Building record · BIN 2130946

550 East Tremont Avenue

550 East Tremont Avenue, Bronx, NY 10457

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 9 independently sourced records, including 9 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2130946

550 East Tremont Avenue

Tremont, Bronx

A consolidated public-record view · updated Nov 4, 2026

DOB filings
9
Active-status
9
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings9
Open or active-status records9
First included filingJan 4, 2024
Latest recorded changeNov 4, 2026

The lot

What is already here?

The lot holds a 1-story outdoor recreation facility built in 1925, on a 774,000 sq ft lot.

Built
1925
Floors
1
Residential units
0
Building type
Outdoor recreation facility
Land use
Open space and outdoor recreation
Zoning district
PARK
Lot area
774,000 sq ft
Building area
1,900 sq ft

Owner of record

NYC PARKS DEPT

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not any single filing. When the rest of New York went up

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2130946. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 9 new building. Its latest status categories are 9 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jan 4, 2024
Latest recorded change
Nov 4, 2026
Highest proposed story count
2 stories
Highest proposed unit count
Not stated

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 550 East Tremont Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 9 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Construct new two (2) story community facility. Filing X00917750-I1.

    01
  2. New building filed

    INSTALL FOUNDATION IN CONJUNCTION WITH NB# X00917750-i1, TWO STORY COMMUNITY FACILITY, PARTIAL CELLAR AND GROUND FLOOR CONSTRUCTED OF CAST IN PLACE CONCRETE, GLUE LAMINATED FRAMING, CROSS LAMINATED SLAB. Filing X00917750-S1.

    02
  3. New building filed

    Structural work as per plans filed. Filing X00917750-S3.

    03
  4. New building filed

    Landscape work as per plans filed. Subsequent filing to NB X00917750. Filing X00917750-S7.

    04
  5. New building filed

    Install support of excavation as per plans filed. Filing X00917750-S2.

    05
  6. New building filed

    Installation of sprinkler & standpipe system filed in conjunction with NB X00917750-I1 for new two (2) story community facility. Filing X00917750-S6.

    06
  7. New building filed

    Note this is a ddc project, please assign this application to plan examiner anthony prignoli as he is the assigned examiner for the nb application x00917750-i1 - civil site grading as per plans filed. filed in conjunction with nb# x00917750-i1. Filing X00917750-S9.

    07
  8. New building approved

    Filing X00917750-S9 reached an approved status.

    08
  9. New building approved

    Filing X00917750-S3 reached an approved status.

    09
  10. New building filed

    Install temporary standpipe to be used during construction. filed in conjunction with nb # x00917750-i1. no change to use egress or occupancy. Filing X00917750-Z2.

    010
  11. New building approved

    Filing X00917750-S7 reached an approved status.

    011
  12. New building approved

    Filing X00917750-I1 reached an approved status.

    012
  13. New building approved

    Filing X00917750-S1 reached an approved status.

    013
  14. New building approved

    Filing X00917750-Z2 reached an approved status.

    014
  15. New building approved

    Filing X00917750-S6 reached an approved status.

    015
  16. New building approved

    Filing X00917750-S2 reached an approved status.

    016
  17. New building filed

    Install temporary construction fence as per plans filed. Filing X00917750-Z3.

    017
  18. Permit recorded for new building

    DOB lists a first permit date for X00917750-Z3. That is not by itself confirmation of activity on site.

    018
  19. New building now approved

    The latest status recorded for X00917750-Z3 is “Permit Entire.”

    019
  20. Permit recorded for new building

    DOB lists a first permit date for X00917750-S2. That is not by itself confirmation of activity on site.

    020
  21. New building now approved

    The latest status recorded for X00917750-S2 is “Permit Entire.”

    021
  22. Permit recorded for new building

    DOB lists a first permit date for X00917750-S7. That is not by itself confirmation of activity on site.

    022
  23. New building now approved

    The latest status recorded for X00917750-S7 is “Permit Entire.”

    023
  24. Permit recorded for new building

    DOB lists a first permit date for X00917750-S1. That is not by itself confirmation of activity on site.

    024
  25. Permit recorded for new building

    DOB lists a first permit date for X00917750-S9. That is not by itself confirmation of activity on site.

    025
  26. Permit recorded for new building

    DOB lists a first permit date for X00917750-S3. That is not by itself confirmation of activity on site.

    026
  27. New building now approved

    The latest status recorded for X00917750-S3 is “Permit Entire.”

    027
  28. Permit recorded for new building

    DOB lists a first permit date for X00917750-I1. That is not by itself confirmation of activity on site.

    028
  29. New building now approved

    The latest status recorded for X00917750-I1 is “Permit Entire.”

    029
  30. New building now approved

    The latest status recorded for X00917750-S1 is “Permit Entire.”

    030
  31. New building now approved

    The latest status recorded for X00917750-S9 is “Permit Entire.”

    031
  32. Permit recorded for new building

    DOB lists a first permit date for X00917750-Z2. That is not by itself confirmation of activity on site.

    032
  33. New building now approved

    The latest status recorded for X00917750-Z2 is “Permit Entire.”

    033
  34. Permit recorded for new building

    DOB lists a first permit date for X00917750-S6. That is not by itself confirmation of activity on site.

    034
  35. New building now approved

    The latest status recorded for X00917750-S6 is “Permit Entire.”

    035