DOB filing M00686062-I1
Alteration filing at 520 5 Avenue
Building record · BIN 1091887
520 5 Avenue, Manhattan, NY 10036
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 10 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1091887
520 5 Avenue
Midtown-Times Square, Manhattan
A consolidated public-record view · updated Sep 22, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 71-story condominium built in 2024, with 100 homes, on a 10,625 sq ft lot.
The apartments
200 condominium apartments are assessed on this block, and the typical one is 1,255 sq ft (117 m²). They run from 69 to 307 m².
The city values the typical one at $596,288. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
96 apartments on this tax block changed hands in the year the city last published, at a median of $3,375,000, from 1,670,000 to 12,500,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
HIPPODROME LAND COMPANY, LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
2 homes at this address are currently listed — 1 for sale and 1 to rent by Douglas Elliman and Coldwell Banker. Prices move; the brokerage’s own page is the one that is current, and every row here links to it.
| Unit | Rooms | Size | Price | Per sq ft | Listed by |
|---|---|---|---|---|---|
| Unit 55ATo rent | 2 bd · 2 ba | 1,278 sq ft119 m² | $16,000a month | $13 | Douglas Elliman |
| Unit 57CFor sale | Price not read | Coldwell Banker |
Read from the brokerages’ own published listings on October 2, 2026. A home drops off this table the next time they publish a list without it — usually because it sold or let, though a listing can also expire or be withdrawn. What we know is that it is no longer offered, which is why this shows what they have today rather than what we were told once. Everything on the market across the city.
Violation record
The Department of Buildings has 2 open notices on record for this building, out of 42 notices on file; the most recent was issued Feb 21, 2022.
Issued Feb 21, 2022 — CYCLE 7A NO REPORT FILED
Issued Oct 13, 1999 — 1P1P7133
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091887. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 10 alteration filing. Its latest status categories are 5 recorded as completed, 5 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 520 5 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 10 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Mechanical system installation associated with new building construction filed under job number 121209192. Filing M00452859-I1.
Filing M00452859-I1 reached an approved status.
DOB lists a first permit date for M00452859-I1. That is not by itself confirmation of activity on site.
Installation of a temporary construction fence as per pans during nb construction. no change in use, egress or occupancy. fence to comply with 2014 NYC building code, chapter 33. Filing M00686062-I1.
DOB lists a first permit date for M00686062-I1. That is not by itself confirmation of activity on site.
Installation of Temporary Partitions / Weather Walls. No change in use, egress or occupancy. Filing M01254755-I1.
Filing M01254755-I1 reached an approved status.
DOB lists a first permit date for M01254755-I1. That is not by itself confirmation of activity on site.
Removal and instillation of interior non load bearing partitions and related finishes. filed in conjuction with new building application 121209192. mpp 47. Filing M01361879-I1.
Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01361879-S1.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01361879-S2.
Filing M01361879-I1 reached an approved status.
Filing M01361879-S1 reached an approved status.
Filing M01361879-S2 reached an approved status.
DOB lists a first permit date for M01361879-S2. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01361879-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01361879-S1. That is not by itself confirmation of activity on site.
DOB recorded a sign-off for M01254755-I1.
The latest status recorded for M01254755-I1 is “LOC Issued.”
DOB recorded a sign-off for M01361879-S2.
The latest status recorded for M01361879-S2 is “LOC Issued.”
Mechanical system installation associated with new building construction filed under job number 121209192. Filing M00452859-P2.
Removal and instillation of interior non load bearing partitions and related finishes. filed in conjuction with new building application 121209192. mpp 47. Filing M01443560-I1.
Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01443560-S1.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. Filing M01443560-S2.
Filing M00452859-P2 reached an approved status.
The latest status recorded for M00452859-P2 is “Approved.”
The latest status recorded for M00452859-I1 is “Permit Entire.”
Filing M01443560-S1 reached an approved status.
Filing M01443560-S2 reached an approved status.
The latest status recorded for M01443560-S2 is “Approved.”
DOB recorded a sign-off for M01361879-S1.
The latest status recorded for M01361879-S1 is “LOC Issued.”
Filing M01443560-I1 reached an approved status.
DOB lists a first permit date for M01443560-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01443560-I1 is “Permit Entire.”
DOB lists a first permit date for M01443560-S1. That is not by itself confirmation of activity on site.
The latest status recorded for M01443560-S1 is “Permit Entire.”
DOB recorded a sign-off for M01361879-I1.
The latest status recorded for M01361879-I1 is “LOC Issued.”
DOB recorded a sign-off for M00686062-I1.
The latest status recorded for M00686062-I1 is “LOC Issued.”