Building record · BIN 2130504

425 Westchester Avenue

425 Westchester Avenue, Bronx, NY 10455

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2130504

425 Westchester Avenue

Melrose, Bronx

A consolidated public-record view · updated Aug 20, 2026

DOB filings
3
Active-status
3
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings3
Open or active-status records3
First included filingDec 30, 2025
Latest recorded changeAug 20, 2026

The lot

What is already here?

The lot holds a 10-story condominium built in 2020, on a 19,155 sq ft lot.

Built
2020
Floors
10
Residential units
0
Building type
Condominium
Land use
Public facilities and institutions
Zoning district
C4-4
Lot area
19,155 sq ft
Building area
144,694 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building. 17 notices are on file, all with a recorded resolution.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2130504. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Dec 30, 2025
Latest recorded change
Aug 20, 2026
Highest proposed story count
10 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 425 Westchester Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. Alteration filed

    Nterior renovation of building lobby at west end of 1st floor and entire areas on 7th, 8th & 9th floors as indicated on plans. Filing X01324710-I1.

    01
  2. Alteration approved

    Filing X01324710-I1 reached an approved status.

    02
  3. Permit recorded for alteration

    DOB lists a first permit date for X01324710-I1. That is not by itself confirmation of activity on site.

    03
  4. Alteration filed

    Removal of existing sprinkler systems on floors 7, 8 & 9, and installation of new sprinkler systems for the revised areas of the 7th, 8th, & 9th floors. installation of temporary sprinkler protection during construction, and removal of temporary sprinkler. Filing X01324710-S3.

    04
  5. Alteration approved

    Filing X01324710-S3 reached an approved status.

    05
  6. Permit recorded for alteration

    DOB lists a first permit date for X01324710-S3. That is not by itself confirmation of activity on site.

    06
  7. Alteration filed

    Removal of existing sprinkler systems on floors 7, 8 & 9, and installation of new sprinkler systems for the revised areas of the 7th, 8th, & 9th floors. installation of temporary sprinkler protection during construction, and removal of temporary sprinkler. Filing X01324710-P8.

    07
  8. Alteration now approved

    The latest status recorded for X01324710-I1 is “Permit Entire.”

    08
  9. Alteration now approved

    The latest status recorded for X01324710-S3 is “Permit Entire.”

    09
  10. Alteration approved

    Filing X01324710-P8 reached an approved status.

    010
  11. Alteration now approved

    The latest status recorded for X01324710-P8 is “Approved.”

    011