Building record · BIN 2017185

2879 Valentine Avenue

2879 Valentine Avenue, Bronx, NY 10458

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 6 independently sourced records, including 6 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2017185

2879 Valentine Avenue

Bedford Park, Bronx

A consolidated public-record view · updated Sep 29, 2026

DOB filings
6
Active-status
6
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings6
Open or active-status records6
First included filingNov 14, 2024
Latest recorded changeSep 29, 2026

The lot

What is already here?

The lot holds a vacant land on a 10,250 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R8
Lot area
10,250 sq ft

Housing violations

8 violations are open against this address under the Housing Maintenance Code.

  • 0Immediately hazardous
  • 0Hazardous
  • 6Non-hazardous
  • 2Information order

Open means the Department of Housing Preservation and Development has not recorded it as corrected, which is not the same as nobody having fixed it. The city publishes the apartment each was written against; that is not carried here, because a count says a building has a problem and an apartment number says whose.

Owner of record

BX DREAM, LLC

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2017185. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 4 alteration filing, 2 new building. Its latest status categories are 6 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Nov 14, 2024
Latest recorded change
Sep 29, 2026
Highest proposed story count
12 stories
Highest proposed unit count
88 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2879 Valentine Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 6 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    New Apartment Building. Filing X01129500-I1.

    01
  2. New building approved

    Filing X01129500-I1 reached an approved status.

    02
  3. Permit recorded for new building

    DOB lists a first permit date for X01129500-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf. Filing X01357723-I1.

    04
  5. Permit recorded for alteration

    DOB lists a first permit date for X01357723-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Install mechanical systems in conjunction with GC (-I1) NB job X01129499. There is no change in use, occupancy or egress. Filing X01378540-I1.

    06
  7. Alteration approved

    Filing X01378540-I1 reached an approved status.

    07
  8. New building filed

    New Apartment Building. Filing X01129500-P3.

    08
  9. Alteration filed

    Install mechanical systems in conjunction with GC (-I1) NB job X01129499. There is no change in use, occupancy or egress. Filing X01378540-P1.

    09
  10. Alteration approved

    Filing X01378540-P1 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for X01378540-P1 is “Approved.”

    011
  12. Alteration now approved

    The latest status recorded for X01357723-I1 is “Permit Entire.”

    012
  13. Alteration filed

    Install mechanical systems in conjunction with GC (-I1) NB job X01129499. There is no change in use, occupancy or egress. Filing X01378540-P3.

    013
  14. Alteration approved

    Filing X01378540-P3 reached an approved status.

    014
  15. Alteration now approved

    The latest status recorded for X01378540-P3 is “Approved.”

    015
  16. Alteration now approved

    The latest status recorded for X01378540-I1 is “Approved.”

    016
  17. New building approved

    Filing X01129500-P3 reached an approved status.

    017
  18. New building now approved

    The latest status recorded for X01129500-P3 is “Approved.”

    018
  19. New building now approved

    The latest status recorded for X01129500-I1 is “Permit Entire.”

    019