Building record · BIN 1091945

1345 3 Avenue

1345 3 Avenue, Manhattan, NY 10075

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 36 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1091945

1345 3 Avenue

Upper East Side-Lenox Hill-Roosevelt Island, Manhattan

A consolidated public-record view · updated Nov 16, 2026

DOB filings
36
Active-status
16
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings36
Open or active-status records16
First included filingDec 5, 2022
Latest recorded changeNov 16, 2026

The lot

What is already here?

The lot holds a 16-story health facility built in 2023, on a 18,595 sq ft lot.

Built
2023
Last altered
2023
Floors
16
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
C1-9
Lot area
18,595 sq ft
Building area
239,762 sq ft

The apartments

12 condominium apartments are assessed on this block, and the typical one is 1,716 sq ft (159 m²). They run from 159 to 166 m².

The city values the typical one at $1,134,821. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

8 apartments on this tax block changed hands in the year the city last published, at a median of $510,000, from 362,500 to 1,400,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

S.K.I. REALTY, INC.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 12, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091945. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 20 new building, 16 alteration filing. Its latest status categories are 3 under review, 13 approved, 20 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 5, 2022
Latest recorded change
Nov 16, 2026
Highest proposed story count
16 stories
Highest proposed unit count
2 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1345 3 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 36 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Plumbing installations for New Building, at primary areas with core & shell base building areas though out, see comments for more. Filing M08013299-S3.

    01
  2. New building approved

    Filing M08013299-S3 reached an approved status.

    02
  3. New building filed

    Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-S4.

    03
  4. New building filed

    Temporary Construction Fence with integrated noise mitigating barrier for New Building construction. Filing M08013299-S9.

    04
  5. New building approved

    Filing M08013299-S9 reached an approved status.

    05
  6. Permit recorded for new building

    DOB lists a first permit date for M08013299-S9. That is not by itself confirmation of activity on site.

    06
  7. New building approved

    Filing M08013299-S4 reached an approved status.

    07
  8. New building filed

    Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1. Filing M08013299-S8.

    08
  9. New building approved

    Filing M08013299-S8 reached an approved status.

    09
  10. New building filed

    Limited Civil Engineering scope for new incoming services to foundation wall point of entry for Domestic and Fire Water Services for New Building: see comments for more. Filing M08013299-Z1.

    010
  11. New building filed

    StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-Z3.

    011
  12. New building approved

    Filing M08013299-Z3 reached an approved status.

    012
  13. New building approved

    Filing M08013299-Z1 reached an approved status.

    013
  14. New building filed

    Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-S7.

    014
  15. Alteration filed

    Installation and use of temporary cocoon as per plans filed herewith. no change in use, egress, or occupancy. Filing M00897018-I1.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z1. That is not by itself confirmation of activity on site.

    016
  17. New building approved

    Filing M08013299-S7 reached an approved status.

    017
  18. New building filed

    Fuel Oil Piping with 6,000 gallon storage tank, related conditioning and components for Fuel Oil System. Filing M08013299-Z5.

    018
  19. Permit recorded for new building

    DOB lists a first permit date for M08013299-S7. That is not by itself confirmation of activity on site.

    019
  20. Permit recorded for new building

    DOB lists a first permit date for M08013299-S4. That is not by itself confirmation of activity on site.

    020
  21. Alteration approved

    Filing M00897018-I1 reached an approved status.

    021
  22. Alteration filed

    Installation of hdsb sidewalk shed in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M00984349-I1.

    022
  23. Permit recorded for alteration

    DOB lists a first permit date for M00897018-I1. That is not by itself confirmation of activity on site.

    023
  24. Alteration filed

    Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway. Filing M00980935-I1.

    024
  25. Alteration approved

    Filing M00984349-I1 reached an approved status.

    025
  26. Permit recorded for alteration

    DOB lists a first permit date for M00980935-I1. That is not by itself confirmation of activity on site.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M00984349-I1. That is not by itself confirmation of activity on site.

