DOB filing M08013299-C8
New building at 1345 3 Avenue
Building record · BIN 1091945
1345 3 Avenue, Manhattan, NY 10075
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 36 independently sourced records, including 16 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1091945
1345 3 Avenue
Upper East Side-Lenox Hill-Roosevelt Island, Manhattan
A consolidated public-record view · updated Nov 16, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 16-story health facility built in 2023, on a 18,595 sq ft lot.
The apartments
12 condominium apartments are assessed on this block, and the typical one is 1,716 sq ft (159 m²). They run from 159 to 166 m².
The city values the typical one at $1,134,821. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.
What it sold for
8 apartments on this tax block changed hands in the year the city last published, at a median of $510,000, from 362,500 to 1,400,000.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
S.K.I. REALTY, INC.
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 12, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091945. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 20 new building, 16 alteration filing. Its latest status categories are 3 under review, 13 approved, 20 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1345 3 Avenue.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 36 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Plumbing installations for New Building, at primary areas with core & shell base building areas though out, see comments for more. Filing M08013299-S3.
Filing M08013299-S3 reached an approved status.
Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-S4.
Temporary Construction Fence with integrated noise mitigating barrier for New Building construction. Filing M08013299-S9.
Filing M08013299-S9 reached an approved status.
DOB lists a first permit date for M08013299-S9. That is not by itself confirmation of activity on site.
Filing M08013299-S4 reached an approved status.
Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1. Filing M08013299-S8.
Filing M08013299-S8 reached an approved status.
Limited Civil Engineering scope for new incoming services to foundation wall point of entry for Domestic and Fire Water Services for New Building: see comments for more. Filing M08013299-Z1.
StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-Z3.
Filing M08013299-Z3 reached an approved status.
Filing M08013299-Z1 reached an approved status.
Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-S7.
Installation and use of temporary cocoon as per plans filed herewith. no change in use, egress, or occupancy. Filing M00897018-I1.
DOB lists a first permit date for M08013299-Z1. That is not by itself confirmation of activity on site.
Filing M08013299-S7 reached an approved status.
Fuel Oil Piping with 6,000 gallon storage tank, related conditioning and components for Fuel Oil System. Filing M08013299-Z5.
DOB lists a first permit date for M08013299-S7. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M08013299-S4. That is not by itself confirmation of activity on site.
Filing M00897018-I1 reached an approved status.
Installation of hdsb sidewalk shed in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M00984349-I1.
DOB lists a first permit date for M00897018-I1. That is not by itself confirmation of activity on site.
Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway. Filing M00980935-I1.
Filing M00984349-I1 reached an approved status.
DOB lists a first permit date for M00980935-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M00984349-I1. That is not by itself confirmation of activity on site.
Temporary roof protection at adjacent property (207 east 76 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01015933-I1.
Temporary roof protection at adjacent property (204 east 77 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01015924-I1.
DOB lists a first permit date for M08013299-S3. That is not by itself confirmation of activity on site.
Temporary roof protection at adjacent property (205 east 76 street) during nb construction, filed sep. roof protection shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01016241-I1.
DOB lists a first permit date for M01015933-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01015924-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M01016241-I1. That is not by itself confirmation of activity on site.
Equipment use (car c): single 7000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995590-I1.
DOB lists a first permit date for M00995590-I1. That is not by itself confirmation of activity on site.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing M01033663-I1.
Filing M01033663-I1 reached an approved status.
DOB lists a first permit date for M01033663-I1. That is not by itself confirmation of activity on site.
Installation and use of temporary stair tower as per plans filed herewith. no change in use, egress, or occupancy. Filing M00897154-I1.
DOB lists a first permit date for M00897154-I1. That is not by itself confirmation of activity on site.
Installation of Mechanical systems for new 16-story medical office building core/shell and fit-out areas inclusively. Filing M08013299-S5.
Cars a&b: temporary hoist run-back structure during new bldg construction, filed separately. hoist run-back structure shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this app. hoist & elevator filed sep. Filing M00995596-I1.
DOB lists a first permit date for M00995596-I1. That is not by itself confirmation of activity on site.
Equipment use cars a&b: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995586-I1.
DOB lists a first permit date for M00995586-I1. That is not by itself confirmation of activity on site.
Filing M08013299-Z5 reached an approved status.
Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith. Filing M08013299-Z6.
Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herewith. (see comments for more). Filing M08013299-S6.
Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-Z8.
Temporary loading platform as per drawings. loading platform shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01075079-I1.
DOB lists a first permit date for M01075079-I1. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M08013299-Z5. That is not by itself confirmation of activity on site.
Filing M08013299-Z8 reached an approved status.
Temporary monorail system as per drawings during nb const, filed sep. monorail system shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01081864-I1.
DOB lists a first permit date for M01081864-I1. That is not by itself confirmation of activity on site.
Temporary suspended scaffold as per drawings during nb const, filed sep. suspended scaffold shall comply with ch 33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01081852-I1.
DOB lists a first permit date for M01081852-I1. That is not by itself confirmation of activity on site.
