Building record · BIN 2009611

3594 3 Avenue

3594 3 Avenue, Bronx, NY 10456

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2009611

3594 3 Avenue

Claremont Village-Claremont (East), Bronx

A consolidated public-record view · updated Sep 30, 2026

DOB filings
3
Active-status
3
Recorded addresses
2
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records3
First included filingDec 23, 2024
Latest recorded changeSep 30, 2026

The lot

What is already here?

The lot holds a 4-story educational building built in 1966, on a 144,278 sq ft lot.

  1. Floors 2–4Nothing on record
  2. Floor 1Street levelStreet level. The lot is recorded as public facilities and institutions.
  • Street levelPublic facilities and institutions
  • Above the southern skylineFrom about floor 5 — the tallest thing within 60 m to the south is 12.6 m
Drawn from the outline and roof height the Department of City Planning publishes for this building: 13.2 m over 4 floors, as the city counts them. 1 run of floors has something on record. The city publishes a roof height and a storey count for the lot, and nothing at all about any individual floor. What stands to the south is measured from the city’s own footprints and roof heights; it is a statement about the skyline, not a calculation of sunlight.
Built
1966
Floors
4
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R7-1
Lot area
144,278 sq ft
Building area
165,000 sq ft

Housing violations

12 violations are open against this address under the Housing Maintenance Code. 2 of them are the class the city calls immediately hazardous.

  • 2Immediately hazardous
  • 9Hazardous
  • 1Non-hazardous
  • 0Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

DEPARTMENT OF EDUCATION

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 39 notices on file; the most recent was issued May 13, 2026.

  • Construction

    Issued May 13, 2026 — SECTION OF WOOD HAS DETACHED AND HANGING FROM UNDERSIDE OF CORNICE AT ROOF LEVEL ABOVE FIRE ESCAPE ALSO OBSERVED VERTICAL STEP CRACKS AT VARIOUS LOCATIONS ON FACADE

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2009611. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 2 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 23, 2024
Latest recorded change
Sep 30, 2026
Highest proposed story count
4 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 3594 3 Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Q148Q: Roof Replacement, Bulkhead Roofs, Parapets, Canopy, Roof Curbs. Remove, repair, replace, point Brick Work including Masonry Repairs. Replace Doors on 2nd flr and Bulkhead roofs, install Roof Barriers Fence & Roof ladders, repair of Spalled Concrete. Filing X01115776-I1.

    01
  2. Alteration approved

    Filing X01115776-I1 reached an approved status.

    02
  3. Alteration filed

    Filing for temporary construction fence. No change in use, egress or occupancy. Filing X01266880-I1.

    03
  4. Alteration approved

    Filing X01266880-I1 reached an approved status.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for X01266880-I1. That is not by itself confirmation of activity on site.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for X01115776-I1. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Installation of new site improvements inlcuding pavements, drinking fountains and associated exterior plumbing. includes related earthwork. Filing X01220930-P4.

    07
  8. Alteration now approved

    The latest status recorded for X01266880-I1 is “Permit Entire.”

    08
  9. Alteration now under review

    The latest status recorded for X01220930-P4 is “Plan Examiner Review.”

    09
  10. Alteration now approved

    The latest status recorded for X01115776-I1 is “Permit Entire.”

    010