Building record · BIN 1091798

175 East 82 Street

175 East 82 Street, Manhattan, NY 10028

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1091798

175 East 82 Street

Upper East Side-Carnegie Hill, Manhattan

A consolidated public-record view · updated Nov 10, 2026

DOB filings
8
Active-status
8
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records8
First included filingSep 13, 2024
Latest recorded changeNov 10, 2026

The lot

What is already here?

The lot holds a 38-story elevator apartment building built in 2024, with 72 homes, on a 10,922 sq ft lot.

  1. Floors 31–38Above the southern skylineAbove the tallest building within sixty metres to the south, which stands 92.2 m. Nothing on that side reaches this floor.
  2. Floors 2–30Homes72 homes are recorded on this lot — about 2 homes to a floor, and the apartments assessed on this block run to a typical 1,140 sq ft (106 m²). The city does not publish which floor any of them is on.
  3. Floor 1Street levelStreet level. The lot is recorded as mixed residential and commercial, so this floor is where the commercial space is.
  • Street levelMixed residential and commercial
  • Homes72 recorded · typically 106 m² · valued $372,395
  • Above the southern skylineFrom about floor 31 — the tallest thing within 60 m to the south is 92.2 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 26.6 m over 38 floors, as the city counts them. 3 runs of floors have something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
2024
Last altered
2022
Floors
38
Residential units
72
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C1-9
Lot area
10,922 sq ft
Building area
250,405 sq ft

The apartments

80 condominium apartments are assessed on this block, and the typical one is 1,140 sq ft (106 m²). They run from 60 to 162 m².

The city values the typical one at $372,395. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

22 apartments on this tax block changed hands in the year the city last published, at a median of $1,550,000, from 405,600 to 3,900,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

969 PARK CORP

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 12, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 10, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091798. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 8 alteration filing. Its latest status categories are 8 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 13, 2024
Latest recorded change
Nov 10, 2026
Highest proposed story count
Not stated
Highest proposed unit count
90 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 175 East 82 Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of new plumbing system: Install new plumbing fixtures and associated piping on the Cellar, 1-38th Floor & Roof (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, RF1 (Marketing Floors) as per plans. Filing M01029556-I1.

    01
  2. Alteration approved

    Filing M01029556-I1 reached an approved status.

    02
  3. Alteration filed

    Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans. Filing M01030152-I1.

    03
  4. Alteration filed

    Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed is at e 82nd street and 3rd avenue elevations. the sidewalk shed at 2nd floor roof, at 170 e 83rd street and balcony of 167 e 82 street. Filing M01119945-I1.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for M01119945-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration approved

    Filing M01030152-I1 reached an approved status.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01030152-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01029556-I1. That is not by itself confirmation of activity on site.

    08
  9. Alteration filed

    Installation of supported scaffolding in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M01164754-I1.

    09
  10. Permit recorded for alteration

    DOB lists a first permit date for M01164754-I1. That is not by itself confirmation of activity on site.

    010
  11. Alteration filed

    Installation of multi-point in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M01189728-I1.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01189728-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Installation of 2-pt scaffold in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M01292910-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01292910-I1. That is not by itself confirmation of activity on site.

    014
  15. Alteration filed

    Filing for installation of temporary toilet fixtures as per plans filed herewith. No change in use, egress or occupancy in this application. Filing M01299243-S1.

    015
  16. Alteration approved

    Filing M01299243-S1 reached an approved status.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for M01299243-S1. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Installation of new sprinkler and standpipe systems on Cellar, 1-38th Floor (CO)/ Cellar, 1, 3-21, M1, Club1, Club2, 26-35, PH1, PH2A, PH2B, M2, M3, M4, (Marketing Floors) as per plans. Filing M01030152-P1.

    018
  19. Alteration now approved

    The latest status recorded for M01299243-S1 is “Permit Entire.”

    019
  20. Alteration now approved

    The latest status recorded for M01029556-I1 is “Permit Entire.”

    020
  21. Alteration approved

    Filing M01030152-P1 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for M01030152-P1 is “Approved.”

    022
  23. Alteration now approved

    The latest status recorded for M01189728-I1 is “Permit Entire.”

    023
  24. Alteration now approved

    The latest status recorded for M01292910-I1 is “Permit Entire.”

    024
  25. Alteration now approved

    The latest status recorded for M01164754-I1 is “Permit Entire.”

    025
  26. Alteration now approved

    The latest status recorded for M01030152-I1 is “Permit Entire.”

    026
  27. Alteration now approved

    The latest status recorded for M01119945-I1 is “Permit Entire.”

    027