Building record · BIN 2003423

1021 Summit Avenue

1021 Summit Avenue, Bronx, NY 10452

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 8 independently sourced records, including 8 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2003423

1021 Summit Avenue

Highbridge, Bronx

A consolidated public-record view · updated Sep 29, 2026

DOB filings
8
Active-status
8
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings8
Open or active-status records8
First included filingMay 16, 2025
Latest recorded changeSep 29, 2026

The lot

What is already here?

The lot holds a 2-story one-family home built in 1899, on a 2,185 sq ft lot.

Built
1899
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R7-1
Lot area
2,185 sq ft
Building area
1,304 sq ft

Owner of record

PRIME STORAGE BRONX MLK BOULEVARD, LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2003423. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 7 new building, 1 alteration filing. Its latest status categories are 6 under review, 2 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
May 16, 2025
Latest recorded change
Sep 29, 2026
Highest proposed story count
4 stories
Highest proposed unit count
8 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 1021 Summit Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 8 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Herewith to propose temporary 8' high plywood construction fence. Filing X01225408-I1.

    01
  2. Alteration approved

    Filing X01225408-I1 reached an approved status.

    02
  3. New building filed

    Provide new plumbing system for new building per plan. system including sanitary, domestic water, and storm system. no change in egress, occupancy, and zoning under this application. Filing X01221074-S5.

    03
  4. Permit recorded for alteration

    DOB lists a first permit date for X01225408-I1. That is not by itself confirmation of activity on site.

    04
  5. New building approved

    Filing X01221074-S5 reached an approved status.

    05
  6. New building filed

    Proposed 4 story 8 family residential building. Filing X01221074-P1.

    06
  7. Alteration now approved

    The latest status recorded for X01225408-I1 is “Permit Entire.”

    07
  8. Permit recorded for new building

    DOB lists a first permit date for X01221074-S5. That is not by itself confirmation of activity on site.

    08
  9. New building now approved

    The latest status recorded for X01221074-S5 is “Permit Entire.”

    09
  10. New building filed

    Proposed Structural plans for a Four (4) Stories Building with Partial Cellar. Filing X01221074-P3.

    010
  11. New building filed

    Proposed Foundation Plans for a Four (4) Stories Building with Partial Cellar. Filing X01221074-P2.

    011
  12. New building now under review

    The latest status recorded for X01221074-P3 is “Plan Examiner Review.”

    012
  13. New building now under review

    The latest status recorded for X01221074-P2 is “Plan Examiner Review.”

    013
  14. New building filed

    Provide sprinkler system per plan. No change in egress, occupancy, and egress. Filing X01221074-P6.

    014
  15. New building filed

    Provide new plumbing system for new building per plan. system including sanitary, domestic water, and storm system. no change in egress, occupancy, and zoning under this application. Filing X01221074-P5.

    015
  16. New building filed

    Provide mechanical system for new building. system includes heating and cooling system and building ventilation system. no change in egress, occupancy, and zoning under this filing. Filing X01221074-P4.

    016
  17. New building now under review

    The latest status recorded for X01221074-P6 is “Plan Examiner Review.”

    017
  18. New building now under review

    The latest status recorded for X01221074-P5 is “Plan Examiner Review.”

    018
  19. New building now under review

    The latest status recorded for X01221074-P4 is “Plan Examiner Review.”

    019
  20. New building now under review

    The latest status recorded for X01221074-P1 is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    020