Building record · BIN 2130918

2451 Poplar Street

2451 Poplar Street, Bronx, NY 10461

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 5 independently sourced records, including 5 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2130918

2451 Poplar Street

Morris Park, Bronx

A consolidated public-record view · updated Nov 9, 2026

DOB filings
5
Active-status
5
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings5
Open or active-status records5
First included filingAug 26, 2025
Latest recorded changeNov 9, 2026

The lot

What is already here?

The lot holds a 1-story garage or fuel station built in 1930, on a 4,004 sq ft lot.

Built
1930
Floors
1
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R6-1
Lot area
4,004 sq ft

Owner of record

PENN CENTRAL COMPANY

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 11, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2130918. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 3 new building, 2 alteration filing. Its latest status categories are 4 approved, 1 under review. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Aug 26, 2025
Latest recorded change
Nov 9, 2026
Highest proposed story count
6 stories
Highest proposed unit count
23 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2451 Poplar Street.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 5 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Proposed new residential apartment building. Filing X01268019-I1.

    01
  2. New building filed

    Provide new ventilation and HVAC system in conjunction with New Building X01268019. Filing X01268019-S2.

    02
  3. New building approved

    Filing X01268019-S2 reached an approved status.

    03
  4. New building approved

    Filing X01268019-I1 reached an approved status.

    04
  5. Permit recorded for new building

    DOB lists a first permit date for X01268019-I1. That is not by itself confirmation of activity on site.

    05
  6. Alteration filed

    Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the NYC building code 2022. no change in use, occupancy, or egress under this application. Filing X01448355-I1.

    06
  7. Alteration now under review

    The latest status recorded for X01448355-I1 is “Prof Cert QA Review.”

    07
  8. New building filed

    Proposed new residential apartment building. Filing X01268019-P4.

    08
  9. Alteration filed

    Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application. Filing X01474483-I1.

    09
  10. Permit recorded for new building

    DOB lists a first permit date for X01268019-S2. That is not by itself confirmation of activity on site.

    010
  11. New building now approved

    The latest status recorded for X01268019-S2 is “Permit Entire.”

    011
  12. Permit recorded for alteration

    DOB lists a first permit date for X01474483-I1. That is not by itself confirmation of activity on site.

    012
  13. Alteration now approved

    The latest status recorded for X01474483-I1 is “Permit Entire.”

    013
  14. New building approved

    Filing X01268019-P4 reached an approved status.

    014
  15. New building now approved

    The latest status recorded for X01268019-P4 is “Approved.”

    015
  16. New building now approved

    The latest status recorded for X01268019-I1 is “Permit Entire.”

    016