Temporary scaffold stair tower as per drawings. scaffold stair tower shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01117438-I1.
DOB lists a first permit date for M01117438-I1. That is not by itself confirmation of activity on site.
Filing M08013299-S5 reached an approved status.
Filing M08013299-Z6 reached an approved status.
DOB lists a first permit date for M08013299-S5. That is not by itself confirmation of activity on site.
Filing M08013299-S6 reached an approved status.
DOB lists a first permit date for M08013299-S6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M08013299-Z6. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M08013299-Z8. That is not by itself confirmation of activity on site.
DOB lists a first permit date for M08013299-Z3. That is not by itself confirmation of activity on site.
Temporary system scaffold as per drawings. scaffold shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. Filing M01033663-S1.
DOB lists a first permit date for M01033663-S1. That is not by itself confirmation of activity on site.
Complete architectural fit-out of core/shell floors in conjunction with primary NB # M08013299-I1, as per plans filed herewith. Filing M08013299-B2.
Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-B8.
Filing M08013299-B8 reached an approved status.
The latest status recorded for M08013299-B8 is “Approved.”
Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-C2.
Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-C3.
DOB recorded a sign-off for M08013299-Z1.
The latest status recorded for M08013299-Z1 is “LOC Issued.”
StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-C5.
Filing M08013299-C5 reached an approved status.
The latest status recorded for M08013299-C5 is “Approved.”
The latest status recorded for M08013299-Z3 is “Permit Entire.”
DOB recorded a sign-off for M00984349-I1.
The latest status recorded for M00984349-I1 is “LOC Issued.”
DOB recorded a sign-off for M08013299-Z5.
The latest status recorded for M08013299-Z5 is “LOC Issued.”
DOB lists a first permit date for M08013299-S8. That is not by itself confirmation of activity on site.
The latest status recorded for M08013299-S8 is “Permit Entire.”
Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith. Filing M08013299-C6.
Filing M08013299-C2 reached an approved status.
The latest status recorded for M08013299-C2 is “Approved.”
The latest status recorded for M08013299-S7 is “Permit Entire.”
Filing M08013299-C3 reached an approved status.
The latest status recorded for M08013299-C3 is “Approved.”
The latest status recorded for M08013299-Z8 is “Permit Entire.”
DOB recorded a sign-off for M08013299-S9.
The latest status recorded for M08013299-S9 is “LOC Issued.”
DOB recorded a sign-off for M00995590-I1.
The latest status recorded for M00995590-I1 is “LOC Issued.”
DOB recorded a sign-off for M00995586-I1.
The latest status recorded for M00995586-I1 is “LOC Issued.”
The latest status recorded for M08013299-B2 is “Plan Examiner Review.”
The latest status recorded for M08013299-S6 is “Permit Entire.”
DOB recorded a sign-off for M00897018-I1.
The latest status recorded for M00897018-I1 is “LOC Issued.”
DOB recorded a sign-off for M00897154-I1.
The latest status recorded for M00897154-I1 is “LOC Issued.”
The latest status recorded for M08013299-S3 is “Permit Entire.”
DOB recorded a sign-off for M01033663-I1.
The latest status recorded for M01033663-I1 is “LOC Issued.”
DOB recorded a sign-off for M01117438-I1.
The latest status recorded for M01117438-I1 is “LOC Issued.”
DOB recorded a sign-off for M01081864-I1.
The latest status recorded for M01081864-I1 is “LOC Issued.”
DOB recorded a sign-off for M01075079-I1.
The latest status recorded for M01075079-I1 is “LOC Issued.”
DOB recorded a sign-off for M01033663-S1.
The latest status recorded for M01033663-S1 is “LOC Issued.”
DOB recorded a sign-off for M01016241-I1.
The latest status recorded for M01016241-I1 is “LOC Issued.”
DOB recorded a sign-off for M01015933-I1.
The latest status recorded for M01015933-I1 is “LOC Issued.”
DOB recorded a sign-off for M01015924-I1.
The latest status recorded for M01015924-I1 is “LOC Issued.”
DOB recorded a sign-off for M00995596-I1.
The latest status recorded for M00995596-I1 is “LOC Issued.”
Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herewith. (see comments for more). Filing M08013299-C7.
Filing M08013299-C6 reached an approved status.
The latest status recorded for M08013299-C6 is “Approved.”
DOB recorded a sign-off for M00980935-I1.
The latest status recorded for M00980935-I1 is “LOC Issued.”
The latest status recorded for M08013299-Z6 is “Permit Entire.”
DOB recorded a sign-off for M01081852-I1.
The latest status recorded for M01081852-I1 is “LOC Issued.”
The latest status recorded for M08013299-C7 is “Pending Plan Examiner Assignment.”
DOB recorded a sign-off for M08013299-S4.
The latest status recorded for M08013299-S4 is “LOC Issued.”
Plumbing installations for New Building, at primary areas with core & shell base building areas though out, see comments for more. Filing M08013299-C8.
The latest status recorded for M08013299-S5 is “Permit Entire.”
The latest status recorded for M08013299-C8 is “Pending Plan Examiner Assignment.”