an approved status.
The latest status recorded for M01392083-P1 is “Approved.”
Filing M01344049-P5 reached an approved status.
The latest status recorded for M01344049-P5 is “Approved.”
The latest status recorded for M01392083-I1 is “Permit Entire.”
The latest status recorded for M01344049-I1 is “Permit Entire.”