    027
  28. Alteration filed

    Temporary roof protection at adjacent property (207 east 76 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01015933-I1.

    028
  29. Alteration filed

    Temporary roof protection at adjacent property (204 east 77 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01015924-I1.

    029
  30. Permit recorded for new building

    DOB lists a first permit date for M08013299-S3. That is not by itself confirmation of activity on site.

    030
  31. Alteration filed

    Temporary roof protection at adjacent property (205 east 76 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01016241-I1.

    031
  32. Permit recorded for alteration

    DOB lists a first permit date for M01015933-I1. That is not by itself confirmation of activity on site.

    032
  33. Permit recorded for alteration

    DOB lists a first permit date for M01015924-I1. That is not by itself confirmation of activity on site.

    033
  34. Permit recorded for alteration

    DOB lists a first permit date for M01016241-I1. That is not by itself confirmation of activity on site.

    034
  35. Alteration filed

    Equipment use (car c): single 7000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995590-I1.

    035
  36. Permit recorded for alteration

    DOB lists a first permit date for M00995590-I1. That is not by itself confirmation of activity on site.

    036
  37. Alteration filed

    Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing M01033663-I1.

    037
  38. Alteration approved

    Filing M01033663-I1 reached an approved status.

    038
  39. Permit recorded for alteration

    DOB lists a first permit date for M01033663-I1. That is not by itself confirmation of activity on site.

    039
  40. Alteration filed

    Installation and use of temporary stair tower as per plans filed herewith. no change in use, egress, or occupancy. Filing M00897154-I1.

    040
  41. Permit recorded for alteration

    DOB lists a first permit date for M00897154-I1. That is not by itself confirmation of activity on site.

    041
  42. New building filed

    Installation of Mechanical systems for new 16-story medical office building core/shell and fit-out areas inclusively. Filing M08013299-S5.

    042
  43. Alteration filed

    Cars a&b: temporary hoist run-back structure during new bldg construction, filed separately. hoist run-back structure shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this app. hoist & elevator filed sep. Filing M00995596-I1.

    043
  44. Permit recorded for alteration

    DOB lists a first permit date for M00995596-I1. That is not by itself confirmation of activity on site.

    044
  45. Alteration filed

    Equipment use cars a&b: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995586-I1.

    045
  46. Permit recorded for alteration

    DOB lists a first permit date for M00995586-I1. That is not by itself confirmation of activity on site.

    046
  47. New building approved

    Filing M08013299-Z5 reached an approved status.

    047
  48. New building filed

    Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith. Filing M08013299-Z6.

    048
  49. New building filed

    Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herewith. (see comments for more). Filing M08013299-S6.

    049
  50. New building filed

    Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-Z8.

    050
  51. Alteration filed

    Temporary loading platform as per drawings. loading platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01075079-I1.

    051
  52. Permit recorded for alteration

    DOB lists a first permit date for M01075079-I1. That is not by itself confirmation of activity on site.

    052
  53. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z5. That is not by itself confirmation of activity on site.

    053
  54. New building approved

    Filing M08013299-Z8 reached an approved status.

    054
  55. Alteration filed

    Temporary monorail system as per drawings during nb const, filed sep. monorail system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01081864-I1.

    055
  56. Permit recorded for alteration

    DOB lists a first permit date for M01081864-I1. That is not by itself confirmation of activity on site.

    056
  57. Alteration filed

    Temporary suspended scaffold as per drawings during nb const, filed sep. suspended scaffold shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01081852-I1.

    057
  58. Permit recorded for alteration

    DOB lists a first permit date for M01081852-I1. That is not by itself confirmation of activity on site.

    058
  59. Alteration filed

    Temporary scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01117438-I1.

    059
  60. Permit recorded for alteration

    DOB lists a first permit date for M01117438-I1. That is not by itself confirmation of activity on site.

