Building record · BIN 1091945

1345 3 Avenue

1345 3 Avenue, Manhattan, NY 10075

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 21 independently sourced records, including 15 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 1091945

1345 3 Avenue

Upper East Side-Lenox Hill-Roosevelt Island, Manhattan

A consolidated public-record view · updated Oct 27, 2026

DOB filings
21
Active-status
15
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings21
Open or active-status records15
First included filingFeb 28, 2023
Latest recorded changeOct 27, 2026

The lot

What is already here?

The lot holds a 16-story health facility built in 2023, on a 18,595 sq ft lot.

Built
2023
Last altered
2023
Floors
16
Residential units
0
Building type
Health facility
Land use
Public facilities and institutions
Zoning district
C1-9
Lot area
18,595 sq ft
Building area
239,762 sq ft

The apartments

12 condominium apartments are assessed on this block, and the typical one is 1,716 sq ft (159 m²). They run from 159 to 166 m².

The city values the typical one at $1,134,821. That is the Department of Finance’s market valuation for tax, not an asking price and not a sale.

What it sold for

8 apartments on this tax block changed hands in the year the city last published, at a median of $510,000, from 362,500 to 1,400,000.

Recorded sale prices from the Department of Finance’s rolling file, covering the year to Sep 30, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.

Owner of record

S.K.I. REALTY, INC.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1091945. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 16 new building, 5 alteration filing. Its latest status categories are 2 under review, 13 approved, 6 recorded as completed. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Feb 28, 2023
Latest recorded change
Oct 27, 2026
Highest proposed story count
16 stories
Highest proposed unit count
2 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1345 3 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 21 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-S4.

    01
  2. New building filed

    Temporary Construction Fence with integrated noise mitigating barrier for New Building construction. Filing M08013299-S9.

    02
  3. New building approved

    Filing M08013299-S9 reached an approved status.

    03
  4. Permit recorded for new building

    DOB lists a first permit date for M08013299-S9. That is not by itself confirmation of activity on site.

    04
  5. New building approved

    Filing M08013299-S4 reached an approved status.

    05
  6. New building filed

    Installation of 19'-0' curb-cut [14' cut + (2) 2.5' splays] on the north side of East 76 Street, 50' east of the Third Avenue street line, in conjunction with New Building M08013299-I1. Filing M08013299-S8.

    06
  7. New building approved

    Filing M08013299-S8 reached an approved status.

    07
  8. New building filed

    Limited Civil Engineering scope for new incoming services to foundation wall point of entry for Domestic and Fire Water Services for New Building: see comments for more. Filing M08013299-Z1.

    08
  9. New building filed

    StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-Z3.

    09
  10. New building approved

    Filing M08013299-Z3 reached an approved status.

    010
  11. New building approved

    Filing M08013299-Z1 reached an approved status.

    011
  12. New building filed

    Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-S7.

    012
  13. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z1. That is not by itself confirmation of activity on site.

    013
  14. New building approved

    Filing M08013299-S7 reached an approved status.

    014
  15. New building filed

    Fuel Oil Piping with 6,000 gallon storage tank, related conditioning and components for Fuel Oil System. Filing M08013299-Z5.

    015
  16. Permit recorded for new building

    DOB lists a first permit date for M08013299-S7. That is not by itself confirmation of activity on site.

    016
  17. Permit recorded for new building

    DOB lists a first permit date for M08013299-S4. That is not by itself confirmation of activity on site.

    017
  18. Alteration filed

    Installation of hdsb sidewalk shed in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy. Filing M00984349-I1.

    018
  19. Alteration approved

    Filing M00984349-I1 reached an approved status.

    019
  20. Alteration filed

    Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed on sidewalk/roadway. Filing M00980935-I1.

    020
  21. Permit recorded for alteration

    DOB lists a first permit date for M00984349-I1. That is not by itself confirmation of activity on site.

    021
  22. Permit recorded for alteration

    DOB lists a first permit date for M00980935-I1. That is not by itself confirmation of activity on site.

    022
  23. Alteration filed

    Equipment use (car c): single 7000 # capacity personnel/material hoist during nb const, filed sep. hoist shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995590-I1.

    023
  24. Permit recorded for alteration

    DOB lists a first permit date for M00995590-I1. That is not by itself confirmation of activity on site.

    024
  25. Alteration filed

    Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. dot permits by others for shed installed on roadway. Filing M01033663-I1.

    025
  26. Alteration approved

    Filing M01033663-I1 reached an approved status.

    026
  27. Permit recorded for alteration

    DOB lists a first permit date for M01033663-I1. That is not by itself confirmation of activity on site.

    027
  28. New building filed

    Installation of Mechanical systems for new 16-story medical office building core/shell and fit-out areas inclusively. Filing M08013299-S5.

    028
  29. Alteration filed

    Equipment use cars a&b: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application. elevator application submitted separately. Filing M00995586-I1.

    029
  30. Permit recorded for alteration

    DOB lists a first permit date for M00995586-I1. That is not by itself confirmation of activity on site.

    030
  31. New building approved

    Filing M08013299-Z5 reached an approved status.

