Building record · BIN 1091844

1710 Broadway

1710 Broadway, Manhattan, NY 10019

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1091844

1710 Broadway

Midtown-Times Square, Manhattan

A consolidated public-record view · updated Oct 20, 2026

DOB filings
12
Active-status
12
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records12
First included filingSep 20, 2024
Latest recorded changeOct 20, 2026

The lot

What is already here?

The lot holds a 55-story hotel built in 2025, on a 8,848 sq ft lot.

Built
2025
Last altered
2021
Floors
55
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C6-7
Lot area
8,848 sq ft
Building area
545,251 sq ft

What it sold for

1 apartment on this tax block changed hands in the year the city last published, at a median of $560,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

CHAI OWNER LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 58 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091844. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 9 alteration filing, 3 new building. Its latest status categories are 11 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Sep 20, 2024
Latest recorded change
Oct 20, 2026
Highest proposed story count
55 stories
Highest proposed unit count
686 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1710 Broadway.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary equipment shall comply with chapter 33 of NYC building code of 2022. Filing M01112269-I1.

    01
  2. Permit recorded for alteration

    DOB lists a first permit date for M01112269-I1. That is not by itself confirmation of activity on site.

    02
  3. New building filed

    Superstructure construction for a new building as indicated on the attached drawings. Filing M00903689-Z2.

    03
  4. New building approved

    Filing M00903689-Z2 reached an approved status.

    04
  5. Alteration filed

    Installation of 7,100 lb dual personnel hoist cars @ west as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01227575-I1.

    05
  6. Alteration filed

    Installation of 7,000 lb dual personnel hoist cars @ east as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01227574-I1.

    06
  7. Permit recorded for alteration

    DOB lists a first permit date for M01227575-I1. That is not by itself confirmation of activity on site.

    07
  8. Permit recorded for alteration

    DOB lists a first permit date for M01227574-I1. That is not by itself confirmation of activity on site.

    08
  9. Permit recorded for new building

    DOB lists a first permit date for M00903689-Z2. That is not by itself confirmation of activity on site.

    09
  10. Alteration filed

    Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor. Filing M01296818-I1.

    010
  11. Alteration approved

    Filing M01296818-I1 reached an approved status.

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for M01296818-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration filed

    Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01413555-I1.

    013
  14. Permit recorded for alteration

    DOB lists a first permit date for M01413555-I1. That is not by itself confirmation of activity on site.

    014
  15. New building filed

    Construction of new building. application #m00486337-i1 refiled to comply with bc 2022. kindly request review from development hub. Filing M00903689-A5.

    015
  16. New building filed

    Superstructure construction for a new building as indicated on the attached drawings. Filing M00903689-B1.

    016
  17. Alteration filed

    Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 8th floor through the 57th floor. Filing M01296818-P1.

    017
  18. Alteration filed

    Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01413555-P2.

    018
  19. Alteration now approved

    The latest status recorded for M01112269-I1 is “Permit Entire.”

    019
  20. New building now under review

    The latest status recorded for M00903689-A5 is “Objections.”

    020
  21. Alteration approved

    Filing M01413555-P2 reached an approved status.

    021
  22. Alteration now approved

    The latest status recorded for M01413555-P2 is “Approved.”

    022
  23. Alteration now approved

    The latest status recorded for M01413555-I1 is “Permit Entire.”

    023
  24. Alteration approved

    Filing M01296818-P1 reached an approved status.

    024
  25. Alteration now approved

    The latest status recorded for M01296818-P1 is “Approved.”

    025
  26. Alteration now approved

    The latest status recorded for M01296818-I1 is “Permit Entire.”

    026
  27. New building approved

    Filing M00903689-B1 reached an approved status.

    027
  28. New building now approved

    The latest status recorded for M00903689-B1 is “Approved.”

    028
  29. New building now approved

    The latest status recorded for M00903689-Z2 is “Permit Entire.”

    029
  30. Alteration filed

    Installation of 7,000 lb dual personnel hoist cars @ east as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01227574-P2.

    030
  31. Alteration approved

    Filing M01227574-P2 reached an approved status.

    031
  32. Alteration now approved

    The latest status recorded for M01227574-P2 is “Approved.”

    032
  33. Alteration now approved

    The latest status recorded for M01227574-I1 is “Permit Entire.”

    033
  34. Alteration filed

    Installation of 7,100 lb dual personnel hoist cars @ west as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01227575-P2.

    034
  35. Alteration approved

    Filing M01227575-P2 reached an approved status.

    035
  36. Alteration now approved

    The latest status recorded for M01227575-P2 is “Approved.”

    036
  37. Alteration now approved

    The latest status recorded for M01227575-I1 is “Permit Entire.”

    037