    060
  61. New building approved

    Filing M08013299-S5 reached an approved status.

    061
  62. New building approved

    Filing M08013299-Z6 reached an approved status.

    062
  63. Permit recorded for new building

    DOB lists a first permit date for M08013299-S5. That is not by itself confirmation of activity on site.

    063
  64. New building approved

    Filing M08013299-S6 reached an approved status.

    064
  65. Permit recorded for new building

    DOB lists a first permit date for M08013299-S6. That is not by itself confirmation of activity on site.

    065
  66. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z6. That is not by itself confirmation of activity on site.

    066
  67. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z8. That is not by itself confirmation of activity on site.

    067
  68. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z3. That is not by itself confirmation of activity on site.

    068
  69. Alteration filed

    Temporary system scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01033663-S1.

    069
  70. Permit recorded for alteration

    DOB lists a first permit date for M01033663-S1. That is not by itself confirmation of activity on site.

    070
  71. New building filed

    Complete architectural fit-out of core/shell floors in conjunction with primary NB # M08013299-I1, as per plans filed herewith. Filing M08013299-B2.

    071
  72. New building filed

    Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-B8.

    072
  73. New building approved

    Filing M08013299-B8 reached an approved status.

    073
  74. New building now approved

    The latest status recorded for M08013299-B8 is “Approved.”

    074
  75. New building filed

    Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-C2.

    075
  76. New building filed

    Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-C3.

    076
  77. New building signed off

    DOB recorded a sign-off for M08013299-Z1.

    077
  78. New building now completed

    The latest status recorded for M08013299-Z1 is “LOC Issued.”

    078
  79. New building filed

    StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-C5.

    079
  80. New building approved

    Filing M08013299-C5 reached an approved status.

    080
  81. New building now approved

    The latest status recorded for M08013299-C5 is “Approved.”

    081
  82. New building now approved

    The latest status recorded for M08013299-Z3 is “Permit Entire.”

    082
  83. Alteration signed off

    DOB recorded a sign-off for M00984349-I1.

    083
  84. Alteration now completed

    The latest status recorded for M00984349-I1 is “LOC Issued.”

    084
  85. New building signed off

    DOB recorded a sign-off for M08013299-Z5.

    085
  86. New building now completed

    The latest status recorded for M08013299-Z5 is “LOC Issued.”

    086
  87. Permit recorded for new building

    DOB lists a first permit date for M08013299-S8. That is not by itself confirmation of activity on site.

    087
  88. New building now approved

    The latest status recorded for M08013299-S8 is “Permit Entire.”

    088
  89. New building filed

    Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith. Filing M08013299-C6.

    089
  90. New building approved

    Filing M08013299-C2 reached an approved status.

    090
  91. New building now approved

    The latest status recorded for M08013299-C2 is “Approved.”

    091
  92. New building now approved

    The latest status recorded for M08013299-S7 is “Permit Entire.”

    092
  93. New building approved

    Filing M08013299-C3 reached an approved status.

    093
  94. New building now approved

    The latest status recorded for M08013299-C3 is “Approved.”

    094
  95. New building now approved

    The latest status recorded for M08013299-Z8 is “Permit Entire.”

    095
  96. New building signed off

    DOB recorded a sign-off for M08013299-S9.

    096
  97. New building now completed

    The latest status recorded for M08013299-S9 is “LOC Issued.”

    097
  98. Alteration signed off

    DOB recorded a sign-off for M00995590-I1.

    098
  99. Alteration now completed

    The latest status recorded for M00995590-I1 is “LOC Issued.”

    099
  100. Alteration signed off

    DOB recorded a sign-off for M00995586-I1.

    0100
  101. Alteration now completed

    The latest status recorded for M00995586-I1 is “LOC Issued.”

    0101
  102. New building now under review

    The latest status recorded for M08013299-B2 is “Plan Examiner Review.”