    031
  32. New building filed

    Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herewith. (see comments for more). Filing M08013299-S6.

    032
  33. New building filed

    Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-Z8.

    033
  34. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z5. That is not by itself confirmation of activity on site.

    034
  35. New building approved

    Filing M08013299-Z8 reached an approved status.

    035
  36. New building approved

    Filing M08013299-S5 reached an approved status.

    036
  37. New building approved

    Filing M08013299-S6 reached an approved status.

    037
  38. Permit recorded for new building

    DOB lists a first permit date for M08013299-S5. That is not by itself confirmation of activity on site.

    038
  39. Permit recorded for new building

    DOB lists a first permit date for M08013299-S6. That is not by itself confirmation of activity on site.

    039
  40. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z8. That is not by itself confirmation of activity on site.

    040
  41. Permit recorded for new building

    DOB lists a first permit date for M08013299-Z3. That is not by itself confirmation of activity on site.

    041
  42. New building filed

    Complete architectural fit-out of core/shell floors in conjunction with primary NB # M08013299-I1, as per plans filed herewith. Filing M08013299-B2.

    042
  43. New building filed

    Superstructure work in conjunction with new building constructions for New 16 story Medical Office Building. Filing M08013299-B8.

    043
  44. New building approved

    Filing M08013299-B8 reached an approved status.

    044
  45. New building now approved

    The latest status recorded for M08013299-B8 is “Approved.”

    045
  46. New building filed

    Installation of core & shell Sprinkler & Standpipe system for new 16-story Medical Office Building, see comments for more:. Filing M08013299-C2.

    046
  47. New building now approved

    The latest status recorded for M08013299-S4 is “Permit Entire.”

    047
  48. New building filed

    Sprinkler installation per interior fit-out, in conjunction with New 16-story Medical Office Building, as per plans filed herewith. Filing M08013299-C3.

    048
  49. New building signed off

    DOB recorded a sign-off for M08013299-Z1.

    049
  50. New building now completed

    The latest status recorded for M08013299-Z1 is “LOC Issued.”

    050
  51. New building filed

    StormWater (SW) Management design [SW Detention Tank + SW Reuse Tank (Cistern Tank / Rain Tank) with relative components, filtration skid & more] in conjunction with DEP StormWater Pollution Prevention Plan (SWPPP), see comments for more. Filing M08013299-C5.

    051
  52. Alteration now approved

    The latest status recorded for M00980935-I1 is “Permit Entire.”

    052
  53. New building approved

    Filing M08013299-C5 reached an approved status.

    053
  54. New building now approved

    The latest status recorded for M08013299-C5 is “Approved.”

    054
  55. New building now approved

    The latest status recorded for M08013299-Z3 is “Permit Entire.”

    055
  56. Alteration now approved

    The latest status recorded for M01033663-I1 is “Permit Entire.”

    056
  57. Alteration signed off

    DOB recorded a sign-off for M00984349-I1.

    057
  58. Alteration now completed

    The latest status recorded for M00984349-I1 is “LOC Issued.”

    058
  59. New building signed off

    DOB recorded a sign-off for M08013299-Z5.

    059
  60. New building now completed

    The latest status recorded for M08013299-Z5 is “LOC Issued.”

    060
  61. Permit recorded for new building

    DOB lists a first permit date for M08013299-S8. That is not by itself confirmation of activity on site.

    061
  62. New building now approved

    The latest status recorded for M08013299-S8 is “Permit Entire.”

    062
  63. New building now approved

    The latest status recorded for M08013299-S5 is “Permit Entire.”

    063
  64. New building filed

    Installation of electric hot water Boiler in conjunction with new 16-story Medical Office Building as per plans filed herewith. Filing M08013299-C6.

    064
  65. New building approved

    Filing M08013299-C2 reached an approved status.

    065
  66. New building now approved

    The latest status recorded for M08013299-C2 is “Approved.”

    066
  67. New building now approved

    The latest status recorded for M08013299-S7 is “Permit Entire.”

    067
  68. New building now under review

    The latest status recorded for M08013299-C6 is “Plan Examiner Review.”

    068
  69. New building approved

    Filing M08013299-C3 reached an approved status.

    069
  70. New building now approved

    The latest status recorded for M08013299-C3 is “Approved.”

    070
  71. New building now approved

    The latest status recorded for M08013299-Z8 is “Permit Entire.”

    071
  72. New building signed off

    DOB recorded a sign-off for M08013299-S9.

    072
  73. New building now completed

    The latest status recorded for M08013299-S9 is “LOC Issued.”

    073
  74. Alteration signed off

    DOB recorded a sign-off for M00995590-I1.

    074
  75. Alteration now completed

    The latest status recorded for M00995590-I1 is “LOC Issued.”

    075
  76. Alteration signed off

    DOB recorded a sign-off for M00995586-I1.

    076
  77. Alteration now completed

    The latest status recorded for M00995586-I1 is “LOC Issued.”

    077
  78. New building now under review

    The latest status recorded for M08013299-B2 is “Plan Examiner Review.”

    078
  79. New building now approved

    The latest status recorded for M08013299-S6 is “Permit Entire.”

    079