Building record · BIN 2131129

2095 Anthony Avenue

2095 Anthony Avenue, Bronx, NY 10457

A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 12 independently sourced records, including 12 that are not recorded as completed, closed or withdrawn.

Open full map
newyorkdailyStreet Futures

BUILDING RECORD · BIN 2131129

2095 Anthony Avenue

Mount Hope, Bronx

A consolidated public-record view · updated Oct 23, 2026

DOB filings
12
Active-status
12
Recorded addresses
1
Building data portrait

A building-level summary of matched filings, active-status records and published identifiers.

Matched filings12
Open or active-status records12
First included filingJun 16, 2025
Latest recorded changeOct 23, 2026

The lot

What is already here?

The lot holds a vacant land on a 8,030 sq ft lot.

Residential units
0
Building type
Vacant land
Land use
Vacant land
Zoning district
R8
Lot area
8,030 sq ft

Owner of record

AG-SPAXEL 2065 PROPERTY OWNER, L.L.C.

As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not any single filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 17 notices on file; the most recent was issued Jun 30, 2023.

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.

What is recorded here

Multiple filings, one stable building identifier.

New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 2131129. They should not be read as a single construction project unless the underlying filings say so.

The matched set includes 11 new building, 1 alteration filing. Its latest status categories are 12 approved. Each filing page preserves its own status, dates, scope and source identifier.

First included filing
Jun 16, 2025
Latest recorded change
Oct 23, 2026
Highest proposed story count
13 stories
Highest proposed unit count
91 dwelling units

Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.

Address alerts

Watch this address.

Get an email when NewYorkDaily detects a material change in the public DOB records associated with 2095 Anthony Avenue.

Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy

Recorded history

What has happened at this address?

Every dated event the city has published for this building, from all 12 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.

  1. New building filed

    Proposed 91 units. 13-story residential building filed in conjunction with nb x01250532-i1. Filing X01239762-I1.

    01
  2. New building filed

    Install sprinkler and standpipe systems subsequent to GC (-I1) job. These systems are hydraulically calculated. Filing X01239762-S3.

    02
  3. New building approved

    Filing X01239762-S3 reached an approved status.

    03
  4. New building filed

    Subsequent structural application filed herewith. Filing X01239762-S6.

    04
  5. New building filed

    Subsequent foundation and earthwork application filed herewith. Filing X01239762-S5.

    05
  6. New building filed

    Install temporary standpipe for protection during construction and subsequent to the NB (GC -I1) job. Filing X01239762-S8.

    06
  7. New building approved

    Filing X01239762-S8 reached an approved status.

    07
  8. New building approved

    Filing X01239762-I1 reached an approved status.

    08
  9. New building approved

    Filing X01239762-S5 reached an approved status.

    09
  10. New building approved

    Filing X01239762-S6 reached an approved status.

    010
  11. Permit recorded for new building

    DOB lists a first permit date for X01239762-I1. That is not by itself confirmation of activity on site.

    011
  12. Permit recorded for new building

    DOB lists a first permit date for X01239762-S5. That is not by itself confirmation of activity on site.

    012
  13. New building filed

    Proposed 91 units. 13-story residential building filed in conjunction with nb x01250532-i1. Filing X01239762-P3.

    013
  14. Permit recorded for new building

    DOB lists a first permit date for X01239762-S6. That is not by itself confirmation of activity on site.

    014
  15. Permit recorded for new building

    DOB lists a first permit date for X01239762-S3. That is not by itself confirmation of activity on site.

    015
  16. Alteration filed

    Protection & Mechanical Methods application for installation of elevator hoist in conjunction w/ JOB#: X01375082-I1-VT. Filing X01452100-I1.

    016
  17. Permit recorded for alteration

    DOB lists a first permit date for X01452100-I1. That is not by itself confirmation of activity on site.

    017
  18. Alteration now approved

    The latest status recorded for X01452100-I1 is “Permit Entire.”

    018
  19. New building filed

    Install temporary standpipe for protection during construction and subsequent to the NB (GC -I1) job. Filing X01239762-P9.

    019
  20. New building filed

    Install sprinkler and standpipe systems subsequent to GC (-I1) job. These systems are hydraulically calculated. Filing X01239762-P8.

    020
  21. New building filed

    Installation and use of temporary loading platform as per plans filed herewith. no change in use, egress, or occupancy. Filing X01239762-Z3.

    021
  22. Permit recorded for new building

    DOB lists a first permit date for X01239762-Z3. That is not by itself confirmation of activity on site.

    022
  23. New building now approved

    The latest status recorded for X01239762-Z3 is “Permit Entire.”

    023
  24. New building approved

    Filing X01239762-P9 reached an approved status.

    024
  25. New building now approved

    The latest status recorded for X01239762-P9 is “Approved.”

    025
  26. New building approved

    Filing X01239762-P8 reached an approved status.

    026
  27. New building now approved

    The latest status recorded for X01239762-P8 is “Approved.”

    027
  28. New building now approved

    The latest status recorded for X01239762-S3 is “Permit Entire.”

    028
  29. New building now approved

    The latest status recorded for X01239762-S8 is “Approved.”

    029
  30. New building filed

    Subsequent structural application filed herewith. Filing X01239762-A2.

    030
  31. New building filed

    Subsequent foundation and earthwork application filed herewith. Filing X01239762-A3.

    031
  32. New building approved

    Filing X01239762-A3 reached an approved status.

    032
  33. New building now approved

    The latest status recorded for X01239762-A3 is “Approved.”

    033
  34. New building now approved

    The latest status recorded for X01239762-S5 is “Permit Entire.”

    034
  35. New building approved

    Filing X01239762-A2 reached an approved status.

    035
  36. New building now approved

    The latest status recorded for X01239762-A2 is “Approved.”

    036
  37. New building now approved

    The latest status recorded for X01239762-S6 is “Permit Entire.”

    037
  38. New building approved

    Filing X01239762-P3 reached an approved status.

    038
  39. New building now approved

    The latest status recorded for X01239762-P3 is “Approved.”

    039
  40. New building now approved

    The latest status recorded for X01239762-I1 is “Permit Entire.”

    040