    0102
  103. New building now approved

    The latest status recorded for M08013299-S6 is “Permit Entire.”

    0103
  104. Alteration signed off

    DOB recorded a sign-off for M00897018-I1.

    0104
  105. Alteration now completed

    The latest status recorded for M00897018-I1 is “LOC Issued.”

    0105
  106. Alteration signed off

    DOB recorded a sign-off for M00897154-I1.

    0106
  107. Alteration now completed

    The latest status recorded for M00897154-I1 is “LOC Issued.”

    0107
  108. New building now approved

    The latest status recorded for M08013299-S3 is “Permit Entire.”

    0108
  109. Alteration signed off

    DOB recorded a sign-off for M01033663-I1.

    0109
  110. Alteration now completed

    The latest status recorded for M01033663-I1 is “LOC Issued.”

    0110
  111. Alteration signed off

    DOB recorded a sign-off for M01117438-I1.

    0111
  112. Alteration now completed

    The latest status recorded for M01117438-I1 is “LOC Issued.”

    0112
  113. Alteration signed off

    DOB recorded a sign-off for M01081864-I1.

    0113
  114. Alteration now completed

    The latest status recorded for M01081864-I1 is “LOC Issued.”

    0114
  115. Alteration signed off

    DOB recorded a sign-off for M01075079-I1.

    0115
  116. Alteration now completed

    The latest status recorded for M01075079-I1 is “LOC Issued.”

    0116
  117. Alteration signed off

    DOB recorded a sign-off for M01033663-S1.

    0117
  118. Alteration now completed

    The latest status recorded for M01033663-S1 is “LOC Issued.”

    0118
  119. Alteration signed off

    DOB recorded a sign-off for M01016241-I1.

    0119
  120. Alteration now completed

    The latest status recorded for M01016241-I1 is “LOC Issued.”

    0120
  121. Alteration signed off

    DOB recorded a sign-off for M01015933-I1.

    0121
  122. Alteration now completed

    The latest status recorded for M01015933-I1 is “LOC Issued.”

    0122
  123. Alteration signed off

    DOB recorded a sign-off for M01015924-I1.

    0123
  124. Alteration now completed

    The latest status recorded for M01015924-I1 is “LOC Issued.”

    0124
  125. Alteration signed off

    DOB recorded a sign-off for M00995596-I1.

    0125
  126. Alteration now completed

    The latest status recorded for M00995596-I1 is “LOC Issued.”

    0126
  127. New building filed

    Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herewith. (see comments for more). Filing M08013299-C7.

    0127
  128. New building approved

    Filing M08013299-C6 reached an approved status.

    0128
  129. New building now approved

    The latest status recorded for M08013299-C6 is “Approved.”

    0129
  130. Alteration signed off

    DOB recorded a sign-off for M00980935-I1.

    0130
  131. Alteration now completed

    The latest status recorded for M00980935-I1 is “LOC Issued.”

    0131
  132. New building now approved

    The latest status recorded for M08013299-Z6 is “Permit Entire.”

    0132
  133. Alteration signed off

    DOB recorded a sign-off for M01081852-I1.

    0133
  134. Alteration now completed

    The latest status recorded for M01081852-I1 is “LOC Issued.”

    0134
  135. New building now under review

    The latest status recorded for M08013299-C7 is “Pending Plan Examiner Assignment.”

    0135
  136. New building signed off

    DOB recorded a sign-off for M08013299-S4.

    0136
  137. New building now completed

    The latest status recorded for M08013299-S4 is “LOC Issued.”

    0137
  138. New building filed

    Plumbing installations for New Building, at primary areas with core & shell base building areas though out, see comments for more. Filing M08013299-C8.

    0138
  139. New building now approved

    The latest status recorded for M08013299-S5 is “Permit Entire.”

    0139
  140. New building now under review

    The latest status recorded for M08013299-C8 is “Pending Plan Examiner Assignment.”

    0140